127, home cinema rear spokesmen, the sound cables to be embedded in the living room below, this is very important!
125, the maximum hassle free way is to use online resources, the accumulation, save, arranging integration, ambition certainly be serviceable when.
126, in order to save time, amend efficiency, each has a gain on the decoration materials market, a detailed and practical procurement timetable and budget is very important.
account by room classification acquisition plan is easier to implement: each took to the avenues to see things the same room, to facilitate approximation and comprehensive
together, promising to have success.
one hall project
Second, the living room works
three, four restaurants engineering
, master bedroom project
five or six children
housing projects, learn projects
VII, the main Health Project
8, nine passenger
Health Project, the kitchen works
ten, eleven
balcony engineering, engineering
Yin Taiwan is now put my own plans like the table set out in the following post, for reference: file in the table as an instance. This list is used as a procurement plan
more convenient, pre-construction projects may be appropriate to re-classification by type of work merge into masonry, carpentry, electricity, water, paint and other re-tabulation. The right side of the table can also add If (emulsion paint three batches of three brush; shoe panel by Albert, brush polyurethane varnish) and so on.
115, furniture installation is best looked at in the next, especially as the wardrobe of the laminates are several holes on the choice, I was not looking at the results of the small distance between the laminates, hang clothes stretch not open, even after the correction.
79, the cabinet should be pad beneath the artificial stone after the board, with the result that there is no installation, it can not slit the meat in the above, promised to give me about two months have not installed installed (only to aesthetic once).
80, do not muddle the letter designer. Of course, you can visit several decoration companies and more, from the design in each extract something truly useful, the opener is what you want to wear up like home improvement.
55, online slots before the cement surface, surface treatment approved putty is very important, for no solid surface with a clean ball handling is very appropriate.
128, increase a sink on the terrace, decorated to embedded pipes. Balcony sink is very momentous, gardening, bathing hands.
14, ground floor, if installed, to re-do all the ground re-smooth layer of cement.
33,
free shoes online, well after the door pocket, plasterers plaster line to start the installation, wall Pihui works. Comparison of the wall of my house was originally fashioned, agreed 2-3 road on it. Pihui acknowledged when a gray lustered once, and then brush the primer, sanding afresh, after brushing, and finally double with ICI paint brush, the plenary wall looks smooth and smooth, truly good. Upon achievement of the ceiling wall, a carpenter started wardrobe. Albert wardrobe is 18cm's authorization Daixinban do paste veneer outside, however there is not furniture store to buy so good-looking, but durable, quality should be better than to buy. I'm not scared of standing receptacle embark. I am fearful that is insufficient to buy. Backplane is relatively thick, buying is slender.
21, ceiling, pay special attention to flat putty before wiping Dulux
25, Lvkou Ban the protective movie is best removed before installation.
68, designed a bathroom cupboard put clothes, no longer must worry about bathing forgot to clean clothes.
26, shoe is best to use curtain doors, deodorant. Edges can leave a shoe outlet, to plug drying shoes.
37, the socket must be considered a good location, height, interval. Even first met playing steel cassette position, the latter is base to just be put away the journal TV cabinet, microwave ovens, desks stop, had to shake the location of the first two high furniture, and finally found not only ergonomic height, but also can not buy a good eligible stainless steel cabinet legs, can only be made of aluminum foot.
52, and air leakage protection switch to use the best brands. I used the Want to buy the real thing is simple, direct call MGE investigation headquarters phone number and called to ask the local branch number.
83, fitted wash basin and mirror to be considered good, put brush cup shelf, towel rack relative position.
121, the construction? As I am not eager to stay, it maneuvers to look in casual workers: your neighbors a good home builders are threaten to transform the thing of my looking for: a mason, a carpenter, a plumber, a painter. Designed to do tread by step step by step, I deem, working slowly and deliberately.
85, put washing on the balcony to be a small cabinet, easy to put some debris, such as washing powder within the debris. Both beautiful and practical
3, on the brick part of the treatment of sun angle, the final thinking is to look at the workers level. If the level of good workers, plasterers, and better tools for grinding ceramic tile, they should not hesitate to choose the practice of grinding a 45 degree angle. In effect, at the peak of a good grinding, grinding angle of 45 degrees in the positive approach is the most beautiful! If the level of the workers do much, then you still choose to be positive angle, because the bad grinding angle of 45 degrees angle of approach is not as yang effect of article.
116, cat
ching into account the formaldehyde pollution of the environment, such as spider plants can be placed in the green room, furniture doors open all the emission of savour, but also to buy something special spray to eliminate odors.
1: the bathroom is divided into 2 areas of wet and dry on the wet area to drain better
2: If you are flaming normal gas water heater attention to the bathroom to have adequate air to set
3 - 4: If you do not know if friends can ask a professional chef, accompanied by the now more than a lie.
11: hydropower is still seeing because professionals to assist themselves for the functions in this context also inform the design of their own lives who need to be altered in the transformation of migration, yet whether there are problems when the house until you have installed the
line problems and must re-do the wall torn down was a very big head thing.
12: waterproof bathroom of their choice should depend on the bathroom floor tile floor tile professionals are there to do this in the purchase of water treatment can rest assured that when you do bad, but because the waterproof design problems in the choice of size If you meet after the designers got the idea that he would not cut off the bricks to fill the ground so that you demolished the original measures designed to waterproof tiles tiles of course, this is the early you can find, but not out live in your home is a few decades we need to assure the long-term design, so you must pay attention to the bricks in the sidewalk without creature destroyed
19 when the alignment is now bought ready-made cabinets are the most instantly is because the family The water issues need to be close to create the design, of course designers in addition to circuit design but also inform the designers set their own homes who are often under the kitchen cabinets so the scale to better determine your cooking at home more comfortable to use canvas metal cabinet recommended to choose such a large load to bear safe
tile sealant and not the same for the use of white cement, but the masons routinely use the method fill fill white cement tile sealant, so that Time to work on sealant, sealant pointing to a tiny morsel better and not dry the glue to the wall. Also, cupboard hinges, the pond water, alternate and so use the good, the cupboard stuff, pond cell body, needles tin be secondhand in general, of lesson, if you will not concern almost the money.
large package if only, I suggest to buy establishing materials to the east as far as possible to their homes, actually the home, B & Q to buy such a place can be returned.
120, decoration team choice: As the first company selected the guerrillas or the regular, I think is not important, the key is to give you the head of the construction team is responsible, the technical renovation of the workers, of course, the quality of the decoration and prices.
First, find the decoration companies not more than 4, a crowd ofis this, if your time is very rich, it is distinct matter. And decoration companies to speak about this before, must be clear that you must do renovation projects, you can call the company reported that all the decoration items, compare prices and comprehensive after taking into account the various factors and judge what the next items you want to outsource , which items to decorate the company to do.
the decoration of the human, the decoration of the attempt as low as likely, of course, inverse to the outlooks of decoration corporation. Sometimes the decoration enterprise to La Shengyi, will offer some of the heaviness of relatively low, this way, the project quality and the quality of materials is extra difficult to certify. Renovation so numerous, you ambition to term items are the lowest, it is unrealistic. And the renovation of the offer, you can not fair look at mathematics, which also depends on the content of the materials used in this project, specifications, brands and so on. You understand, the decoration of every of the quotes are really very one masterpiece to.
71, fitted with lights really not practical, the decoration done up to now not opened. There are just SHOW guests to look at lighting, I simply forgot their own also installed a this thing. When the original is to open PARTY under mythological, and now do not have much become of opening spot.
76, window beads Angeles with the Great Wall of stone tiles is a 800X800. Manufacturers cut and edging, Mason posted. Pattern did not look good also
radiation.
2, bathroom, air conditioning, no outlet design switches. Especially the bathroom water heater to a couple of class switch with a plug proper. To off to cordless, drag the plug hazardous
94, good air conditioning in order to take the line position, the power closer to the air conditioning as much as possible, so install air conditioning power cable to see part of it, leaving a trace of regret.
90, on the curtains, we had better put your stay a size goes, the boss can not be less that size. If less, then, how how the. Or watched him cut his cloth.
78, should not use white cement tiles pointing nail. Did not become a black month gap, ugly death. The results they have bought their own nail pointing agency, that tired
8, do the paint as much as paper tape
16, the living room as many as possible to install the power plug.
11, water and electricity to its own transformation plan, and ask them to open Cao straight line. Wat
ching them draw their own line, the whole line open by painting Cao. Each have their own acceptance Caixing.
92, flue gas valve back together, be sure to clean and ensure the valve can switch freely and to able to open to the most, otherwise it will affect the effect of smoke hood. To remain in the installation of two ceiling is not installed, so hood and try and correct installation of the ceiling and then installed.
67, the bathroom can point nail nail to hang something in the hook.
45, if no suitable molding may wish to custom, custom quality seems better than the sample also. More personalized and customized.
20, kitchen floor tiles will not elect white.
74, buy a toilet must be a good amount of their own pitch, or go buy a return that is really ... ...
84, bought the mirror to consider the position of mirror front bulbs, and if do not want to setup a transient mirror front lamps, mirrors the size of the cover for the mirror to be able to set aside the line of the best light.
24, the renovation period, before you gather from commerce card contractors carry
61, storeroom room. TX has been said, but I did not do doors, looks very beautiful and easy to put dirty clothes in the cupboard.
38, just around the corner in the hallway of the tube with a good, shine and have that effect.
39, did not take into account when loading the table lamp placement, it lights not in the middle of the table.
56, make plaster suitable for a large hole on the wall, of course, if the hole is too big or need to use cement.
19, before installing the cabinets must be sure your home water is OK.
15, the kitchen door, or to make a wooden decoration hanging rail wood doors for good.
5, when the steel doors steel door must be considered a good size wall frame protruding inform the installer, making the final frame and affixed to the wall tiles are flat finish, so not only beautiful, and good health to do.
77, lavatory shower apartment must be great enough size, and use perspicuous glass, shower in it will not appear so cramped.
66, to I think the mop pail less demanding in terms of representation, one can convene themselves out of covered and the circling environment that is persistent with tile or mosaic appearance, and money.
108, lumber glossy white paint brush when the polyester better than the Nitro (which is to listen to experienced painters talk.)
123, the cost of furniture than to buy some furniture. 500-700 yuan per square measure of ordinary furniture.
47, install the latch lock head should pay attention to some wax, crashing to a December to late. If you do not smoke, then the door deal must be taken to avoid abuse to wall.
113, gas change treatment best tiling complete, or there may be damage to the wall. Best to let the gas company to paint a chart or on the wall as a character of the company to be required because of the cabinet body prologues in the cabinet.
114, cabinet installatiin due time is longer, anywhere from 4 to 5 hours, or more than 2 days, must be psychologically prepared. Installation can check whether the material is used in the kind of set you (the hinge hole can be seen through the cabinet material). Before installing the kitchen cabinets before cleaning it, because once the installed cabinets, no way those die ends and then cleaning up.
130, both sides must linger on the balcony outlet, Chinese New Year lantern, good power.
65, the table afterward to the small cabinet, and can be placed on some stuff, very handy.
22, the number of living room lighting should not be too light, simple is better, or like the lighting shop!
13, many of the construction of a verbal concert into the gap checkout massacred, must be written in black and white, a change in the project are sure to ask what the price, jot it!
23, to buy things that need to be installed as the installation requirements of dealers, it does not include installation,
站着做人跪着做事, it must adhere to only pay the full paragraph after the installation! !
102, check whether the construction is necessary protective measures, such as entrance doors to use pearl cotton coat, a good skylight and floor tiling also appropriate protection.
40, bathroom tiles do not use too much dye, one easily dirty, and second, a long time, too dull!
75, Bath and Kitchen floor tiles stick better after a good amount of what the former did not do the level of the lowest point is not looking at the floor drain, or other teams did and decoration after passing, a lot of dead cells.
49, matte painting is beautiful than the high light
4, line up the pipes after the water pressure test is also very important. Test, we must be present, and the test for at least 30 minutes or more, conditions allow, preferably an hour. 10 kg of pressure, without any decrement before the final test.
35, a wall of long, high. Such as a bathroom with four walls, each wall should measure out of its long, high. And then deducting the area one of the windows and doors. Finally, a numerical ground area. After the size of the amount you can also get a sub shop selling tiles, they will help you re-match. Loss of 5 percent-plus on the line.
69, washing machines with drying is not serious and practical, in addition to one annual, only the yellow mold-day, and the malign gigantic. Thick clothes, towels or drying leave, let the sun user disinfection to be good. Even amplified, you need to save the point of silver.
70, even in the laundromat room to do a laundry pail, used to hand wash something. Originally thought to use less, so buy a very cheap Terri leader. Did not think this is really convenient laundromat bucket, became my most frequently used a washing area. What rag ah, ah socks, and towels, ah, all washed in it, and even most hands there too.
72, the biggest lesson learned is that in fact the simpler the better fitting, less pollution, less money, peace of idea.
87, do not blindly follow the online buy, I after found that some themselves to buy cheaper than the bargain.
10, washbasin as ceramic pots, glass pots downright Health
103, as many as possible to communicate with construction personnel, to determine if he understands your intentions. Put ourselves in every respect the work of the master, respect him, and people feel the magnitude of family, and began to live to whether it is more responsible fjust aboutme of it? Saying goes, is not called (But if you face a treacherous cunning tease, who, it would have to revenge, dispute) of special note to some peripheral projects is the need for co-ordination of several trades, the workers will be responsible to each other and coordinate their relative duties, Otherwise, we pass the money back and forth, all pass the buck. Like my mason to help me solve some carpentry thing, and electrical and resolved some masonry problems. Because each teacher's experience is different, at the peak of he is compliant to help you find a way.
54, without any modification of the wall angle is also very beautiful, but to advance the stage of looking for the painter and the painter clearly put forward. angle Ding Jiaoxian do help to play the straight line.
1, the partition will not be the first shoe, leaving a little space so that the shoes can leak into the bottom ash, sink and gas stove top mounted lights. Given the location of the bathroom floor drain must first think well,
ghd flat iron sale, a good amount of size. To drain the best side in the brick, if the bricks in the medium of it, no matter how kind of tilted blocks, floor drain will not be the lowest point.
60, could be considered secure on the ground of the metal socket, this socket 100 is very expensive, but very convenient, usually flush with the ground, the foot can plug a foot to pop up. Suitable for large alive room. Or on a dining room table, beneath, is used to insert peppery pot (to discourage hanging back and forth when moving wires)
99, has been optimistic about the furniture of the best down to size and then to exhibit the future situation of the virtual room.
93, so much in the living room and dining room ceiling can not do not do it.
50, if the re-decoration will use putty instead of talc products.
104, do not do the best furniture nailed, because it no longer may be some changes in the layout. If we do must grab the quality, or infinite trouble.
81, if the floor drain has been installed by the original developers that hinder foul of the
88, television background will set up a few more outlets, TV, DVD .... a put,
nike lunarswift 51 language,, you will find enough outlets.
64, inside the cupboard that the trash is insufficient practical, than on the outside. There do not install the door panel of the litter bin and table, open the door when the summer will be very smelly. Trash or on the outside good.
59, the price of elegance auto racks too much water, and found a number of relatively nameless brand in the structural design on the front line preferably than the brand, the price is much lower.
43, the color of brick is hard to find satisfactory, and I did not find, however, not satisfied with the color of the two sub-cross mosaic is a 45-degree angle to achieve the results I am very satisfied. This is absolutely the bricklayer himself put amenable good proposals.
28, it is convenient restaurant exhaust flare can also be safe, so when you eat hot pot or do not dirty grill houses the Office of the ceiling.
124, covert project was not to save money the most important place: the circuit transformation of water, water treatment.
way to do is to ask B & Q, B & Q now have individual decoration services: such as water reform, since the purchase of materials, water 40 yuan per meter, the circuit 20 yuan per meter, with 6 months warranty. Details of B & Q on the first floor in the eastern of the individual services and pricing announced, we do reference
58, Caipen leader can be sure to switch back of the hand, that must be not easy to keep clean fingers, hand turn up when the oil is also difficult.
17, is still to be done outside the bathroom shower section. A shower curtain can not pull the easy way bad, real inconvenient, water everywhere.
12, water must be good,
chi rocket cilia dryer 金玉其外, be sure to test the water!
141, must be tiled balcony! King balcony to angle around to shop, shop to life and railings to the balcony the same height. My view balcony to balcony wall angle and the life there is no shop, had prepared a bucket of wall paint, activate yourself on a regular root ... ...
142, sealed in the wall of water reform must allow the decoration to provide careful master water map.
143, if the paint color for the walls, and in power when necessary to take into list the transformation of the problem for lines. Changed a lot of my family line, air-conditioning channel bit all changed. But in order to save money, not for the entire line, but the wiring. This wiring must be installed where the whiteboard for future maintenance. Later, brushing the wall paint color, etc. only to ascertain how these white glare, apologize ah ~~~~~
144, which is the lowest level I made a blunder, I imagined that the bed 1.5 m width is 1.5 meters, forget the thickness of the bed there. Very accurately in bedside cabinet to stay well behind the lamp socket on the wall. As a result, there is no way to block the outlet used to be.
145, started before the skipper to make the decoration of the wall how to handle with the need to spade out all the original powder. In particular, prepared to paint the wall works outsourced to the company's students. My family is contracted out to paint companies, such as woodworking look after painting the walls gray only kas long asit is bad, it is best to shovel out the whole re-Pihui. However, wood has been done, to shovel out the ash is not good the original operation. Finally had to brush the surface of a layer of glue Pihui 108.
146, increase the line must be re-wiring. But the final from the nearest branch wiring. The increase is not allowed in the original wire connector wiring.
147, air-conditioning control switch only in the power supply side. Added on the line is not allowed.
148, change the location of telephone and network cable, when the original linen of the line can be drawn to continue to use. However, if the unfit construction there will be many hidden perils. So the best room of the weak from the carton to be replaced.
149, measurement circuit transformation workload is generally in consensus with the wiring in three different ways were weighed.
(1) melodrama slot pipe (at trough length measurement, if a tank with multiple basis canals, calculated according to half the number of tubes. The other half comprised in the on the head of lines.)
(2) overhead line (dressing tube not play slots), calculated according to the length of pipe.
(3) for cable, according to the number even now the number of replaced (replaced the line to acquaint the construction team do not throw).
(4) feeble reform, according to the premier means. The inconsistency is who should pay care to the languid line is bought. Owners will have less to purchase cable prices.
150, how the toilet firm to the floor, hit the screw with it? There is assembly at the base and pipeline, to buy what were sealed and the outside is better: the toilet was fixed with expansion screws. Convergence at the base and the inside of the pipe with a special sealant toilet. Out of white plastic with the deployment of white cement + water slurry. When the toilet is generally purchased with a special sealant.
151, buy materials, we must first calculate your approximate method. To buy water when the material to do anyhow, afterward meditative about a painting materials at sea design in the end how many came out, so little believe in a little while the foreman, the result was that buy the water 5 meters, the substantial use 27 bronze pate months, actually bought a 40, should the remaining 13, 7 short of the actual remaining 6. Under repeated questioning of the foreman back from the other site Details of their pre-calculated circle material, the calculated results and afterward comparing the boss of the requirements: from 30 m to 12 cord meters, network cable from 20 meters to 13 meters, other such as insulating tape, plug had great access was I correct ... ...
152, if there are old water pipes under the ground, in addition to switch hit, it tends to be damaged, do not hesitate to be the laying of new, do not save, to ensure safety .
153, bathroom walls that retraction of the mitten do not waste space, and posted a very good very good tile. Of course, that tile alignment trouble saying
154, do not use tile received positive side of the line angle to 45 degrees splicing bricklayer before grinding pretty, of course, you do not choose Tijuana workers lazy way to do things.
155, aluminum pipe, when installed must be sealed cement workers in the supervision of the construction standards in accordance to the hot water pipe Reserve space for expansion. Short plastic tube not closed strong, and lax some of good thing.
156, the bathroom floor if higher than the lobby, the conversion can be used to solve the door stone.
157, and move the sewer pipe mouth, then the new and old sewer pipes should be checked before the entrance of the old sewer butt is smooth, this time a lot of money to clear the bit to avoid future trouble.
158, Lvkou Ban did not need to buy high-price, very inexpensive Lvkou Ban has been far better than the efficacy of PVC, the more money I can not see the achieve of significantly alter .
159, buy Lvkou Ban particular attention to the keel and not Lvkou Ban itself (Lvkou Ban goal is not easy to tamper too much), the keel often complete specter.
160, the color of brick is hard to find satisfactory, and I did not find, however, not satisfied with the color of the two sub-cross mosaic is a 45-degree angle to achieve the results I am very satisfied. This is indeed the bricklayer himself put forward good suggestions.
161, under the supervision of the ground water hateful to use is not in accordance with the requirements of my bricklayer but directly gushed on the ground, it can even do! It is not the best yourself, do not bother but ensured.
162, the incline of the bathroom floor before tiling to consider the good, the incline is not in accordance with national standard to fulfill the effect of rapid drainage, and if you use a deodorant or a thin floor drain floor drain will be greatly additional drainage problems. Some people say that steep slope and beautiful, I think it is nonsense. Instead larger slope can rapidly scamper a clean water is very soothing thing.
163, the LG door with platinum point fire board, the effect is good, but might consider if we made the decoration ended door. The door by hand is not purified, for reference only.
164, sink big market brand-name price is not cheap, brand-name quality mad bad.
165, the balcony door is best to use the same type of fire board. Balcony environment is harsher.
166, bathroom vanities and cabinets to do when they have to consider the size of basin avoid good fit in the future.
167, the glass is ponderous stuff, the best buy in the neighborhood, or first think of a good manner of transport.
168, install the lock bolt head should pay attention to some wax, crashing to a December to late. If you do not smoke, then the door handle must be taken to avoid damage to wall.
169, matte draw is tall and light is beautiful, do not listen to the painter, and if it were not for brushed matte painter, said that its technology must be bad. Similarly, if a good painter, said polyester polyurethane is not lying to you
170, insulating tape and Teflon tape in the store to buy another large supermarket was much better quality, and full weight, conversion down the price is not expensive.
171, if the re-decoration will be used instead of talc putty finished, no big reason is that finished product easy to use putty. Especially after the painter fired when their own experience diy - talc tone putty sick of it.
172, installation and air leakage protection switch junction box of the project can not be provincial, but not on the outside to be on the interior, the original wage will want to save the old junction box outside the use, electrician recommended a new one on the interior, and as long ashe suggested this valuable. On the interior door is not bad, it really easy to use!
173, large decorating company directly to the workers on site clearance work may be more appropriate package, and better technology, tools, more
174, and air leakage protection switch to use the best brands. I used the Want to buy the real entity is easy, straight call MGE inquiry headquarters call number and called to ask the regional branch number.
175, the audience slight pots pots than on stage, good-looking, good cleaning.
176, basin faucet with the audience to pay attention, taking into account the basin edge thickness, leading to the mouth longer.
177, the hole in front of the toilet installation is a big, large floor drain cover can fall off, if you have installed the toilet floor drain is not installed, do pay attention to floor drain cover, or the floor drain Ye Hao lid kept it up elsewhere.
178, buy silicone, then the total best all imports of GE, GE followed by Shanghai packaging. Of course, if very important place in the 7,8 element that can also be used, such as aluminum window frames with internal Jiu-level waste to plug the whole silica gel. However, all use the bathroom GE silicone kitchen, merit for money!
179, triangular valves should not be omitted, and save much money, if the words of the triangle valve, triangle valve to be installed in advance of copper joints are not leaking, if only installed, then only the final copper fittings installed on the faucet to take over the child when it was installed to retard whether the inner leakage, the total leakage to oppression some time to test it, and install internal and less safe if the lead.
180, even in the diary has been renewed to be done about those asset, their own can do it, do not, but also with the fancy, amuse decoration companies to communicate more with the designer, amuse construction team to communicate more with the workers, because the realization of your ideas, to rely on them.
181, fitting the biggest problem is communication!
182, little place, kitchen cabinet door type designed, BH. L-type should be designed.
183, general decoration, decoration companies, excluding the formal management fees, taxes, fares accounted for 75-80 percent sign materials, wages account for 20-25 percent sign.
184, go in the kitchen on the floor outdoor the pipe, that is, from family correction to a time bomb, who say where Shashi Hou himself in difficulty.
185, if the separate tube wear, but in a tank of great? Effects can endure
186, inquire what the cafeteria and living room are separated among the most cost-effective pack Door, side pack merely 6 cm, or contaminated with white, altitude 2 m, was not large High raw.
187, muscular and weak power transfer to each tube, to divide the best way, keep the distance of 10 cm or more, but it can be difficult, because most families in order to save costs and to open a slot. Weak audio line can see the same pipe.
188, inside furniture, paint and paste board can do a good job and opened the door and ventilation doors and windows at home, only to no pungent odor. In fact, you are using a good wood core board, do not deal with furniture inside.
189, the cabinet can be 15 cm plates and wood core board, the back of the five available folders, Wuli. Package doors and Tizi use 9 per penny. Different materials with different techniques.
190, PPR pipe not only for cold water pipes, but also for hot water pipes, and even clean drinking water pipeline. PPR pipe interface with hot-melt technology, are entirely integrated into the tubes together, so once installed suppression test, no leakage. PPR pipe and will not scale. PPR pipe scale never known, never rust, never leakage, green high water material.
191, paint board is good, the advantages of both wood and composite.
192, do not publish for a long time on the wet artificial stone, unless you want to dry a typography surface; they should not be long-term wet cutting board on the table. Wet wood is sometimes fade; rub the stain with a steel ball, like hand squeeze pimples.
193, can use an ordinary gas meter in the cabinet door closed it? Need to use the shutter-type door it? Check regularly open air on the line.
194, clear contracting the tx Please note, we must validate the renovation team give you a list of materials. Their estimates may be me, I too believe that they, and the results of wires and line to buy is almost doubled.
195, the size of certain planned sanitary ware, the best limn in advance, calculate the size.
196, students pay attention to the door to buy products, if you want to pursue results advocate the panel with the business package Door, then you may must be Henzai sword it!
197, Re: installation of water pipes are put before the leader and basin, sink have bought?
not, just make sure where is the basin faucet,
ghd gold straighteners, bathtub faucet, washing machine what's on the line leading, leading 99 percent sign and fell into the water are in line with multinational norms, by the time workers are not thoughtless, all right. If you own basin cabinet, basin bought in advance, or optimistic about the size. In front of the sink to determine the value of good size units, installed in front of buy Haojiu Hang Taiwan, do not forget that the crowd or on stage. Distance between hot and cold water pipes with cement tiles must be accurate before the closure of 15 cm, and must be parallel. If you have bought, it is best put someone, such as sealed after the unpack.
198, if an 8-core cable in the meantime take the phone and network, will not interfere with each other it? Not. 1,2,3,6 hit cable module, 4,5 hit the phone module, and the other two easily. My experience was right: 10M by 1236 100M in truth used to have the speed to 10/100M that we will not feel whichever different. If a 8pin line, then the whistle will cause some program-controlled switches on the network marker interference in the home environment generally will not have anybody problem. But repose positive that I can recommend such a route will leave separately to the margin, the network cable is very cheap that you say?
199, be sure to check the distribution box installed properly.
200, fitted bath and shower faucet courses connected to the faucet pipe is embedded in the wall, and I again told them to size to get exact, not to pretend not in due time. The results left a hot and cold water is 15 cm spacing, can be hot and chilly water pipes are not collateral, the result took a plumber just put on the force feeding. Yesterday discovered that my fb leading high temperature coating device actually does obtain cracked. If we can first load leadership to the first installed it. Leader should be bought first, then install hot and cold water pipes, tiling it. Oujia bought early actuator, is Oujia main to buy.
119, on the fill paint: painting pedagogue pay is so dry wall putty achieve and then approved, the putty is dry paint. After brushing paint loaded if no cause is required to switch the lamps and manifold electrical utensils. Ask somebody to install lighting and electrical switches to remind the teachers to pay attention to this and a wash install Sin before hand, so that when installed will not be a filthy wall. Will retention a touch-up painting processes the. Of course, tarnished the walls, the decoration is to determine the paint division teams to pay up painting again, that is, the walls will get polluted wash (if it is paint companies, they also grant teachers to pay to make paint, If you pay attention to what a lot of paint division will be left in the part after brushing the wall paint, which is the remaining chapter of the paint used to make paint.) Just memorandum, do not let install lighting division to pay soiled walls, paint can make teachers pay less for a trip (or at least half a day), but also assist a lot of our own, and why not? Sometimes, with people easily, also has been simple. In general, a house painter will paint before brushing the Wood, Wood to do so is to lest the process of dry brush would paint the walls of the wall impact. Of course, in actual operation, you can also Puwan after tiles (layer tile wall of the putty has been approved before the good) painted Wood, Wood, etc. after whitewashing paint dry, but to do so, of course, will affect the period. If the panic of affecting the duration of the circumstance, but also the impact of the wind to reduce dust, then point to a lot of hard-working to clean the room, the health of the.
95, to personally measure and disc all the accessible house sizes, size map will be covered 楼书 units and then re-wire tagging, the ultimate size will directly affect the interior design and furniture purchases.
118, Brush Wood of the time: the best Puwan other rooms painted tiles or wood flooring. If you must brush, the best must clean the room. No floor tile or wood floor room, the room a lot of dust, then brush Wood, then brush off the dust easily attached to the surface of wood products Wood, feels a tingling feeling, although this can be higher label and then brush again sanding solution, but in the end it feels to feel the brush and the overall effect will be a deduction RBI. Puwan brick room after the brush, when the dust content in the air before the shop a lot less than the basic Wood does not emerge again after the dust brush appendix on the surface of the wood products. All that being said, because a small renovation to hit the Wu family position, I had decided to buy the hello seen it before Wood added the effect of brush, and feel very smooth, feels like my home-improvement Howley, like wooden doors. Only because of the above, the results of effects to play a lot of discounts, it has been labeled Wu regret things. And I buy in the union hi the process of addition paint, some students appeared in this family. So to remind students to take note of here. Wood I do not know whether the other case, but according to the principle of same reason, so here to remind students to pay attention to it.
7, under the bed and the bed board must be breathable. Bed board is best for general use cedar board
110, wardrobe rather more not less, rather big not small, the women memorize! Dangling from the longest space to be able to dress down.
89, change the water well in the future to be considered before loading in the wash basin in the bulk sample, case in point, the left or right pots pots, water and drainage that is located in what place. Otherwise, changing for the better after the finding phase of the wash basin was not fit!
82, bathroom tiles affixed to the ground after a good test the water, if water is relatively slow to rework quickly. Our household's water is relatively slow, then relented a bit, it was always a little bath water, and made hundreds of our main Guardian have idle money in the shower head, and wonder how the aggregate now relief.
46, bathroom cabinets with stainless steel legs are colossal profits to find some local stores to buy back price of mad cheap.
109, the cabinet must be carefully chosen, compared to more than a few quality, we go to do a solid firm, because this one is easily thousands of ocean, and related to the stove and sink and so on, so it is still not to indulge in corrupt cheap good. But best not to do in the cabinet table or inside the trash; there is, if asset are restricted, basket, basket seasoning, rice bucket of what you can do all of these components in the cabinets sell the company in general is very expensive.
27, cutting and a small safe place to light.
86, must be staring at the upstairs upstairs to do down the dripping water .... otherwise, get the wall cabinet, the wall is a mess ....
29, the door is best to prepare a place debris in the cabinet, can be placed on top of shoe. The common things, such as umbrellas, bags, scissors, change, dine the medication, and so on there, so it is convenient.
30, there is no need to use your ceiling, if it were not for too anxious about moisture and cooking fumes, moisture-proof gypsum scrubbing brush is recommended to use waterproof paint, my health to do a guest, very beautiful. If you must use Lvkou Ban smallpox, it is recommended:
1, not too expensive.
2, using the net color, particularly in the kitchen dome, pearly above the agreeable, the color pearly unless and elaboration style match, it will lightly incongruous.
3, download their own ideas, do not believe selling the vision of smallpox, their vision was warmhearted taint.
4, staring at himself in the scene, closing side is very important, do not let them lax, or quit a dark sew, how to look how ugly.
98, the main furniture such as sofas, wardrobes, dining tables, chairs, cabinets, etc. had better take a look for advance, if the running around on the tired, you can find a few good large-scale home shopping plaza shopping, the basic trend to see it, so the next thing you do is based on their lusted style percolate out the right things slowly. Some people take good style, when others grasp of color standards, it does not matter, anyway, there is time to consider, if you wait until clearance decoration, furniture, help wanted steps to go in the final will reluctantly accept the inevitable and not very much.
101, during the construction projects are sure to addition or dwindle the price they asked for and then write it in black and white.
6, carpenters and masons of the package Door tiling is to knot in, including door pocket of the time, to consider the following ground (the ground side of the door both side) is also affixed to ceramic tiles or other cement mortar thing, because if you stick tiles Mentao well before the identify has been package to the ground, with cement when the future, if the cement and Door tainted, moldy water will cause wood Door
112, shutters, furniture, family appliances in the whole approach is best and then made to match the overall style tone. However, before cleaning can alley installed.
106, according to their actual needs and reasonable preparations for wiring, so as not to waste (especially the fabric with a lot of lights and lighting if I were you practical, we must also try to avoid tandem use, waste electricity), but some places can not be Province, case in point, next to the bathroom mirror, hairdryer and shaver to often; well inside or below if the shoe has a socket is good, can bake shoe device, I now regret not quite this wire cloth.
97, began looking for decorators. To personal experience is concerned,
nike air running shoe, if not particularly large size and intended to simple decoration, it seems more cost-effective to find some of the guerrillas. After installation it is best to introduce people, you have read and coincide to the eyes, especially the feeling of the human in charge of the decoration is more important, duty and appreciation of how, some of the former is more fussy, because if not a stripped-down, in fact, those who live almost on the outside will do mix, but the quality is good or bad may depend on a sense of duty.
36, the best is a two bedroom roof light control, and a door, a bed, lying on the bed save the winter and then it turn off the light.
105, be sure to change the water carefully, one dictate of money; Secondly, if you do not need from the floor to the ceiling laid down water pipes, water pipes in case of a problem to big trouble.
48, Paco the floor well, I like to remind that the only directly to the employer about the price and the salesperson talk about than the price better.
63, is not practical twice bar towel rack! Like the present and uses a single rod, hanging rod base layer will not look inside and then drying towels
51, installation and air leakage protection switch coalition box of the project can not be provincial, but not on the outside to be on the interior, the original compensation will want to save the age junction box outside use, electrical propositions put new ones in the room, and now thathe recommended this invaluable.
100, the necessary documents to buy something good must be preserved, a move that may exist on the post-retirement, a replacement will definitely benefit. In particular, some important items of the store receipts, brochures, etc., because a lot of things have a warranty period, the testify lost would be more trouble.
34, other students in the tiling must pay attention to the retinue points:
① best he can in the scene.
② some less than faultless tile can additional in the future some workers do not see the location, such as cabinets, sinks, mirrors behind, but also pay attention to tile, brick, etc. Do not waist is more than the workers attached to the position, otherwise You can not see anything in the future, but also wasting money.
③ wall tiles, floor tiles in the paste before the torrent damage must be enough time.
④ sure to floor drain plug with something good out of cement down to prevent clogging. My family just because off the cement floor drain is blocked, and spent 30 looking for the management bureau to clear, wake a lot of small muck.
⑤ people at the scene, the workers will not be too wasted tiles. Tiling my family when not at the scene, then go, wasted a lot of bricks, it is the heartache, all the blood and perspiration Mimi Yeah.
32, although taking into account the custom-made cabinets look good, but not durable, comprehensive views of some of my classmates online and experience, to counter the structure of using cement to do, inside and outside the sides stick tiles, marble countertop shop, wall cabinet and cabinet wood door or chosen to do. Out of the cabinet to do so durable, moisture-proof. And spent another few. Read a good many of his neighbors say, I did not beat.
117, installation of combustible gas, booking gas ignition.
73, useful stuff:
① designed storage room.
② North Terrace sink used to wash the dirt. Differences between the washbasin and toilet and washing vegetables for the kitchen sink.
③ bathroom can be pulled out of the leading shampoo. (TX shampoo basin was never an exception.)
④ easy to clean the floors and the appropriate cleaning tools.
⑤ work lights the kitchen table.
53, the audience delicate pots pots than on stage, good-looking, good cleaning. Basin mixer with the audience to pay attention, taking into account the basin brim thickness, leading to longer mouth.
9, buy a lamp to note: General tried to use glass, stainless steel, copper or wood (shelf), and generally do not buy any other coatings plated iron above, ah, ah nobody like paint, easy to disappear.
42, Lvkou Ban did not need to buy high-price, very cheap Lvkou Ban has been far better than the effect of PVC, the more money I can not see significantly different results. Buy Lvkou Ban particular attention to the keel and not Lvkou Ban itself (Lvkou Ban goal is not easy to tamper too much), the keel often complete ghost.
18, do door and frame materials to choose nice grained materials.
122, to use every cent wisely: look at the decoration materials, he must be looking exhausted, there are so many good things, it seems, like every unattached look, and economically able to withstand . A short time of time to make all these things can be purchased in place, the economy pressure is so big. Most people at this time is often in muss, the results of the last one also much over budget, the second is the U.S. price of the first things to buy high quality, then buy something is mixed.
My view is:
one pre-determined price, after the co-optation materials.
excess of the anticipated price of 10 percent-of material merchandise, do not waste time. Business is always fine too buyers. I am act a detailed schedule of materials needed in the future will be posted in the post for your reference.
Second, you could save on the province, the bloom to bloom.
the most priceless area is carpentry, kitchen cabinets.
most disposed to water quality problems is the transformation of the place, kitchen and restroom water.
107, the bathroom as wet and dry space, if area is small with a base like (special glass basin was dirty, idle with admonition); conditionally set a waterproof cabinet incorporating small debris is best, what is put certainly does not look good on the outside.
41, outlet to more equipment, furniture to buy outside the ground to dirt security to consider, favor to see more housing, in rule, should adhere to.
131, at the entrance to the light switch, we recommend using inductive type. Black day home, save the dark.
132, note 1 basis construction, water, electricity transformation
(a) before entering the construction teams on the water to minute test, before they are allowed to change management.) and can knock down the plaster layer, load-bearing walls for installation on the
(c) in the buried line of control If the original line to be changed, and can not use
(d) circuit to be buried in the dingy wall of the best
(e) strong electric
(f)
133, waterproof
(a) kitchen, health,
(b) 30 cm away from the wall to do it twice, more than 30 cm can do it again, wrap need the waterproof door pocket door.
(c) waterproof finish to be dry, the Redo waterproof layer. Most likely the leak is the
134, tile
(a) the employers is necessary in the culling of tile for tile quality finds its way: first, to see its color is uniform, non-mottled black blots and small chasms the line; followed depends on whether the criteria of its size, the amount of tiles with a tape measure the length and length, measure out the size of the plant size to be consistent with its trademark, the diagonal and then the amount of the tile, such as the crooked line, then the tiles is affirmative; then look at the flatness of the tiles, the most simple and efficient method is to tile the same mark of two overlapping positive and negate, such as overlap significantly after the breach between two pieces of tile or you can turn the tiles irregular; last look There is no color tiles, the method is to take out a few specimens of the same type of tile, in the light are likened, such as do not see the color difference can be ordered.
(b) After the tiles stick can not have a whole piece of brick hollowing (local hollowing whole piece of brick can not surpass 20 percent sign), if the needs of the entire film Brick hollowing rework normal circumstances, Post 100 per brick, brick wall tiles are allowed to have a hollowing, brick tiles are allowed to have two hollowing, but must rework, rework the main material (already counted in the detriment among) from them, such as Over this range, the main material responsible for the construction.
(c) Under natural circumstances, the level of tile degree of error tolerance of 2 mm, the gap to be consistent with tiles, bricks and tiles should be flat on the edge (allowed misdeed of 0.5 mm), kitchen, health and brick wall in addition brick and tiles should be flat on the corner, the need to level degree (misdeed to allow 1 mm) and perpendicular (allowing 2 mm error) to achieve, bathroom, balcony tile floor drain should be considered, you must first put away slope, if there is no special reasons may not have water.
(d) in the wall and floor tile Puwan required after the
135, anti-termite
(a) kick down the walls and the trough in the waste after, a comprehensive anti-termite (termites sprayed the whole house that drugs)
(b ) After the entrance of all plates in need of anti-termite treatment (specifically made for wood termite category)
(c) necessitated before wood floor shop to mart on the ground to do a wood floor termite
(d) termites spray to wet the narcotic is favored (you can apparently see the wet)
136, the calculator is also a research dollars, and now the calculator has multiple functions to set the decimal point, production operations will have different standards when, so we need to send a calculator yourself, and now mobile phones have computing capabilities, but the functionality is not good.
137, two better prepare themselves neutral glass, plastic (1 clear, 1 white), recommends to the General Electric Company, B & Q for sale, 49 a. Pretending to bath room, sink, cabinets, security doors when they need it. While the general factory installed package will come with glass, plastic, glass plastic, but most of them poor quality, easy to change color or mold the future.
138, if only a last resort, do not use toilet seat shifter. This stuff is very threaten to reason clogging toilet bowl water.
139, Lvkou Ban kitchen, two above the hood, open the holes we have to wait a good hood completely up security after installed. An early and I go home, and later removed to install hood Shiyou, individually and put them all out of shape by workers, seamless ceiling has become a ceiling joints.
140, if the intention of uniform appearance, is also fitted kitchen and bathroom doors, and that presently after the installation on the door apparent with the ground glass joints where glue. I do not have time for processing, water workmen are not detailed, a lot of water splashed on the ground infiltration to the door border, the emulating part of it has been a little black (mold) of the.
111, such as glass or mirrors not handling things the best buy in the neighborhood, or first think of a good means of transport.
31, the third daytime and proceeded to mallet largely perforated tiles, scope hood, and water heaters to pre vent lay, and if so then perforated tiles mallet better, not easier. Therefore, before the renovation must be elected in the range hoods, stoves and water heaters, to determine the size of punch.
96, line a bad choice if small size of the black walnut is always enough air, then need to have choice, or to adjust actual or accompanied their own ideas, of course, be both the best
91, the decoration of the construction process:
(1) approach, destroying down a wall.
(2) bathroom, kitchen floor to do 24 hours of closed water tests (required the developer to complete this task.)
(3) cutting trough, water, electricity transformation and acceptance.
(4) sealed underground water hidden trough renovation project without closing the water leakage test started waterproofing.
(5) bathroom, kitchens wall disk.
(6) Carpentry approximate, suspended ceilings, plaster moldings.
(7) archives Door,
mbt walkers, window cover. Making wooden cabinet frame.
(8) simultaneous product of wooden doors, plastic doors and even pressure.
(9) wooden plate paint brush dust (food vegetable oil).
(10) leveling the table laying cruel windowsill.
(11) wood trim panel, pasted, fine line production and installation.
(12) wall primary dispose, grinding, leveling.
(13) belongings, the door seams paste stickers (defended side).
(14) ICI oil for at least three times the wall.
(15) furniture painting approach, eye patch and paint.
(16) dealing with corners, laying floor tiles, wood or composite wood flooring, waterproof marble bar, skirting.
(17) lighting, sanitary ware, handle, door lock installation.
(18) clean up, floor tiles make up joints, dismantling.
(19) decoration prefatory acceptance within the company.
(20) three formal acceptance of date, allocation owners.
44, on the balcony on the altitude cupboard, then hit the back of the cabinet with a floor of waterproof insulation foam board works well. Balcony door is best to use the same type of launch board. Balcony environment is harsher.
57, frosted glass on the back do not coated with paint to protect the hard to clean!
129, toilet, kitchen need background music, audio and audio wires embedded before the renovation.
62, starting bed frame (which is so called up.) I am a professional company to buy the cloth-bed bed, and spent 350 yuan additional such a thing, end of the bed there is a pull handle, the bed board will be rotated up, exposing the base of the storage space, what a great Oh!