The new underground pipeline wellhead
belong to different departments network covers
Jinan Qilu March 22 (Reporter Yong group) Reconstruction of East Road, Jinan, culture, culture through the three has been provisionally West months, however, car to drive to the road is covered with all kinds of covers, face than before the covers were added to the surrounding residents have called for, and now the entire road looks , the relevant departments in urban construction, should make overall planning, underground pipeline deal with the public sector.
covers an intersection about 50 children involved in a number of departments
this morning, this reporter went to Swallow Hill Road intersection with East Wenhua Road, the reporter under the green belt for the road junction industry statistics a bit rough, the intersection of nearly 50 manhole cover, written on the covers gas, traffic police, electricity, China Unicom, network, stormwater,
coach outlet store online, water supply, street lighting, sewage, heat and so forth. Subsequently, the reporter from the Swallow Hill Road, East Road, walk west along the culture found on the road that covers quite a lot, network, sewage, street lights, etc. almost every fifty-six meters have multiple wells located in the motor vehicle lanes and sidewalks on.
road to the former covers a lot of the children added a
reporter learned, cultural East, West is the culture from June 2010 to implement transformation, the transformation is 80 years since the last century,
mbt shoes store, the first time since the completion of large-scale road reconstruction, renovation project west of the Seven Road (pole stone bridge), east Second Ring Road, the focus is widening fast lane, by Construction slow one, resurfacing sidewalks and barrier-free access, construction of parking bay bus station,
coach factory outlet, placed traffic isolation facilities, to upgrade all the pipes into the ground.
manhole cover on the road said.
learned, cultural East, West and cultural transformation project has entered the final stage, the transformation of the whole section after the inspection wells were 2392,
nike shoes uk, including the new 1740.
coordination of underground pipes should be shared more units
lived his life in the surrounding Grandpa Wang, densely covers the road watching helplessly said, shaking his head, also do not see so many covers, the road really shocked me to the whole road like a balm after doing general surgery. one covers belonging to different companies to Take for network and China Unicom, the two can not use a manhole cover, the use of an underground pipe it? really want to come out under the coordination of relevant departments, so that the next major corporate sector to sacrifice their own interests, and more for the sake of the people.
(Editor: SN021)