1. upfront design - 2. Subject Chaigai - 3. Hydropower Reform - 4. woodworking - 5. tiling - 6. whitewash finish - 7. kitchen ceiling - 8. cupboard installation - 9. doors installed - 10. flooring installation - 11. tiling wallpaper - 12. Radiator Install - 13. switches and sockets Installation - 14. Lighting Installation - 15. metal ware installed - 16. curtain rod installation - 17. Pioneer cleaning - 18. Furniture approach - 19. Appliance Installation - 20. home accessories
decoration, generally done in accordance with the 20 steps. Now, with the best of my anti-death or can be, I now understand the renovation process and the whole process many details that need attention as much as possible detail over ... ...
one part of the decoration the whole process of analysis of 20
(a) initial design
same construction, and the difference is that the bees, the bees build is a reflection of instinct, and people in the building before the mind to form ideas and framework first. So, if the metaphor of a battle home improvement, home improvement then the battle-front design is the So again, dead last against the chapter,
in the initial design, students must also do one thing, that is, their room for a detailed survey, we do not make the lazy, the best measure yourself again, measuring the content mainly includes:
1, clear the area involved in the renovation process. Especially the tiling area, an area of wall paint, wallpaper area, floor area;
2, clearly the main wall dimensions. In particular the need to design the future size of the wall of furniture.
I remember my last with my foreman accordance with the Re-survey, the foreman turned and scolded bricklayer, said: Fitting with the truth in many places, like - we say it does not quite understand, but the heart must have a number.
take the opportunity to remind everyone, do not forget to start before the start procedures for the property, pay the renovation deposit.
(b) of the main Chaigai
into the construction phase, the main Chaigai is the first on a project, including tearing down walls, drywall, plaster shovels, demolition of Heating, for plastic-steel windows and so on. Subject Chaigai said plainly, is the first first take up the framework of the site.
(c) transformation of water before the water circuit
transformation, the main structure should be basically completed Cagai. Transformation and the main hydropower Chaigai links between the two, some students may know, the cabinet should also be the first measurement. In fact, the first measurement of the so-called cabinet and no real content, because the walls and floor are not dealt with, cabinet designer can not give a specific design size, but only reserved for developers on the nozzle, the location of outlet hood make some recommendations. Include:
1, to see whether the location outlet hood after the hood of the installation;
2, take a look at the suitability of the location of water meters;
3, to see whether the location of the outlet to facilitate later Install the sink.
first measurement for the cabinet, slightly experienced students can complete on their own. Water transformation is complete, followed by the toilet water is best done. Water generally do not need to do the kitchen.
some students have always thought that before the start of renovation, some ingredients should be pre-admitted. I would say, unless it is the main ingredient used Cagai need, otherwise, such as tiles, and other ingredients of the approach time Daixinban should be modified after the water. Because the circuit transformation involves slotted on the ground if so, tiles, laying position Daixinban properly, workers moved around quite a trouble. Two days before the
(d) Woodworking
carpentry, bricklaying, construction of the oil workers are part of the Basic principle is played - who who should the dirty. In fact, as the package
riser, do decorative ceiling, attached to plaster line like carpentry sense can be used as a small part of the main Chaigai consider the circuit itself and the water does not conflict transformation, and sometimes need some cooperation, such as mentioned in my last posts - br> (e) tiling
if workers are too busy to open the case, the general foreman in the itself is no conflict.
in the Window-stone floor tile installation can be completed together, you can also after the floor tile, marble, usually in the window cover the installation of window well after the installation of marble, glass, plastic workers will be prepared, smoothly put the marble and glass plastic window cover seal the.
2, floor drain installation. Floor drain is the decoration appears as the first hardware, as it should and floor tiles together with the installation. Therefore, the students begin visiting the building, it should catch the early children to buy land drain.
3, range hood installation. Hood was the first appearance of the home appliance, kitchen tiles laid, you can consider installing a smoke machine.
(f) whitewash finish
Prepare students wallpaper, just to let As to whether to stay the last time finish, personal feelings do not need too seriously the problem child, renovated from my experience,
Monster Beats Headphones, the significance of left over paint is not great, because the painting behind the operation of no more than a dirty again .
write to you, death breath against the children, chatting with you two. When the The reason why we feel this is because, it is generally understood decoration decoration only
If the . Children drink water and continue ... ...
(g) kitchen cabinet ceiling ceiling
as the installation link at the head, or in the extension of the house While in the kitchen ceiling, kitchen ceiling moisture, exhaust fan (Yuba) should have been bought. Students better to kitchen ceiling, exhaust fan (Yuba) also installed, or leave the head and outlet openings.
take the opportunity to insert one, I insisted,
Dre Beats Headphones, , wallpaper paste how to how professional, how to create useful cabinet ... ... In my opinion, renovation team can do is carpentry, tiling, painting
because I believe that the construction professional, I believe that manufacturers install level, I believe that the product pipeline operations, most of the manual workers than the slightly better team decoration. Decorated like game, gambling is the craft workers, so bet on The reason why so many students
decoration company, renovation team take a lot of construction tasks, the reason one hand, their time was not good, because there is a consideration, I had decided to outsource water reform, and neighbors to remind me: link up a lot of trouble later.
fact, every aspect of the decoration of independence are strong, I remember while back, the students forum also raised questions about the South, said he decorated his home there, the owners of each link are dedicated workers, please do. So something for home decoration,
Monster Headphones, their interface is really nothing to speak of, but rather the students themselves play in the home improvement process should be as much as possible the so-called the relationship between the workers and so on, this is a key.
really want to say because the tube
decoration, quality is always ranked first, is the main contradiction is the principle. Some areas because of Students in preparing for the secondary contradictions in the main contradiction in principle to make concessions at the same time, need to be careful.
(h) after cabinet installation
ceiling can be installed around the cabinet door. Hopefully, one day to complete. There are also tank installed (may not include the upper and lower parts of water) and gas stove, cabinets before installing the best coordination of the gas through the property, because the gas stove gas test is required after installed.
right, just said that ceiling, there is a problem worthy of study, many students choose waterproof gypsum board ceiling kitchen with waterproof paint, decoration team generally offer more than 120 yuan per square meter, than the average Lvkou Ban, PVC gusset ceiling should be expensive. Gypsum board ceiling looks visually smooth, but after the top of the water if there are problems, or upstairs, downstairs, with the need to repair leaks, gypsum board ceiling is necessary to dismantle the whole, much more than pinch ceiling trouble. Therefore, we select the gypsum board ceiling in the time needed to be careful.
(ix) installed in the cabinet doors installed
the day, early in the month before the doors of measurement is complete, now about the installation. Hopefully, also the day, put the door at the same time to install the hinges, locks, ground absorption. Students should be prepared in advance related to hardware.
doors if you want factory-installed window cover, Pass, then manufacturers of wooden doors, should be measured when measuring and installation of wooden doors, the same day to install, taking into account the marble window sill installation time back wrong row after installation in the window cover.
Note: wooden doors of the production cycle is generally one month, so in order for the duration of convergence close to the main doors as early as possible after the completion Chaigai door manufacturers to measure the size of openings. On the treatment of openings, we need to note that the height of inconsistency if the house doorway, into a high need for workers to deal with - good-looking.
(X) in the wooden floor installation
installed the floor can be installed the next day, and goes well, also the time of day. Floor installation requires attention to the following questions:
1, before installing the floor, best to allow manufacturers to door survey about the need for leveling the ground or in part, leveling, and some decoration or renovation of the company team will advise students leveling leveling the ground or in part, to flooring manufacturers subject to the actual investigation;
2, flooring installation, home to the ground floor pavement cleaned, to ensure that the dry ground, so do not water cleaning process.
3, floor installation, able to do so, be sure to cut the floor in the corridor. Before the Forum also discussed this issue, some students think that cutting the floor in the corridor pollution in public areas and immoral. My idea is, after completion of sweep, it does not matter. In the cutting room floor on the wall of the pollution is serious, there is a similar artificial stone cabinet cutting table, I believe the number of students have renovated experience.
(k) the floor tiling wallpaper
the second day of installation, clean up the house to be about wallpaper Stones, and goes well, the same day. Able to do so, paving the day wallpaper, the floor should do about protection; no conditions, no problem to clean up the floor to the pioneering legacy of the wallpaper glue cleaning is also no problem. Before paving wallpaper, wall to try to make
(second) radiator installed
wallpaper paved the following day, replace the radiator or radiator Chaigai sense of the students can hang on the wall of the radiator. Same day.
doors - floor - Wallpaper - radiator, which is a generally accepted correct installation sequence, first floor loading door is to ensure that the baseboard and doors in the door pocket to close bonding; after wallpaper installed mainly because of the dirty floor installation, dust and more serious pollution of the wallpaper. Used again here in front of me said, Finally, because only the wall mounted radiator is laid out to install the radiator wallpaper.
successive phase renovation process that is restricted in the various constraints and conditions are designed. Occasionally there are exceptions, such as the need to install the floor Holtz doors installed after the door, but such exceptions are rare in the renovation process.
In addition, in front of me repeatedly that We also try not to time of day while the two appointments to install, especially those mentioned above, To learn to comfort themselves - we are not bad that day.
(m) switches and sockets to install
death sentence against the only reminder: students should switch between home and the natural outlet of each number, location and other issues have a detailed understanding of, or records, especially for the wallpaper paste students, workers sometimes irresponsible wallpaper, wallpaper covered hula to a sudden, he would not have wallpaper knife in your opening marked the location of switches and sockets. Therefore, the students still need their hearts.
(xiv) lighting installation
installed lights, nothing to say. Bahrain lights, home to bright, bid farewell to the renovation of 100-watt incandescent bulbs during the glare - feeling good.
(fifth) metal ware bought up and down before the installation of water pipes
parts, bathroom accessories, toilet, drying racks, etc., be installed on both. In front of those Is no exaggeration to say that you first open the water watched the dragon, gave it a good name -
(XVI) curtain rod curtain rod installation
basic installation marks the end of home improvement.
(XVII) Pioneer Pioneer
cleaning before cleaning, do not install curtains, remember, Pioneer cleaning, the family not to have furniture and appliances are not required to keep more of the
(eighth) approach
furniture furniture purchase on time, my suggestion is that the earliest complete transformation in the water circuit, so select the basic size range of furniture was generally a number of our hearts. Therefore, some students before the start of the renovation has not been eager to set the furniture, no need for personal feeling.
(xix) to the appliance approach
this time, the appliance of the approach of the approach, the installation of the installation, ready to check out!
(xx)
home accessories, home accessories, home improvement the last step, and has been decorated by the fitting into, including the installation of the curtains are all aspects of home accessories. As for buying curtains, preferably after the furniture in the set to avoid style conflicts. Home accessories also can consider buying some green plants, wall paintings, decorative arts and crafts and so much more ... ... In short, stay, you can freely play.
Second, the fitting process by
read the first section of the two students may feel a little chaotic, in order to facilitate a better understanding of all the 20 steps, and some need to pay attention during the entrainment link, anti-death in front of it with 20 Subject Chaigai - 5 door manufacturers door measurement - 6 cabinet for the first time measurement - 7 Hydropower Reform - 8 toilet water - 9 ingredient approach - 10 Woodworking - 11 tiling (installed bay windows, floor drain) - 12 to install smoke machine - 13 second measurement cabinet - 14 whitewash finish - 15 kitchen ceiling - 16 Pass Gas - 17 cabinet installation (to install the sink, gas stove) - 18 doors Installation - 19 Floor Installation - 20 Stones Wallpaper - 21 compressor units - 22 switch socket - 23 lighting installation - 24 metal ware installed - 25 installed curtain rod - 26 Pioneer cleaning - 27 Furniture approach - 28 Appliance Installation - 29 home accessories - 30 to move
(a) the whole process of renovation by
rough outline four steps that, according to the text mentioned in the beginning part of 20 classified renovation of the entire process can be divided into the following four areas:
1, the design aspects; (1)
2, construction of link; (2-6)
3, install the link; (7-16)
4, ending link. (17-20)
(b) six-step the whole process of fitting
in accordance with the engineering characteristics of the division, according to the 30 areas just mentioned by the decoration of the whole process can be divided into the following six steps:
The first step: design ideas; (3)
Step two: the main Chaigai; (4)
third step: hidden engineering; (7)
Fourth step: covering engineering; (10,11 , 14,15,19,20)
fifth step: the installation phase; (17,18,21,
monster beats,22,23,24,25)
Step Six: the ending phase. (26,27,28,29,30)
specify:
1,
bose headphones, to distinguish it from the bees, we must first have design ideas;
2, the main Chaigai is to completely change the rough housing into the site. Including the contents of the above, the main Chaigai just said - surgical techniques. Concealed work to do first, that is, we often say The window cover woodworking, Pass, bricklaying and tiling, window-stone, window installation, oil painting work - wood, tile, oil is the basis of these three projects, the back wall panel ceiling, floor pavement, after wallpaper , clothes to wear even finished;
5, the installation phase, the main completion of implementation. Including: cabinets, doors, radiators, switches, sockets, lighting installation, hardware, sanitary ware, curtain rods ... ... Each item has its established function;
6, final phase, plainly, is to not constitute
by Section II,
decoration only be known to do (keep the spare)
experience, so you avoid detours.
1. mattresses are too soft
2. If you will be cooking at home high frequency words, try to give up the open kitchen, there will be cooking fumes
3. Toilet, Kitchen small water Po, hot water faster, more convenient use
4. Range Hood Chinese suction stronger than European
5. power outlet can be installed as much more decorated Otherwise, drag strip at home everywhere
6. toilet outlet side must be set aside, or washlet can not install
7. PK shower bath, a second election, then it is recommended that shower, bath installed, I have never had bubble bath is not a minority. Shower does not mean shower room, shower room glass wipe up or tired, you can also select the root shower curtain hung
8. If there are two bathrooms, install a bathtub is still necessary, large bubbles clothing, to help the baby shower is a good choice, do not have a jacuzzi, not bubble a few times, but also very expensive
9. If not, the people are not cooking, the kitchen is best to install air conditioning
10. If you like the Internet, every wall of every room, are set aside at least two Ethernet ports and two or more sockets. Wireless router can indeed solve the problem, but said sometimes still unstable
11. regret the kitchen flue does not break out, and now as long as the building was cooking, range hood off their own machine to be opened simultaneously, or a room full of smoke smell
12. room location of all outlets, and later bought the furniture size of a deviation, wasted a lot of outlet
13. If What to buy at the mall are, just do not call a carpenter! ! ! ! ! Unless the carpentry skills quite well
14. Floor slightly lighter color, not easy to see ash, but slightly dark kitchen tiles is not easy to find hair everywhere, so that in the best dirt
15. the restaurant is best to put on a ceiling fan, super comfortable
;
16. Reserve object space as much as possible that after the arrival of the debris will need to incorporate more and more
17. terrace wall tiles better than the more waterproof coating
18. regret buying was installed so many lights,
Beats Headphones, in fact, several fixed used to it. . .
19. toilet toilet table is glass, super easy to dirty
20. bedside forgot to install switch, turn off the lights every time out of bed in winter, very sad
21. bathroom hardware, faucets and the like is definitely a stock price of a sub-
22. decoration not rub as far as possible not to leave the place, dead health is difficult to engage
23. in the future plan to families with children, must be considered a good size, the bed can be placed next to the reserve position of the crib
24. recommended that all hot and cold water faucet is installed, decoration equipment that can not spend more than a lot of money, and afterwards to fix the super-difficult
25. the room layout as little as possible is not practical RMB paste sooner or later opinions do not tear down obsolete!
26 . buy anything inside the door when the size of attention at home, do not lift bought into
27. Jiaogan good solid wood floor but needs maintenance, laminate flooring clean up easy
28. invisible door is impractical, to have trouble driving a breathable
29. walk-in closet nice idea, but easier to fouling, open-style shelves, racks, etc. (not the kind of door ), good-looking is good looking, but good pain ah rub together, especially in the book, a layer of ash
30. lights must not be rushed, and that after waiting for fouling hang it
dozens of classic effects of recommended home improvement!
design theme-based wine culture, the mutual reference point font should be
the concept of the whole cube geometry, color
kitchen reference point, reference point wall powder Television wall color reference style
background modeling
Television Television Television wall reference point video background modeling and color
reference room wall and furniture with the overall shape of the kitchen ceiling and wall
information processing
TV wall and ceiling reference links
overall texture of glass curtains
classic sofa texture background
attention to the kitchen corner of the
reference to the overall layout of the corner
the overall layout of the reference point
Television wall reference point video background modeling and color video wall reference point
background shape and color television