,
new balance sneakers
| Back to logs list
Reprinted from 82248637 at 11:42 on December 25, 2010 Reading (loading. ..) Comments (0) Category: Personal Diary
Thank you for using our LED products, LED display is installed the following steps:
1, first cut a good profile splicing, which is assembled display frame. General profile is nothing more than the market square, round, but the assembly method is the same.
2, the outer frame assembly is completed, will be placed in the framework of the cell board (note the framework of the positive and negative, there is a positive side slot), this time the location of installation of the back section is quite accurate, avoid the wrong one instead all the trouble, as shown below:
3, the back end of fixed section,
new balance mens, remove the frame, install the magnet, as shown below:
4,
Reprinted Tips for Driving Test can be passed with, fixed unit board
5, connect the cable, up and down power lines
6,
情长 心伤, fixed the power supply and control card
7, power and cell board wiring, pay attention to the positive and negative,
new new balance shoes, we recommend using SVV2 * 1.0 soft cores, which is a square of double-stranded soft cores
8, the control card and module board cable connection (especially important),
new balance shoes, look carefully before connecting to understand so far,
new balance running shoes, the screen is not fixed to the wall,
值得怀念的一天噢 - Qzone日记, this is the most crucial step,
new balance 574, you can first screen test button to check proper installation