1. Buy materials must be to first calculate the approximate amount. To buy water when the material to do anyway, after thinking about a painting materials by sea chart in the end how many came out, so little trust in a moment the foreman, the result was that buy water 5 meters, the actual use 27 copper head months, actually bought a 40, should the remaining 13, seven short of the actual remaining 6. Under repeated questioning of the foreman back from the other site \Details of their pre-calculated circuit material, the calculated results and after comparing the request of the foreman: wire from 12 meters to 30 meters, cable 13 meters from 20 meters to the other,
团购网, such as insulating tape, plug had great out to be I corrected.
2. If there are old water pipes under the ground, in addition to switch hit, it tends to be damaged, do not hesitate to be the laying of new, do not save, to ensure safety.
3. the bathroom wall that retraction of the glove do not waste space, and posted very good with very nice tile. Of course, that tile union trouble saying \
4. Do not use ceramic tile received positive side of the line angle to 45 degrees splicing bricklayer before grinding pretty, of course, you do not choose Tijuana workers lazy way to do things.
5. aluminum tube when installed must be sealed cement workers in the supervision of the construction standards in accordance to the hot water pipe Reserve space for expansion. In short aluminum tube not closed strong, and loose some of good thing.
6. the bathroom floor if higher than the hall, the transition can be used to solve the door stone.
7. plus the mouth of the sewer pipe, then move the new and old sewer pipes should be checked before the entrance of the old sewer butt is smooth, this time a lot of money to clear the bit to avoid future trouble.
8. Lvkou Ban did not need to buy high-price, very cheap Lvkou Ban has been far better than the effect of PVC, the more money I can not see significantly different results.
9. buy Lvkou Ban particular attention to the keel and not Lvkou Ban itself (Lvkou Ban goal is not easy to tamper too much), the keel often complete ghost.
10. the color of brick is hard to find satisfactory, and I did not find, however, not satisfied with the color of the two sub-cross mosaic is a 45-degree angle to achieve the results I am very satisfied. This is indeed the bricklayer himself put forward good suggestions.
11. under the supervision of the ground water repellent to use is not in accordance with the requirements of my bricklayer but directly poured on the ground, it can even do! It is not the best yourself, do not bother but assured.
12. the bathroom on the ground before the slope paving to consider the good, the slope is not in accordance with national standard to achieve the effect of rapid drainage, and if you use a deodorant or a thin floor drain floor drain will greatly increase the drainage problems. Some people say that steep slope and pretty, I think it is nonsense. Instead larger slope water to quickly run a very clean and is very comfortable thing.
13. Door platinum points with the LG fire board, the effect is good, but might consider if we made the decoration finished door. The door by hand is not refined, for reference only.
14. sink big market brand-name price is not cheap, brand-name quality crazy bad.
15. terrace door fire board is best to use the same type. Balcony environment is harsher.
16. to do when the bathroom basin cabinet vanities first consider the size of a good fit in the future avoid.
17. Glass is very heavy stuff, the best buy in the neighborhood, or first think of a good means of transport.
18. Install lock bolt head should pay attention to some wax, crashing to a December to late. If you do not smoke, then the door handle must be taken to avoid damage to wall.
19. matt paint is high and light is beautiful, do not listen to the painter, and if not brushed matte painter, said that its technology must be bad. Similarly, if a good painter, said polyester polyurethane is not got you
20. insulating tape and Teflon tape in the store to buy another large supermarket was much better quality, and full weight, down conversion price is not expensive.
21. If we will choose the decoration finished putty instead of talcum powder, no big reason is that finished product easy to use putty. Especially after the painter fired when their own experience diy - talc tone putty sick of it.
22. installation and air leakage protection switch junction box of the project can not be provincial, but not on the outside to be on the interior, the original wage will want to save the old junction box outside use, electrical proposals put new ones in the room, and now that he suggested this valuable. On the interior door is not bad, it really easy to use!
23. directly to large decorating company workers on site clearance work may be more appropriate package, and better technology, tools, more \
24. leakage protection and air switch to use the best brands. I used the \Want to buy the real thing is simple, direct call MGE investigation headquarters phone number and called to ask the local branch number.
25. audience delicate pots pots than on stage, good-looking, good cleaning.
26. with the audience to pay attention basin faucet, taking into account the basin edge thickness, leading to the mouth longer.
27. toilet installed in front of the hole is great, large floor drain cover can fall off, if your floor drain has been installed and the toilets are not equipped, they should be careful to drain the lid, or the floor drain cover it up elsewhere in custody also good.
28. buy silicone, then the absolute best all imports of GE, GE followed by Shanghai packaging. Of course, if very important place in the 7,8 element that can also be used, such as aluminum window frames with internal Jiu-level waste to plug the whole silica gel. However, all use the bathroom GE silicone kitchen, value for money!
29. Triangle valve should not be omitted, and save much money, if the words of the triangle valve, triangle valve to be installed in advance of copper joints are not leaking, if not installed, then only the last installed on the faucet to the copper connection to take over when the child was able to check whether the installation of internal leakage, the leakage pressure always some time to test it, and install internal and less safe if the lead.
30. even mentioned the diary has been renovated to do those things,
团购网站大全, their own can do it, do not, but also with the idea, please decoration companies to communicate more with the designer, make more with the workers on the construction team communication, because the realization of your ideas, to rely on them.
31. decoration biggest problem is communication!
32. little place, kitchen cabinet door type designed, BH. L-type should be designed.
33. general decoration, decoration companies, excluding the formal management fees, taxes, materials,
长沙团购网, etc. 75-80%, 20-25% of total wages.
34. in the kitchen to go outside the ground water, that is, from home improvement to a time bomb, who say where Shashi Hou himself in trouble.
35. If separate wear a tube, but in a tank of great? Effects can tolerate
36. ask what between the restaurant and living room separated? package Mentao the most cost-effective, the side is only 6 cm package,
上海团购, or contaminated with white, height 2 m, high protein is not significantly large.
37. strong electric and weak to transfer control,
上海团购网, respectively, to separate the best way, keep the distance of 10 cm or more, but it can be difficult, because most families in order to save costs and to open a slot. Weak audio line can penetrate the same pipe.
38. furniture, paint inside and paste the board can do a good job and opened the door and ventilation doors and windows at home, only to no pungent odor. In fact, you are using a good wood core board, do not deal with furniture inside.
39. cabinet panels and wood can be 15 cm core board, the back of the five available folders, Wuli. Package doors and Tizi use nine per cent. Different materials with different techniques.
40. PPR pipe not only for cold water pipes, but also for hot water pipes, and even clean drinking water pipeline. PPR pipe interface with hot-melt technology, are completely integrated into the tubes together, so once installed suppression test, no leakage. PPR pipe and will not scale. PPR pipe scale never known, never rust, never leakage, green high water material.
41. lacquer plate well, the advantages of both wood and composite.
42. not to print a long time on the wet artificial stone, unless you want to dry a printing surface; they should not be wet cutting board on the table a long, wet wood, sometimes faded; rub the stain with a steel ball, like the hand squeeze pimples.
43. gas meter can be used in an ordinary cabinet door closed it? Need to use the shutter-type door it? Check regularly open air on the line.
44. Qing contracting the tx Please note, we must verify the renovation team give you a list of materials. Their estimates may be me, I too believe that they, and the results of wires and line to buy is almost doubled.
45. ware size must be planned, the best sketch in advance, calculate the size.
46. Buy finished the students pay attention to the door, if you want to pursue results support the panel with the business package Door, then you may have to be Henzai knife it!
47. Re: installation of water pipes are put before the leader and basin, sink have bought?
No, just make sure where is the basin faucet, bathtub faucet, washing machine what's on the line leading, 99% of the leading and falling into the water are in line with international norms, as long as workers are not careless, all right. If you own basin cabinet, basin bought in advance, or optimistic about the size. In front of the sink to determine the amount of good size units, installed in front of buy Haojiu Hang Taiwan, do not forget that the audience or on stage. Distance between hot and cold water pipes with cement tiles must be accurate before the closure of 15 cm, and must be parallel. If you have bought, it is best put something, such as sealed after the unload.
48. If you use an 8-core cable at the same time take the phone and network, will not interfere with each other it? Not .1,2,3,6 hit cable module, 4,5 hit the phone module, and the other two easily. My experience was right: 10M by 1236 100M in fact used to have 10 / 100M run rate we will not feel any different. If a 8pin line, then the signal will cause some program-controlled switches on the network signal interference in the home environment generally will not have any problem. But rest assured that I can recommend such a route will leave separately to the margin, the network cable is very cheap that you say?
49. be sure to check the distribution box installed properly.
50. mounted bath taps and shower faucet lessons connected to the pipe is embedded in the wall, I have repeatedly told them to size to get accurate,
北京团购网, not to pretend not on time. The results left a hot and cold water is 15 cm spacing, can be hot and cold water pipes are not parallel, the result took a plumber just put on the force feeding. Yesterday discovered that my fb leading high-temperature coating device actually does get cracked. If we can first load leading to the first installed it. Leader should be bought first, then install hot and cold water pipes, tiling it.