,
tory burch 2011
| Back to logs list
Reprinted from alumni of the user at 14:42 on December 5, 2010 Reading (loading. ..) Comments (0) Categories: Transshipment
one wall
1, check whether there is cracking the wall.
2, check whether there is hollowing the wall, with a wooden hammer or other things knock the wall, knocked to the hollowing of the sound is not real, it is easy to hear it. Cook mark, decoration, filled with putty.
3, Check wall putty, if it is waterproof putty, you can take bottles of mineral water, splashing the wall, hands to touch, to see whether there is mud on hand, there is no proof of the wall, then passing water putty.
Second, the roof
1, check whether the roof cracking.
2, check the roof and wall moldings are the yin and yang is the horizontal line, if not, the first renovation in the future to find the low wall plaster with water putty and then leveling can be.
Third, ground
1, check whether the formation
ground ;
2, check for cracking and anti-sand: rub the ground floor with their feet if there is sand. Than or inferior quality of cement mortar, stirring this issue will appear uneven.
Omo checked, they begin to check the details. Construction of each house different units, quality and design are different, professional supervision in these areas to play a very significant role.
Oh
very important details, a lot of things that we do not see, or post-decoration of furniture will have problems.
four windows and doors
1, checking windows and doors of the strength of
2, checks the window function:
a. smooth sliding windows and doors,
tory burch reva, the surface smooth and clean, no serious scratches, no cracks or broken sections phenomenon.
b. Hardware: complete, correct position and firmly.
c. sealing quality: doors and windows closed and the box fan, fan and fan no obvious gap,
tory burch on sale, seal is not loose, not falling, not exposed.
d. door frames, fan vertical bend.
e. glass, no pollution, no damage, no dust and water sandwich Shuangbo gas divider evenly.
f. whether the drainage holes opened up the window. Water will flow profiles did not get through in the.
V. Circuit
1, check whether the socket and switch on reasonable setting, the circuit in the decoration of the need for reform, one look at the needs of individuals, the second is to look at houses in the socket and switch settings are reasonable ease of use.
2, check each light switch and power outlet can be a normal use, with a cell phone cradle, or can test electric plug electric pen. Whether the power outlet, of course, professionals will use a dedicated outlet check.
six, water
water is mainly reflected the kitchen, the bathroom. Bathroom in the general situation is that two to leak, the plumbing of a Toilet, a bath under the water pipes, water pipes under a wash basin to see whether it is reasonable to set, and then decorated according to their own needs to decide whether to change, but the specific transformation The program will listen to opinions of experts.
the most problems is that many people want to change the plumbing for toilets, have been more space, but the transformation in the downstairs toilet to be under the top of the pipe line road transform into the water as to cause a lot of trouble, in order to prevent future problems Downstairs owners agreed to do so is difficult to change, so do not recommend their altered (the practice of using booster ground prone to poor drainage), to listen to professional advice.
seven, gas pipeline
gas meter space is a very little thing, how to adjust the position of the table but also to listen to the advice of professionals, must be modified by the gas company, is very important.
eight,
tory burch boots, and examination of water
waterproof mentioned here, refers to the kitchen for water. Of course, the delivery of the house, some do not do water has been declared in advance, which requires renovation to do. If the delivery has been done in the water, then we have to verify the water is well made. If you do not try it before the renovation, then again when you find a good fitting leaking or something, then the maintenance works on the larger. You have to dismantle a new ground has been renovated to do a new layer of waterproof layer.
acceptance of waterproof is this: with cement mortar to make a threshold Duzhe closet door guard, and then let's use a plastic bag covered with sewage / outlet, coupled with a real bundle, and then Wei toilet drain, and the light on the line (greater than 2cm). Downstairs of the property and then made an appointment within 24 hours after the owners to view their home health smallpox toilet leaks.
IX test tube
pipeline in this context, refers to the drainage / sewage pipes. I still like it is the balcony outlet that acceptance, to take a water storage equipment in advance, and then pouring water into the drain. See if water is not smoothly flow out.
Why should acceptance of this, because the construction of the project, some cleaning workers tend to Slag cement poured some drain flow away, if the cement sticky, they would be blocked at the elbow, causing drainage problems.
In another case, but not closed with the acceptance. That is to see whether there is water Sewer odor elbow. According to experience, if the outfall is not water deodorant elbow, then the overall housing quality would have to fight the spirit of the twelfth.
Why outfall need this elbow,
tory burch flats, because elbow will be filled with water, so the smell from the smell of the lower pipe will be blocked in this layer. Without the words elbow, laundry and toilet will drain off a smell. There may be developers will think that using odor and leakage on the line, the project proved to drain odor can not meet the actual needs. And precisely because such a small place, most often reflects the quality of construction contractors.
reminded: General bathtub drain has returned to the lower part of the water bending, while the other positions are not required to install odor floor drain! ! !
Tip: equipotential protection devices, mainly for the kitchen and the bathroom more humid environment such leakage protection. Such as the metal frame has a stainless steel wash basin below the lower water pipe,
tory burch shoes, with a line, (line requires not less than 4 square feet) connected with stainless steel after receiving the box and brought out to prevent the leakage of moisture, protective effect. In the senior years are mandated decoration, home improvement almost everyone did not notice this, and then the bottom has a cast iron bathtub such as nuts, but also for the wiring here, so do not seal the box and other potential.
; inspector gadget need to bring
1 只 plastic wash basin - for acceptance into the water pipe (water must be great)
1 only a small hammer - for acceptance of a house wall and the ground is hollowing
1 只 feeler - used to measure the crack width
1 只 5 m tape - clear height used to measure the house (mainly used when 收房)
1 只 --- multimeter for testing the various strong and weak electrical socket type is smooth
---
1 只 calculator used to calculate the data
1 只 pen - for signature
1 broom - used to clean the interior of Health
1 only a small stool and some newspapers, plastic tape, packing rope - for a long time, can take a break and closed drains in advance.
normal time is generally continued acceptance of the house 2-3 hours.