my collection of electrical installation symbols method
one wire threading pipe generally have:
PVC pipe: PC20,
welded steel pipe: SC20,
withhold galvanized thin wall conduit: KBG20,
tory burch outlet,
thin wire fastening galvanized pipe: JDG20,
Second, commonly used in electrical design and construction plans of laying lines:
SR: steel trunking laid along
BE: Cross-roof along the roof or laying
CLE: laying along the column or across columns
WE: laying along the wall
CE: along the ceiling surface or ceiling surface installation
ACE: the ceiling can be laid into the man
BC: Dark laid in the beam
CLC: Dark laid in the column
WC: dark laying in the wall
CC: laying the roof in the dark
ACC: Dark laid in the roof can not enter the
FC: laying on the ground in the dark
SCE: the ceiling installation, wear a metal pipe
one wire through tubes that
SC-welded steel pipe
MT-wire tube
PC-PVC Plastic Pipe
FPC-flame retardant Plastic Pipe
CT-bridge
MR-metal trough
M-cable
CP-metal hose
PR-plastic trunking
RC-galvanized steel pipe
Second, the way that wire laying
DB-buried
TC-cable channel
BC-Concealed in the beam
CLC-Concealed in the column
WC-Concealed in the walls
CE-along Tin Ceiling installation
CC-Ceiling Concealed within the day
SCE-the ceiling laid
F-floor and floor under the
SR-along cable
BE-along the roof trusses, beams
WE-along the wall for surface
three, lighting installation of the said
CS-chain hanging
DS-hanger
W-wall mount
C-Ceiling
R-embedded
S-Bracket
CL-column
along the steel trough: SR
roof along the roof or cross
: BE
along the column or across columns: CLE
through the laying of welded steel pipe: SC
wear a wire and pipe laying
: MT
to wear hard plastic pipe laying: PC
wear flame-retardant semi-rigid PVC pipe laying: FPC
cable tray installation: CT
metal trunking installation: MR
plastic trunking installation: PR
with cable laying: M
corrugated PVC conduit through laying: KPC
wear metal hose laying: CP
direct burial: DB
laying cable channel: TC
wire laying parts of the label
along or cross-beam (roof) installation: AB
Concealed within the beam
: BC
laid along or across columns: AC
dark laying in the column: CLC
laid along the wall: WS
laying in the dark wall: WC
along the ceiling or roof surface
laying: CE
dark or roof laid in the roof within: CC
the ceiling laid: SCE
laid under the floor or ground
: FC