1, the partition will not be the first shoe, leaving a little space so that the shoes can leak into the bottom ash, sink and gas furnace altitude mounted lights. Given the location of the bathroom floor drain must first think well, a good quantity of size. To drain the best side in the brick, if the bricks in the medium of it, no matter how kind of tilted blocks, floor drain will not be the lowest point.
2, bathroom, air conditioning, no outlet design switches. Especially the bathroom water heater to a pair of level switch with a plug fitting. To off to electric, pull the plug risky
3, on the brick part of the treatment of sun angle, the final thinking is to look at the workers level. If the level of good workers, plasterers, and better tools for grinding ceramic tile, they should not hesitate to choose the train of grinding a 45 degree angle. In effect, at all times a good grinding, grinding angle of 45 degrees in the positive approach is the most beautiful! If the level of the workers do much, then you still choose to be positive angle, because the bad grinding angle of 45 degrees angle of approach is not as yang effect of story.
4, line up the pipes after the water pressure test is also very important. Test, we must be present, and the test for at least 30 minutes or more, conditions allow, preferably an hour. 10 kg of pressure, without any decrement before the final test.
5, when the steel doors steel door must be considered a good size wall frame protruding inform the installer, making the final frame and affixed to the wall tiles are flat finish, so not only beautiful, and good health to do.
6, carpenters and masons of the archive Door tiling is to tie in, including door pocket of the time, to consider the following ground (the ground side of the door both side) is also affixed to ceramic tiles or other cement mortar thing, because if you stick tiles Mentao well before the fix has been pack to the ground, with cement when the future, if the cement and Door dyed, moldy water will reason wood Door
7, under the mattress and the bed board must be breathable. Bed board is best for general use cedar board
8, do the paint as much as periodical tape
9, buy a lamp to note: General tried to use glass, stainless steel, copper or wood (shelf), and generally do not buy any other coatings plated steel above, ah, ah nought like paint, easy to fade.
10, washbasin as ceramic pots, glass pots downright Health
11, water and electricity to its own transformation plan, and ask them to open Cao straight line. Watching them draw their own line, the whole line open by painting Cao. Each have their own acceptance Caixing.
12,
Lacoste Canvas Trainers, water must be good, be sure to test the water!
13, many of the construction of a verbal accord into the gap checkout massacred, must be written in black and white, a change in the project are sure to ask what the price, write it!
14, ground floor, if installed, to re-do all the ground re-smooth layer of cement.
15, the kitchen door, or to make a wooden decoration hanging rail wood doors for good.
16, the living room as much as possible to install the power plug.
17, is still to be done outside the bathroom shower section. A shower curtain can not pull the easy way bad, real inconvenient, water everywhere.
18, do door and frame materials to prefer fine grained materials.
19, before installing the cabinets must be sure your family water is OKAY.
20, kitchen floor tiles will not elect white.
21, ceiling, pay special attention to smooth putty before wiping Dulux
22, the number of living room lighting should not be too light, simple is better, or favor the lighting shop!
23, to buy things that need to be installed as the installation requirements of peddlers, it does not embody installation, it must adhere to only pay the full paragraph after the installation! !
24, the renovation period, before you gather from affair card manufacturers carry
25, Lvkou Ban the protective membrane is best removed before installation.
26, shoe is best to use shutter gates, deodorant. Edges can quit a boot outlet, to plug drying shoes.
27, cutting and a small safe place to light.
28, it is handy canteen exhaust flare can too be secure, so while you eat peppery kettle or do not nasty grill houses the Office of the ceiling.
29, the door is best to lay a place debris in the cabinet, can be placed on top of shoe. The mutual things, such as umbrellas, bags, scissors, change, eat the medicine, and so on there, so it is convenient.
30, there is no need to use your ceiling, if it were not for too anxious about moisture and cooking fumes, moisture-proof gypsum scrubbing brush is suggested to use waterproof paint, my health to do a visitor, very beautiful. If you must use Lvkou Ban smallpox, it is recommended:
1, not too expensive.
2, using the web color, especially in the kitchen ceiling, white on the good, the color white unless and decoration style match, it will easily incongruous.
3, download their own ideas, do not believe selling the vision of smallpox, their vision was warmhearted taint.
4, staring at himself in the scene, closing side is very important, do not let them slack, or leave a black sew, how to look how ugly.
31, the third day and continued to stick largely perforated tiles, scope hood, and water heaters to pre vent arrange, and if so then perforated tiles stick better, not easier. Therefore, before the upkeep must be selected in the range hoods, stoves and water heaters, to resolve the size of punch.
32, though taking into account the custom-made cabinets look good, but not durable, comprehensive views of some of my classmates online and experience, to counter the framework of using cement to do, inside and outside the sides stick tiles, marble countertop shop, wall cabinet and cabinet wood door or chosen to do. Out of the cabinet to do so durable, moisture-proof. And spent another few. Read a good many of his neighbors say, I did not blow.
33, well after the door pocket, plasterers plaster line to start the installation, wall Pihui works. Comparison of the wall of my house was originally fashioned, approved 2-3 road on it. Pihui acknowledged when a gray slick once, and then brush the primer, sanding again, after brushing, and finally twice with ICI paint brush, the entire wall looks smooth and flat, really good. Upon completion of the ceiling wall, a carpenter started wardrobe. Albert wardrobe is 18cm's authorize Daixinban do paste veneer outside, although there is no furniture store to buy so good-looking, but durable, quality should be better than to buy. I'm not terrified of standing vessel board. I am afraid that is not enough to buy. Backplane is relatively thick, buying is thin.
34, other students in the tiling must pay attention to the following points:
① best he can in the scene.
② some less than absolute tile can attached in the future some laborers do not see the location, such as cabinets, sinks, mirrors behind, but also pay attention to tile, brick, etc. Do not waist is more than the employees additional to the situation, otherwise You can not see anything in the future, but also wasting money.
③ wall tiles, floor tiles in the paste before the overflow mar must be enough time.
④ sure to floor drain plug with something good out of cement down to prevent clogging. My family just because off the cement floor drain is blocked, and spent 30 looking for the management bureau to clear, get up a lot of small mud.
⑤ human at the scene, the workers will not be too wasted tiles. Tiling my family when not at the scene, then work, wasted a lot of bricks, it is the heartache, all the blood and sweat Mimi Yeah.
35, a wall of long, high. Such as a bathroom with four walls, each wall should measure out of its long, high. And then subtract one of the windows and doors of the area. Finally, a numerical ground area. After the size of the amount you can also get a sub shop selling tiles, they will help you re-match. Loss of 5 percent-plus on the line.
36, the best is a two bedroom roof light control, and a door, a bed, lying on the bed save the winter and then it turn off the light.
37, the socket must be considered a good location, height, interval. Even first met playing steel cassette position, the latter is found to just be put away the magazine TV cabinet, microwave ovens, desks block, had to move the location of the first two high furniture, and finally found not only ergonomic height, but also can not buy a good fit stainless steel cabinet legs, can only be made of aluminum foot.
38, just around the corner in the hallway of the tube with a good, sunny and have that effect.
39, did not take into account when loading the table lamp placement, it lights not in the middle of the table.
40, bathroom tiles do not use too much pigment, one lightly dirty, and second, a long time, too blunt!
41, outlet to more equipment, furniture to buy outside the ground to filth security to consider, like to see more housing, in principle, should cling to.
42, Lvkou Ban did not need to buy high-price, very cheap Lvkou Ban has been far better than the effect of PVC, the more money I can not see significantly different results. Buy Lvkou Ban particular attention to the keel and not Lvkou Ban itself (Lvkou Ban goal is not easy to tamper too much), the keel often complete ghost.
43, the color of brick is hard to find satisfactory, and I did not find, whatever, not satisfied with the color of the 2 sub-cross mosaic is a 45-degree angle to fulfill the results I am very satisfied. This is naturally the bricklayer himself put ahead good suggestions.
44, on the balcony on the top cupboard, then hit the back of the cabinet with a layer of waterproof insulation foam board works well. Balcony door is best to use the same type of fire board. Balcony environment is harsher.
45, if no appropriate molding may hope to custom, custom quality seems better than the sample also. More personalized and customized.
46, bathroom cabinets with stainless iron legs are huge profits to find some regional stores to buy back cost of crazy cheap.
47, install the lock bolt head should pay attention to some wax, crashing to a December to late. If you do not smoke, then the door handle must be taken to avoid damage to wall.
48, Paco the floor well, I like to caution that the only directly to the boss about the price and the seller speak about than the price better.
49, matte painting is beautiful than the high light
50, if the re-decoration will use putty instead of talc productions.
51, installation and air leakage protection switch coalition box of the project can not be provincial, but not on the outside to be on the interior, the original wage will want to save the age junction box outside use, electrical propositions put new ones in the room, and as long ashe suggested this expensive.
52, and wind leakage conservation switch to use the best brands. I used the Want to buy the real thing is simple, direct call MGE inquiry headquarters call number and called to ask the local branch number.
53, the audience delicate pots pots than on stage, good-looking, good cleaning. Basin mixer with the audience to pay attention, taking into account the basin edge thickness, leading to longer mouth.
54, without anyone revision of the wall angle is also very beautiful, but to advance the stage of looking for the painter and the painter apparently put forward. angle Ding Jiaoxian do help to play the straight line.
55, online slots before the cement surface, surface treatment accepted putty is very important, for no solid surface with a clean pellet handling is very appropriate.
56, make plaster suitable for a large hole on the wall, of course, if the hole is too big or need to use cement.
57, frosted glass on the back do not coated with paint to defend the hard to clean!
58, Caipen leader can be sure to switch back of the hand, that must be not easy to keep clean fingers, hand turn up when the oil is also tough.
59, the price of luxury auto racks too many water, and found a number of relatively unknown brand in the structural design on the front line rather than the brand, the price is much lower.
60, could be considered safe on the ground of the metal socket, this socket 100 is very expensive, but very convenient, commonly flush with the ground, the foot can plug a foot to popup up. Suitable for large living room. Or on a dining room table, below, is used to insert hot pot (to prevent hanging back and ahead when moving wires)
61, storage room. TX has been said, but I did not do doors, looks very beautiful and easy to put dirty clothes in the cupboard.
62, starting mattress skeleton (which is so phoned up.) I am a professional corporation to buy the cloth-bed bed, and spent 350 yuan joined such a object, end of the bed there is a pull handle, the bed board will be rotated up, exposing the base of the warehouse space, what a excellent Oh!
63, is not practical twice bar towel rack! Like the present and uses a unattached rod, hanging rod found membrane will not look forside and then drying towels
64, inside the cabinet that the trash is not enough practical, than on the outside. There do not install the door panel of the litter binary and table, open the door when the summer will be very smelly. Trash or on the outside good.
65, the table afterward to the small cabinet, and can be placed on some stuff, very convenient.
66, to I think the mop bucket less claiming in terms of extravaganza, 1 can convene themselves out of covered and the circling context that is consistent with tile or mosaic exterior, and money.
67, the bathroom can point nail nail to hang something in the hook.
68, designed a bathroom cupboard put clothes, no longer have to anxiety about bathing forgot to clean clothes.
69, washing machines with drying is not solemn and practical, in addition to one year, only the yellow mold-day, and the evil mammoth. Thick clothes, towels or drying quit, let the sun consumer disinfection to be good. Even amplified, you need to save the point of silver.
70, even in the laundry room to do a laundry bucket, used to hand wash something. Originally thought to use less, so buy a very cheap Terri leader. Did not think this is really convenient laundry tub, became my most frequently used a washing area. What rag ah, ah socks, and towels, ah, all washed in it, and even most hands there too.
71, fitted with lights really not practical, the decoration done up to now not opened. There are just SHOW guests to look at lighting, I simply forgot their own also installed a this thing. When the original is to open PARTY under mythological, and now do not have much chance of prologue spot.
72, the biggest course learned is that in truth the simpler the better fitting, fewer pollution, less money, truce of mind.
73, useful stuff:
① designed storage room.
② North Terrace sink used to wash the dirt. Differences between the washbasin and toilet and washing vegetables for the kitchen sink.
③ bathroom can be pulled out of the leading shampoo. (TX shampoo basin was not an exception.)
④ easy to wash the floors and the appropriate cleaning tools.
⑤ work lights the kitchen table.
74, buy a toilet must be a good amount of their own pitch, or go buy a return that is really ... ...
75, Bath and Kitchen floor tiles stick better after a good amount of what the former did not do the level of the lowest point is not looking at the floor drain, or other teams did and decoration after passing, a lot of dead compartments.
76, skylight beads Angeles with the Great Wall of stone tiles is a 800X800. Manufacturers cut and edging, Mason posted. Pattern did not look good also
radiation.
77, bathroom shower room must be large ample size, and use perspicuous glass, shower in it will not seem so cramped.
78, should not use white cement tiles pointing anchor. Did not chance a dark month breach, hideous necrosis. The results they have bought their own anchor pointing surrogate, that weary
79, the cabinet should be pad below the pretended stone after the board,
Lacoste Casual Trainers, with the result that there is no installation, it can not cut the flesh in the above, promised to give me nearly two months have not installed installed (only to polished once).
80, do not muddle the letter designer. Of course, you can visit several decoration companies and more, from the design in each extract something really profitable, the key is what you want to primp like home improvement.
81, if the floor drain has been installed by the incipient developers that hinder foul of the
82, bathroom tiles affixed to the ground after a good test the water, if water is relatively slow to rework immediately. Our household's water is relatively slow, then relented a bit, it was forever a little bath water, and made hundreds of our main Guardian have lazy money in the shower head, and prodigy how the total now relief.
83, fitted wash basin and mirror to be considered good, put brush cup shelf, towel rack comparative position.
84, bought the mirror to consider the position of mirror front lamps, and if do not want to install a temporary mirror front lamps, mirrors the size of the cover for the mirror to be able to set alongside the line of the best light.
85, put washing on the balcony to be a small cabinet, easy to put some debris, such as washing powder within the debris. Both beautiful and practical
86, must be staring at the upstairs upstairs to do down the dripping water .... otherwise, get the wall cabinet, the wall is a muff ....
87, do not blindly emulate the online buy, I later found that some themselves to buy cheaper than the bargain.
88, television backdrop will set up a few more outlets, TV, DVD .... a put, you will find enough outlets.
89, change the water well in the future to be considered before loading in the wash basin in the majority specimen, for example, the left or right pots pots, water and drainage that is located in what location. Otherwise, changing for the better after the breakthrough phase of the wash basin was not fit!
90, on the curtains, we had better put your stay a size goes, the foreman can not be less that size. If less, then, how how the. Or saw him cut his napkin.
91, the decoration of the construction process:
(1) approach, breaking down a wall.
(2) bathroom, kitchen floor to do 24 hours off water tests (necessary the developer to complete this mission.)
(3) cutting trough, water, electricity transformation and acceptance.
(4) sealed underground water secret trough renovation project without closing the water leakage test started waterproofing.
(5) bathroom, kitchens wall disk.
(6) Carpentry approach, suspended ceilings, plaster moldings.
(7) packages Door, window cover. Making wooden cabinet frame.
(8) concurrent production of wooden doors, plastic doors and even pressure.
(9) wooden panel paint brush dust (food vegetable oil).
(10) leveling the table laying marble windowsill.
(11) wood trim plate, pasted, nice line creation and installation.
(12) wall basic treatment, grinding, leveling.
(13) belongings, the door seams paste stickers (protected side).
(14) ICI fuel for by fewest three times the wall.
(15) furniture painting reach, eye patch and paint.
(16) dealing with corners, laying floor tiles, wood or composite wood flooring, waterproof cruel bar, skirting.
(17) lighting, sanitary ware, handle, door bolt installation.
(18) clean up, floor tiles make up joints, dismantling.
(19) decoration preparatory acceptance within the company.
(20) three formal acceptance of date, distribution owners.
92, flue gas valve back together, be sure to clean and ensure the valve can switch freely and to able to open to the maximum, otherwise it will affect the effect of smoke hood. To remain in the installation of two ceiling is not installed, so hood and try and correct installation of the ceiling and then installed.
93, so much in the living room and dining room ceiling can not do not do it.
94, good air conditioning in order to take the line position, the power closer to the air conditioning as much as possible, so install air conditioning power rope to see chapter of it, leaving a trace of regret.
95, to personally measure and record all the available house sizes, size map will be covered 楼书 elements and then re-wire tagging, the ultimate size will directly affect the interior design and furniture purchases.
96, line a bad choice if small size of the black walnut is always enough air, then need to have choice, or to accommodate actual or attached their own ideas, of course, be both the best
97, began looking for decorators. To personal experience is cared, if necessary especially large size and intended to simple decoration, it seems more cost-effective to find some of the guerrillas. After installation it is best to introduce people, you have read and accede to the eyes, primarily the feeling of the human in charge of the decoration is more important, liability and gratitude of how, some of the sometime is more critical, because if it were not for a stripped-down, in fact, those who live almost on the outside will do mingle, but the quality is good or bad may depend on a sense of responsibility.
98, the cardinal furniture such as sofas, wardrobes, dining tables, chairs, cabinets, etc. had better take a look in advance, if the running around on the tired, you can find a few good large-scale home shopping plaza shopping, the basic trend to see it, so the next thing you do is based on their desired style percolate out the right things slowly. Some people take good style, meantime others clutch of color standards, it does not matter, anyway, there is time to consider, if you wait until clearance decoration, furniture, help wanted steps to go in the final will reluctantly adopt the inevitable and not very much.
99, has been bullish on the furniture is best to size down, and then to exhibit the future situation of the virtual room.
100, the necessary documents to buy someone good must be preserved, a push that may exist on the post-retirement, a replacement will definitely behalf. In particular, some important items of the store receipts, pamphlets, etc., because a lot of things have a insurance duration, the certify lost would be more trouble.
101, during the construction projects are sure to addition or reduce the price they asked for and then jot it in black and white.
102, check whether the construction is necessary protective measures, such as entry doors to use jewelry cotton wrap, a good window and floor tiling also appropriate protection.
103, as much as possible to communicate with construction workers, to determine whether he understands your purposes. Put ourselves in each esteem the work of the master, respect him, and people feel the importance of family, and began to live to whether it is more responsible fknow next to nothing ofme of it? Saying goes, is not called (But if you face a treacherous cunning bully, who, it would must retaliate, debate) of special note to some marginal projects is the need for co-ordination of several trades, the workers will be responsible to each other and coordinate their respective duties, Otherwise, we pass the money back and forth, all pass the buck. Like my mason to help me solve some carpentry thing, and electrical and decided some masonry problems. Because each teacher's experience is different, by the time he is willing to help you find a way.
104, do not do the best furniture firm, because it no longer may be some changes in the layout. If we do have to grasp the quality, or endless trouble.
105, be sure to change the water carefully, one dictate of money; Secondly, if you do not need from the floor to the ceiling laid down water pipes, water pipes in case of a problem to big trouble.
106, according to their actual needs reasonable preparations wiring, so as not to waste (especially the cloth with a lot of lights and lighting if it were not for practical, we must also attempt to avoid tandem use, waste electricity), but some places can not be Province, for instance, next to the bathroom mirror, hairdryer and shaver to often; well inside or below if the shoe has a socket is good, can singe shoe device, I now regret not very this wire cloth.
107, the bathroom as wet and dry place, if area is small with a pedestal like (special glass basin was dirty, lazy with admonition); conditionally set a waterproof cabinet incorporating small debris is best, put everything certainly does not look good on the outside.
108, wood glossy white paint brush when the polyester better than the Nitro (which is to listen to experienced painters speak.)
109, the cabinet must be carefully chosen, compared to more than a few quality, we go to do a solid tight, because this one is easily thousands of ocean, and related to the stove and sink and so on, so it is still not to indulge in corrupt cheap good. But best not to do in the cabinet table or inside the trash; there is, if funds are restricted, basket, basket seasoning, rice bucket of what you can do all of these components in the cabinets sell the company in general is very expensive.
110, wardrobe prefer more not less, rather huge not small, the women remember! Dangling from the longest space to be capable to dress down.
111, such as glass or mirrors not handling things the best buy in the neighborhood, or first think of a good means of transport.
112, curtains, furniture, family appliances in the whole approach is best and then made to match the overall style tone. However, before cleaning can trail installed.
113, gas change management best tiling complete, or there may be damage to the wall. Best to let the gas company to paint a chart or on the wall as a symbol of the company to be required because of the cabinet body openings in the cabinet.
114, cabinet installatiin due time is longer, anywhere from 4 to 5 hours, or more than 2 days, must be psychologically ready. Installation can check whether the material is used in the kind of set you (the hinge hole can be seen via the cabinet material). Before installing the kitchen cabinets before cleaning it, because once the installed cabinets, no way those dead ends and then cleaning up.
115, furniture installation is best looked at in the next, especially as the wardrobe of the laminates are several holes on the choice, I was not looking at the results of the small distance between the laminates, hang dress stretch not open, even after the adjustment.
116, catching into account the formaldehyde pollution of the environment, such as spider plants can be placed in the green room, furniture doors open all the eruption of scent, but also to buy something special spray to eradicate odors.
117, installation of combustible gas, reservation gas ignition.
118, Brush Wood of the time: the best Puwan other rooms painted tiles or wood flooring. If you must brush, the best must clean the room. No floor tile or wood floor room, the room a lot of dust, then brush Wood, then brush off the dust easily attached to the surface of wood products Wood, feels a tingling feeling, although this can be higher label and then brush again sanding solution, but in the end it feels to feel the brush and the overall effect will be a deduction RBI. Puwan brick room after the brush, when the dust content in the air before the shop a lot less than the basic Wood does not arise again after the dust brush attachment on the surface of the wood products. All that being said, because a small renovation to hit the Wu family situation, I had decided to buy in Canada Wood hi seen it before the effect of brush, and feel very smooth, feels like my home-improvement Howley, like wooden doors. Only because of the above, the results of effects to play a lot of discounts, it has been labeled Wu regret things. And I buy in the union hi the process of addition paint, some students appeared in this family. So to remind students to take note of here. Wood I do not know whether the other case, but according to the principle of same reason, so here to remind students to pay attention to it.
119, on the fill paint: painting pedagogue pay is waiting another batch of finished dry wall putty, putty is dry paint. After brushing paint loaded if no reason is necessary to switch the lamps and various electrical appliances. Ask somebody to install lighting and electrical switches to remind the teachers to pay attention to this and a clean install Sin before hand, so that when installed will not be a dirty wall. Will save a touch-up painting processes the. Of course, smeared the walls, the decoration is to determine the paint division teams to pay up painting again, that is, the walls will get dirty clean (if it is paint companies, they also allow teachers to pay to make paint, If you pay attention to what a lot of paint division will be left in the part after brushing the wall paint, which is the remaining part of the paint used to make paint.) Just note, do not let install lighting division to pay soiled walls, paint can make teachers pay less for a voyage (or at least half a day), but also facilitate a lot of our own,
Lacoste Radiate Croc Trainers, and why not? Sometimes, with people easily, also has been easy. In general, a house painter will paint before brushing the Wood, Wood to do so is to avoid the process of dry brush would paint the walls of the wall impact. Of course, in actual operation, you can also Puwan after tiles (floor tile wall of the putty has been approved before the good) painted Wood, Wood, etc. after whitewashing paint dry, but to do so, of course, will affect the duration. If the panic of affecting the period of the case, but also the impact of the air to reduce dust, then point to a lot of sedulous to clean the room, the health of the.
120, decoration team choice: As the first company selected the guerrillas or the regular, I think is not important, the key is to give you the head of the construction team is responsible, the technical renovation of the workers, of course, the quality of the decoration and prices.
First, find the decoration companies not more than four, a crowd ofis this, if your time is very rich, it is another matter. And decoration companies to talk about this before, must be explicit that you have to do renovation projects, you can call the company reported that all the decoration items, compare prices and comprehensive after taking into account the manifold factors and judge what the next items you want to outsource , which items to decorate the company to do.
the decoration of the people, the decoration of the offer as low as possible, of course, opposed to the views of decoration company. Sometimes the decoration company to La Shengyi, will attempt some of the weight of relatively low, this way, the project quality and the quality of materials is more difficult to assure. Renovation so many, you want to term items are the lowest, it is unrealistic. And the renovation of the attempt, you can not just look at numbers, which also depends on the content of the materials used in this project, descriptions, brands and so on. You know, the decoration of each of the quotes are actually quite an masterpiece to.
121, the construction? As I am not eager to stay, it plans to look in casual workers: your neighbors a good home builders are threaten to become the thing of my looking for: a mason, a carpenter, a plumber, a painter. Designed to do step by tread step by step, I believe, working slowly and accidentally.
122, to use every cent wisely: look at the decoration materials, he must be looking tired, there are so many good things, it seems, like every single look, and economically able to resist . A short period of time to make all these things can be purchased in place, the economy pressure is so big. Most people at this time is often in muss, the results of the last one too much over budget, the second is the U.S. price of the first things to buy high quality, then buy something is mixed.
My view is:
one pre-determined price, after the voting materials.
excess of the expected price of 10 percent-of material merchandise, do not waste time. Business is always fine too purchasers. I am act a detailed schedule of materials needed in the future will be posted in the post for your reference.
Second, you could save aboard the province, the bloom to bloom.
the most expensive place is carpentry, kitchen cabinets.
most disposed to water quality problems is the transformation of the place, kitchen and restroom water.
123, the price of furniture than to buy some furniture. 500-700 yuan per square meter of ordinary furniture.
124, covert project was not to save money the maximum important place: the circuit transformation of water, water treatment.
approach is to ask B & Q to do, B & Q now have individual decoration services: such as water reform, since the purchase of materials, water per meter 40 yuan, 20 yuan per measure circuit, with six months warranty. Details of B & Q on the first floor in the eastern of the individual services and pricing announced, we do reference
125, the most hassle free way is to use online resources, the accumulation, retention, arranging integration, will certainly be useful when.
126, in order to save time, improve efficiency, each has a acquire on the decoration materials market, a detailed and practical procurement timetable and allowance is very important.
account by room species acquisition blueprint is easier to implement: each took to the streets to see things the same room, to facilitate comparison and comprehensive
attach, probable to have success.
one hall project
Second, the alive chamber works
3, 4 restaurants engineering
, main bedroom project
five or six kid
housing projects, study projects
VII, the main Health Project
eight, nine passenger
Health Project, the kitchen works
ten, eleven
balcony engineering, engineering
Yin Taiwan is now put my own plans like the table set out in the following post, for reference: file in the table as one example. This list is used as a procurement plan
more convenient, the corresponding project before construction can be re-classified according to types of combination, into masonry, carpentry, electricity, water, paint and other re-tabulation. The right side of the table can also add If (emulsion paint three batches of three brush; shoe panel by Albert, brush polyurethane varnish) and so on.
127, home theater rear spokesmen, the sound cables to be embedded in the living room underneath, this is very important!
128, add a sink on the balcony, decorated to embedded pipes. Balcony sink is very essential, gardening,
Lacoste Finham SPM Trainers, bathing hands.
129, toilet, kitchen need background music, audio and audio wires embedded before the renovation.
130, either sides must stay on the balcony outlet, Chinese New Year lantern, good power.
1: the bathroom is divided into 2 areas of wet and dry on the wet area floor drain better
2: If you are burning natural gas water heater attention to the bathroom to have ample ventilation to set
3 - 4: If you do not know if friends can inquire a professional chef, accompanied by the immediately more than a lie.
11: hydropower is still seeing for professionals to assist themselves for the features in this context also accuse the devise of their own lives who need to be became in the transformation of migration, merely if there are problems when the house until you have installed the
line problems and have to re-do the wall torn down was a very big head thing.
12: waterproof bathroom of their alternative should depend on the bathroom floor tile floor tile professionals are there to do this in the purchase of water treatment can recess assured that when you do bad, but because the waterproof design problems in the choice of size If you meet after the designers got the mind that he would not cut off the bricks to fill the ground so that you devastated the original measures designed to waterproof tiles tiles of course, this is the early you can find, but not out live in your home is a few decades we need to assure the long-term design, so you must pay attention to the bricks in the sidewalk without creature demolished
19 when the fusion is now bought ready-made cabinets are the most directly is because the family The water issues need to be close to create the design, of course designers in appending to circuit design but also inform the designers set their own homes who are often under the kitchen cabinets so the scale to better determine your cooking at home more cozy to use page metal cabinet recommended to choose such a colossal load to bear safe
tile sealant and not the same as the use of white cement, but the masons usually use the method fill fill white cement tile sealant, so that Time to go on sealant, sealant pointing to a little bit better and not dry the paste to the wall. Also, cabinet hinges, the pond water, switch and so use the good, the cabinet material, pond cell body, pins can be used in general, of course, if you will not concern about the money.
large package if I were you, I suggest to buy establishing materials to the east as far as feasible to their homes, actually the home, B & Q to buy such a place can be returned.
131, at the entrance to the light switch, we recommend using inductive type. Black day home, save the dark.
132, memorandum 1 foundation construction, water, electricity transformation
(a) before entering the construction crews on the water to minute test, before they are allowed to change management.) and can beat down the plaster layer, load-bearing walls for installation on the
(c) in the buried line of control If the original line to be changed, and can not use
(d) circuit to be buried in the dark wall of the best
(e) strong cordless
(f)
133, waterproof
(a) kitchen, health,
(b) 30 cm away from the wall to do it twice, more than 30 cm can do it afresh, coat need the waterproof door pocket door.
(c) waterproof finish to be dry, the Redo waterproof layer. Most likely the leak is the
134, tile
(a) the landlords is necessitated in the culling of tile for tile quality finds its way: first, to see its color is uniform, non-mottled black spots and small holes the line; followed depends on whether the standards of its size, the amount of tiles with a tape measure the width and width, measure out the size of the factory size to be consistent with its trademark, the diagonal and then the amount of the tile, such as the crooked line, then the tiles is affirmative; then look at the flatness of the tiles, the most simple and effective method is to tile the same brand of two overlapping positive and negate, such as overlap significantly after the gap between two chips of tile or you can swivel the tiles uneven; last look There is no color tiles, the method is to take out a few samples of the same type of tile, in the light are compared, such as do not see the color difference can be ordered.
(b) After the tiles stick can not have a whole piece of brick hollowing (local hollowing whole piece of brick can not exceed 20 percent sign), if the needs of the entire film Brick hollowing rework normal circumstances, Post 100 per brick, brick wall tiles are allowed to have a hollowing, brick tiles are allowed to have two hollowing,
Buy Lacoste Trainers, but must rework, rework the main material (already counted in the loss within) from them, such as Over this range, the main material responsible for the construction.
(c) Under regular circumstances, the level of tile degree of misdeed tolerance of 2 mm, the gap to be consistent with tiles, bricks and tiles should be smooth on the corner (allowed error of 0.5 mm), kitchen, health and brick wall in addition brick and tiles should be flat on the corner, the need to level degree (error to allow 1 mm) and vertical (allowing 2 mm error) to achieve, bathroom, balcony tile floor drain should be considered, you must first put away incline, if there is no special reasons may not have water.
(d) in the wall and floor tile Puwan required after the
135, anti-termite
(a) kick down the walls and the trough in the waste after, a comprehensive anti-termite (termites sprayed the entire house that pills)
(b ) After the entry of all plates in need of anti-termite treatment (specifically made for lumber termite category)
(c) required before wood floor shop to shop on the ground to do a wood floor termite
(d) termites spray to wet the drug is accepted (you can clearly see the wet)
136, the computer is also a research dollars, and now the calculator has multiple functions to set the decimal point, making operations will have different standards when, so we need to bring a computer yourself, and now mobile phones have computing capabilities, but the functionality is not good.
137, two better prepare themselves independent glass, plastic (1 clear, 1 white), recommends to the General Electric Company, B & Q for marketing, 49 a. Pretending to bath room, sink, cabinets, security doors when they need it. While the general factory installed package will come with glass, plastic, glass plastic, but most of them meager quality, easy to change color or mold the future.
138, if only a last resort, do not use toilet seat shifter. This stuff is very threaten to cause clogging toilet bowl water.
139, Lvkou Ban kitchen, two above the hood, open the chasms we have to wait a good hood entirely up security after installed. An early and I go home, and later removed to install hood Shiyou, individually and put them all out of shape by workers, seamless ceiling has become a ceiling joints.
140, if the intention of uniform appearance, is also fitted kitchen and bathroom doors, and that soon after the installation on the door marked with the ground glass joints where glue. I do not have time for processing, water workers are not detailed, a lot of water splashed on the ground infiltration to the door frame, the following part of it has been a little black (mold) of the.
141, must be tiled balcony! King terrace to angle nigh to shop, shop to life and railings to the balcony the same altitude. My outlook balcony to balcony wall angle and the life there is no shop, had arranged a tub of wall paint, refresh yourself on a normal foundation ... ...
142, sealed in the wall of water reform must grant the decoration apt invest detailed master water chart.
143, if the paint color for the walls, in the power needful to take into account the time for transformation of the line problem. Changed a lot of my household line, air-conditioning outlet bit all changed. But in mandate to save money, not for the entire line, but the wiring. This wiring must be installed where the whiteboard for future upkeep. Later, brushing the wall paint color, etc. only to find how these white glare, apologize ah ~~~~~
144, which is the lowest level I made a fault, I presumed that 1.5 m bed length is 1.5 meters, forget the thickness of the bed there. Very accurately in bedside cabinet to stay well behind the bulb socket on the wall. As a result, there is no way to block the outlet accustomed to be.
145, started before the skipper to make the decoration of the wall how to deal with the need to shovel out all the original abrasive. In particular, prepared to paint the wall works outsourced to the company's students. My family is narrow out to paint companies, such as woodworking look after painting the walls gray only kas long asit is bad, it is best to shovel out the whole re-Pihui. However, wood has been done, to shovel out the ash is not good the original operation. Finally had to brush the surface of a layer of glue Pihui 108.
146, increase the line must be re-wiring. But the terminal from the nearest branch wiring. The increase is not allowed in the original wire connector wiring.
147, air-conditioning control alternate merely in the power afford side. Added on the line is not allowed.
148, change the location of telephone and network cable, when the original linen of the line can be drawn to continue to use. However, if the unsuitable construction there will be many hidden perils. So the best room of the weak from the box to be replaced.
149, dimension circuit transformation workload is generally in agreement with the wiring in three different ways were fathomed.
(1) play slot pipe (at trough length measurement, if a tank with multiple root canals, calculated according to half the number of tubes. The other half included in the overhead lines.)
(2) overhead line (wearing tube not play slots), calculated according to the length of pipe.
(3) as cable, along to the digit even if the number of replaced (replaced the line to acquaint the construction team do no throw).
(4) feeble reform, according to the first method. The inconsistency is who should pay attention to the languid line is purchased. Owners will have less to buy cable prices.
150, how the toilet nailed to the floor, hit the screw with it? There is assembly at the base and pipeline, to buy what were sealed and the outside is better: the toilet was fixed with expansion screws. Convergence at the base and the inside of the pipe with a special sealant toilet. Out of white plastic with white cement + water slurry deployment. When the toilet is generally purchased with a special sealant.
151, buy materials, we must first enumerate your approximate method. To buy water when the material to do anyhow, afterward meditative about a painting materials along sea diagram in the end how many came out, so mini believe in no time the foreman, the result was that buy water 5 meters, the actual use 27 copper head months, really bought a 40, should the remaining 13, 7 short of the actual remaining 6. Under repeated answering of the boss behind from the additional site Details of their pre-calculated circuit material, the calculated results and behind comparing the foreman of the requirements: from 30 m to 12 cable meters, web cable from 20 meters to 13 meters, other such as insulating tape, plug had great access was I correct ... ...
152, if there are old water pipes under the ground, in addition to switch hit, it tends to be damaged, do not hesitate to be the laying of new, do not save, to ensure safety .
153, lavatory wall that retraction of the glove do not consume space, and posted a very agreeable quite good tile. Of course, namely tile alliance trouble saying
154, do not use tile received positive side of the line angle to 45 degrees splicing bricklayer before grinding pretty, of course, you do not choose Tijuana workers lazy way to do things.
155, aluminum pipe, when installed must be sealed cement workers in the supervision of the construction criteria in accordance to the hot water pipe Reserve space for expansion. Short plastic tube not closed mighty, and loose some of good thing.
156, the bathroom floor if higher than the lobby, the transition can be used to solve the door stone.
157, plus move the sewer pipe mouth, then the new and old sewer pipes should be checked before the entrance of the old sewer butt is smooth, this time a lot of money to clear the bit to avoid future trouble.
158, Lvkou Ban did not absence to buy high-price, very low Lvkou Ban has been far better than the achieve of PVC, the more money I tin not watch the effect of significantly assorted .
159, buy Lvkou Ban particular consideration to the keel and not Lvkou Ban itself (Lvkou Ban goal is not effortless to tamper also much), the keel often complete ghost.
160, the color of brick is hard to find satisfactory, and I did not find, but the two kinds of color are not satisfied with a staggered mosaic sub can approach 45 degrees but I am very satisfied with the results. This is indeed the bricklayer himself put forward good suggestions.
161, under the supervision of the ground water hateful to use is not in accordance with the requirements of my bricklayer but directly gushed on the ground, it can even do! It is not the best yourself, do not perturb but insured.
162, the slope of the bathroom floor before tiling to consider the good, the slope is not in accordance with national standard to achieve the effect of quick drainage, and if you use a deodorant or a svelte floor drain floor drain will be greatly increased drainage problems. Some people say that soak slope and pretty, I think it is ridiculousness. Instead larger slope water to quickly scamper a very clean and is very comfortable thing.
163, the LG door with platinum point fire board, the effect is good, but might consider if we made the decoration finished door. The door by hand is not refined, for reference only.
164, sink big market brand-name price is not cheap, brand-name quality mad bad.
165, the balcony door is best to use the same type of fire board. Balcony environment is harsher.
166, bathroom vanities and cabinets to do when they must think the size of basin avoid good fit in the hereafter.
167, the cup is cumbersome stuff, the best buy in the vicinity, or premier calculate of a good method of transport.
168, install the lock bolt head should pay attention to some wax, breaking to a December to late. If you do not cigarette, then the door handle must be taken to avert damage to wall.
169, matte paint namely tall and light is smart, do not listen to the painter, and if I were you brushed matte painter, said that its technology must be wrong. Similarly, if a good painter, said polyester polyurethane is not lying to you
170, insulating tape and Teflon tape in the store to buy dissimilar large supermarket was much better quality, and full weight, transition down the price is not valuable.
171, if the re-decoration will be used instead of talc putty finished, no big reason is that finished product easy to use putty. Especially after the painter fired when their own experience diy - talc tone putty sick of it.
172, installation and air leakage protection switch junction box of the project can not be provincial, but not on the outside to be on the interior, the original wage will want to save the old junction box outside the use, electrician recommended a new one on the interior, and as long ashe suggested this valuable. On the interior door is not bad,
Lacoste Swerve Lace Trainers, it really easy to use!
173, large decorating company directly to the workers on site clearance work may be more appropriate package, and better technology, tools, more
174, and air leakage protection switch to use the best brands. I used the Want to buy the real thing is simple, direct call MGE investigation headquarters phone number and called to ask the local branch number.
175, the audience slight pots pots than on stage, agreeable, good cleaning.
176, basin faucet with the audience to pay attention, taking into account the basin edge thickness, leading to the mouth longer.
177, the hole in front of the toilet installation is a big, large floor drain cover can fall off, if you have installed the toilet floor drain is not installed, do pay attention to floor drain cover, or the floor drain Ye Hao lid kept it up somewhere.
178, buy silicone, then the absolute best all imports of GE, GE followed by Shanghai packaging. Of course, if very important place in the 7,8 element that can also be used, such as aluminum window frames with internal Anjiu levels of silica waste to plug the whole. However, all use the bathroom GE silicone kitchen, merit for money!
179, triangular valves should not be omitted, and save much money, if the words of the triangle valve, triangle valve to be installed in advance of copper joints are not dripping, if I were you installed, then only the last copper fittings installed on the faucet to take over the baby when it was installed to check if the interior leakage, the total leakage to pressure some time to test it, and install internal and less safe if the lead.
180, even in the journal has been renewed to be done about those things, their own can do it, do not, but also with the idea, amuse decoration companies to communicate more with the designer, please construction team to communicate more with the workers, because the realization of your ideas, to depend on them.
181, fitting the biggest problem is communication!
182, little place, kitchen cabinet door type designed, BH. L-type should be designed.
183, common decoration, decoration companies, excluding the prim treatment fees, taxes, fares accounted for 75-80 percent sign materials, wages account for 20-25 percentage sign.
184, go in the kitchen on the ground appearance the pipe, that is, from home improvement to a time bomb, who say where Shashi Hou himself in trouble.
185, if the divide tube wear, but in a tank of great? Effects can persevere
186, ask what the restaurant and living room are separated between the most cost-effective package Door, side package only 6 cm, or polluted with white, height 2 m, was not large High crude.
187, strong and weak power transfer to each tube, to separate the best way, keep the distance of 10 cm or more, but it can be difficult, because most families in order to save costs and to open a slot. Weak audio line can see the same pipe.
188, inside furniture, paint and paste board can do a good job and opened the door and airing doors and windows at home, only to no pungent odor. In fact, you are using a good wood core board, do not handle with furniture inside.
189, the cabinet can be 15 cm plates and wood gist board, the back of the 5 available folders, Wuli. Package doors and Tizi use 9 per cent. Different materials with different techniques.
190, PPR pipe not only for cold water pipes, but also for hot water pipes, and even clean drinking water pipeline. PPR pipe interface with hot-melt technology, are completely integrated into the tubes together, so once installed oppression test, no leakage. PPR pipe and will not scale. PPR pipe scale never known, never oxidize, never leakage, green high water material.
191, paint board is good, the avails of both wood and composite.
192, do not print for a long time on the wet artificial stone, unless you want to dry a printing surface; they should not be long-term wet cutting board on the table. Wet wood is occasionally fade; rub the stain with a steel ball, like hand squeeze pimples.
193, can use an ordinary gas meter in the cabinet door closed it? Need to use the shutter-type door it? Check regularly open air on the line.
194, clear contracting the tx Please note, we must validate the renovation team give you a list of materials. Their estimates may be me, I too believe that they, and the results of wires and line to buy is almost doubled.
195, the size of definite planned sanitary ware, the best sketch in advance, calculate the size.
196, students pay attention to the door to buy products, if you want to chase results support the panel with the business package Door, then you may must be Henzai knife it!
197, Re: installation of water pipes are put before the governor and basin, sink have bought?
not, just determine where is the basin faucet, bathtub faucet, washing machine what's on the line leading, leading 99 percent sign and fell into the water are in line with international norms, at all times workers are not slovenly, all right. If you own basin cabinet, basin bought in advance, or optimistic about the size. In front of the sink to determine the amount of good size units, installed in front of buy Haojiu Hang Taiwan, do not forget that the crowd or on stage. Distance between hot and cold water pipes with cement tiles must be accurate before the closure of 15 cm, and must be parallel. If you have bought, it is best put something, such as sealed after the unload.
198, if an 8-core cable in the meantime take the phone and network, will not mediate with each other it? Not. 1,2,3,6 buffet cable module, 4,5 buffet the phone module, and the other two easily. My experience was right: 10M by 1236 100M in fact used to have the speed to 10/100M that we will not feel any different. If a 8pin line, then the whistle will cause some program-controlled switches on the network marking interference in the home environment generally will not have any problem. But rest assured that I can recommend such a path will leave apart to the margin, the network cable is very cheap that you say?
199, be sure to check the delivery carton installed properly.
200, fitted bath and shower faucet lessons interlocked to the faucet pipe is embedded in the wall, and I again told them to size to get exactly, not to masquerade not in season. The results left a hot and chilly water is 15 cm spacing, can be hot and cold water pipes are not collateral, the result took a plumber just put on the force feeding. Yesterday discovered that my fb guiding high temperature coating apparatus actually does obtain cracked. If we can first load guiding to the first installed it. Leader should be bought first, then install hot and cold water pipes, tiling it. Oujia bought early leader, is Oujia master to buy.