Quick Search


Tibetan singing bowl music,sound healing, remove negative energy.

528hz solfreggio music -  Attract Wealth and Abundance, Manifest Money and Increase Luck



 
Your forum announcement here!

  Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums > Post Your Free Ads Here in English for Advertising .Adult and gambling websites NOT accepted. > Business to Business Ads:

Business to Business Ads: This forum is for posting ads that would be of interest to other Business Owners. Things like Marketing Services, Supply Services, and Business Essentials.

Reply
 
Thread Tools Display Modes
Old 05-19-2011, 02:20 AM   #1
ertr7505o
 
Posts: n/a
Default 200 elaboration tips ( marital , nomaritaled have

1, the partition will not be the first shoe, leaving a little space so that the shoes can leak into the bottom ash, sink and gas stove top mounted lights. Given the location of the bathroom floor drain must first think well, a good amount of size. To drain the best side in the brick, if the bricks in the navel of it, no stuff how kind of tilted blocks, floor drain will not be the lowest point.

2, bathroom, air conditioning, no outlet design switches. Especially the bathroom water heater to a pair of level switch with a plug appropriate. To off to electric, pull the plug precarious

3, on the brick part of the treatment of sun angle, the final inquiry is to look at the workers class. If the level of good workers, plasterers, and better tools for grinding ceramic tile, they should not hesitate to choose the practice of grinding a 45 degree angle. In efficacy, by the time a good grinding, grinding angle of 45 degrees in the positive approach is the most beautiful! If the level of the workers do many, then you still choose to be positive angle, because the wrong grinding angle of 45 degrees angle of approach is not as yang effect of article.

4, line up the pipes after the water pressure test is also very momentous. Test, we must be present, and the test for at fewest 30 minutes or more, conditions permit, rather an hour. 10 kg of pressure, without any rebate before the final test.

5, while the steel doors steel door must be considered a good size walls frame protruding advise the installer, making the final skeleton and affixed to the wall tiles are flat finish, so not merely pretty, and good health to do.

6, carpenters and masons of the package Door tiling is to knot in, including door pocket of the time, to consider the following ground (the ground side of the door both side) is also affixed to ceramic tiles or other cement mortar thing, because if you stick tiles Mentao well before the fix has been package to the ground, with cement when the future, if the cement and Door stained, moldy water will cause wood Door

7, under the bed and the bed board must be breathable. Bed board is best for general use cedar board

8, do the paint as much as paper tape

9, buy a bulb to note: General tried to use glass, stainless steel, bronze or wood (shelf), and generally do not buy whichever other coatings plated steel on, ah, ah naught favor draw, easy to fade.

10, washbasin as ceramic pots, glass pots downright Health

11, water and electricity to its own transformation plan, and ask them to open Cao straight line. Watching them draw their own line, the whole line open by painting Cao. Each have their own approval Caixing.

12, water must be good, be sure to test the water!

13, many of the construction of a verbal accord into the gap checkout massacred, must be written in black and white, a change in the project are sure to ask what the price, write it!

14, ground floor, if installed, to re-do all the ground re-smooth membrane of cement.

15, the kitchen door, or to make a wooden decoration hanging rail wood doors for good.

16, the living room as much as possible to install the power plug.

17, is still to be done outside the bathroom shower partition. A shower curtain can not pull the easy way erroneous, real inconvenient, water everywhere.

18, do door and frame materials to choose fine grained materials.

19, before installing the cabinets must be sure your home water is OKAY.

20, kitchen floor tiles will not pick white.


21, ceiling, pay special attention to smooth putty before wiping Dulux

22, the number of living room lighting should not be too light, simple is better, or like the lighting mart!

23, to buy things that need to be installed as the installation requirements of sellers, it does not comprise installation, it must cling to only pay the full paragraph after the installation! !

24, the renovation period, before you collect from business card manufacturers carry

25, Lvkou Ban the protective movie is best removed before installation.

26, boot is best to use curtain doors, deodorant. Edges can depart a shoe outlet, to plug drying shoes.

27, cutting and a small safe place to light.

28, it is convenient restaurant exhaust fan can also be safe, so when you eat hot pot or do not dirty barbecue houses the Office of the ceiling.

29, the door is best to prepare a place debris in the cabinet, can be placed on top of shoe. The mutual things, such as umbrellas, bags, scissors, change, eat the medication, and so on there, so it is convenient.
30, there is no need to use your ceiling, if I were you too worried about moisture and cooking fumes, moisture-proof gypsum scrubbing brush is recommended to use waterproof paint, my health to do a visitor, very beautiful. If you must use Lvkou Ban smallpox, it is recommended:
1, not too expensive.
2, using the web color, particularly in the kitchen ceiling, white on the good, the color white unless and decoration style match, it will easily inconsistent.
3, download their own ideas,GHD IV Straighteners, do not believe selling the vision of smallpox, their vision was widely taint.
4, staring at himself in the scene, closing side is very important, do not let them slack, or leave a black suture, how to look how ugly.

31, the third day and continued to stick largely perforated tiles, scope hood, and water heaters to pre vent arrange, and if so then perforated tiles stick better, not easier. Therefore, before the renovation must be selected in the range hoods, stoves and water heaters, to determine the size of punch.

32, although taking into account the custom-made cabinets look good, but not durable, comprehensive outlooks of some of my classmates online and experience, to counter the framework of using cement to do, inside and outside the sides stick tiles, marble countertop shop, wall cabinet and cabinet wood door or chosen to do. Out of the cabinet to do so durable, moisture-proof. And spent another few. Read a good many of his neighbors say, I did not thump.

33, well after the door pocket, plasterers plaster line to start the installation, wall Pihui works. Comparison of the wall of my house was originally formed, agreed 2-3 road on it. Pihui acknowledged when a gray slick once, and then brush the primer, sanding again, after brushing, and finally double with ICI paint brush, the plenary wall looks smooth and flat, really good. Upon achievement of the ceiling wall, a carpenter started wardrobe. Albert wardrobe is 18cm's license Daixinban do paste veneer outside, although there is no furniture store to buy so good-looking, but durable, quality should be better than to buy. I'm not afraid of standing container board. I am terrified that is not enough to buy. Backplane is relatively thick, buying is thin.

34, other students in the tiling must pay attention to the following points:
① best he can in the scene.
② some less than perfect tile can attached in the hereafter some personnel do not look the place, such for cupboards, sinks, mirrors behind, yet likewise pay attention to tile, brick, etc. Do not waist is extra than the workers accompanied to the position, otherwise You can not watch anything in the future, merely also wasting money.
③ wall tiles, floor tiles in the paste before the overflow damage must be enough time.
④ sure to floor drain plug with something good out of cement down to prevent clogging. My home equitable because off the cement floor drain is blocked, and spent 30 looking for the management bureau to explicit, get up a lot of small dirt.
⑤ people at the scene, the workers will not be too consumed tiles. Tiling my family when not at the scene, then go, consumed a lot of bricks, it is the heartache, all the blood and sweat Mimi Yeah.

35, a wall of long, high. Such as a bathroom with four wall, each wall should measure out of its long, high. And then discount one of the windows and doors of the area. Finally, a numerical ground area. After the size of the amount you can also get a sub shop selling tiles, they will aid you re-match. Loss of 5 percent-plus on the line.

36, the best is a two bedroom ceiling light control, and a door, a bed, lying on the bed save the winter and then it corner off the light.

37, the socket must be considered a good location, height, interval. Even first met playing steel cassette position, the latter is found to just be put away the journal TV cabinet, microwave ovens, desks block, had to move the location of the first two high furniture, and eventually found not only ergonomic height, but also can not buy a good fit stainless steel cabinet legs, can only be made of aluminum foot.

38, just approximately the corner in the hallway of the tube with a good, shine and have that effect.

39, did not take into account when loading the table lamp nestle, it lights not in the middle of the table.

40, bathroom tiles do not use too much pigment, one easily dirty, and second, a long time, too blunt!


41, outlet to more equipment, furniture to buy outside the ground to dirt security to consider, like to see more housing, in principle, should adhere to.

42, Lvkou Ban did not need to buy high-price, very cheap Lvkou Ban has been far better than the effect of PVC, the more money I can not see significantly different results. Buy Lvkou Ban particular attention to the keel and not Lvkou Ban itself (Lvkou Ban goal is not easy to tamper too much), the keel often complete ghost.

43, the color of brick is hard to find satisfactory, and I did not find, whatsoever, not satisfied with the color of the two sub-cross mosaic is a 45-degree angle to accomplish the results I am very satisfied. This is indeed the bricklayer himself put forward good suggestions.

44, on the balcony on the top cupboard, then hit the back of the cabinet with a layer of waterproof insulation bubble board works well. Balcony door is best to use the same type of fire board. Balcony environment is harsher.

45, if no suitable molding may wish to custom, custom quality seems better than the sample also. More personalized and customized.

46, bathroom cabinets with stainless steel thighs are big profits to find some local stores to buy back price of mad cheap.

47, install the lock bolt head should pay attention to some wax, crashing to a December to late. If you do not smoke, then the door handle must be taken to avoid damage to wall.

48, Paco the floor well, I like to remind that the only directly to the boss about the price and the salesperson speak about than the price better.

49, matte painting is beautiful than the high light

50, if the re-decoration will use putty instead of talc products.

51, installation and wind leakage conservation switch junction box of the project can not be provincial, but not on the outside to be on the interior, the elemental wage will want to retention the antique coalition box outside use, electrical proposals put current ones in the room, and as long ashe recommended this expensive.

52, and air leakage protection switch to use the best brands. I used the Want to buy the real thing is simple, straight call MGE inquiry headquarters call number and called to ask the local branch number.

53, the spectators slight pots pots than on stage, agreeable, good cleaning. Basin mixer with the spectators to pay attention, catching into account the basin edge thickness, leading to longer jaws.

54, without any revision of the wall angle is also very beautiful, but to advance the stage of looking for the painter and the painter apparently put forward. angle Ding Jiaoxian do help to play the straight line.

55, online slots before the cement surface, surface treatment approved putty is very important, for no solid surface with a clean ball handling is very appropriate.

56, make plaster appropriate for a large hole on the wall, of course, if the hole is too big or need to use cement.

57, frosted glass on the back do not coated with paint to protect the hard to clean,GHD Deluxe Midnight 2011!

58, Caipen leader can be sure to switch back of the hand, that must be not easy to keep clean fingers, hand turn up when the oil is also difficult.

59, the price of elegance auto racks too much water, and found a number of relatively nameless mark in the structural design on the front line rather than the mark, the price is much lower.

60, could be considered safe on the ground of the metal socket, this socket 100 is very expensive, but very convenient, normally flush with the ground, the foot can plug a foot to pop up. Suitable for massive living room. Or on a dining room table, under, is used to insert peppery kettle (to prevent hanging back and along when moving wires)


61, storage room. TX has been said, but I did not do doors, looks very beautiful and easy to put dirty clothes in the cupboard.

62, starting bed frame (which is so called up.) I am a vocational company to buy the cloth-bed bed, and spent 350 yuan added such a thing, end of the bed there is a pull handle, the bed board will be turned up, exposing the bottom of the storage space, what a great Oh!

63, is not practical twice bar towel rack! Like the present and uses a single wand, hanging wand base layer will not look inside and then drying towels

64, inside the cupboard that the litter is not enough practical, than on the outdoor. There do not install the door plate of the trash bin and table, open the door when the summer will be very smelly. Trash or on the outside good.

65, the table afterward to the small cabinet, and can be placed on some matter, very handy.

66, to I think the mop bucket less claiming in terms of rendition, one can assemble themselves out of covered and the circling environment that is consistent with tile or mosaic outward, and money.

67, the bathroom can point nail nail to hang something in the hook.

68, designed a bathroom cupboard put clothing, no longer have to worry almost bathing forgot to clean raiment.

69, washing machines with drying is not solemn and practical, in addition to one annual, only the yellow mold-day, and the malign immense. Thick clothes, towels or drying leave, let the sun consumer disinfection to be good. Even amplified, you need to save the point of silver.
70, even in the laundromat room to do a laundry pail, used to hand wash something. Originally thought to use less, so buy a very cheap Terri leader. Did not think this is really convenient laundry tub, became my most frequently used a washing area. What rag ah, ah socks, and towels, ah, all washed in it, and even most hands there too.

71, fitted with lights really not practical, the decoration done up to now not opened. There are just SHOW guests to look at lighting, I simply forgot their own also installed a this thing. When the original is to open PARTY under romantic, and now do not have much become of opening spot.

72, the biggest course studied is namely in truth the simpler the better fitting, less pollution, less money, truce of mind.

73, useful stuff:
① designed arsenal room.
② North Terrace sink used to wash the dirt. Differences between the washbasin and toilet and washing vegetables for the kitchen sink.
③ bathroom can be plucked out of the guiding shampoo. (TX shampoo basin was never an exception.)
④ easy to clean the layers and the fitting cleaning tools.
⑤ work lights the kitchen table.

74, buy a lavatory must be a good value of their own pitch, or go buy a return that is really ... ...

75, Bath and Kitchen floor tiles stick better after a good amount of what the sometime did not do the level of the lowest point is not looking at the floor drain, or other teams did and decoration after passing, a lot of dead compartments.

76, window beads Angeles with the Great Wall of stone tiles is a 800X800. Manufacturers cut and edging, Mason posted. Pattern did not look good also
radiation.

77, bathroom shower room must be large enough size, and use transparent glass, shower in it will not seem so cramped.

78, should not use white cement tiles pointing nail. Did not chance a black month breach, hideous death. The results they have bought their own hook pointing deputy, that tired

79, the cabinet should be pad below the artificial stone after the board, with the result that there is no installation, it can not mow the pork in the above, agreed to give me nearly 2 months have not installed installed (only to polished once).
80, do not muddle the letter designer. Of course, you can visit several decoration companies and more, from the design in each extract something really useful, the key is what you want to dress up like home improvement.


81, if the floor drain has been installed by the original developers that hinder foul of the

82, bathroom tiles affixed to the ground after a good test the water, if water is relatively slow to rework instantly. Our household's water is relatively slow, then relented a bit, it was all a mini bath water, and made hundreds of our main Guardian have sleepy money in the shower pate, and surprise how the aggregate immediately relief.

83, fitted wash basin and mirror to be considered good, put brush glass shelf, towel rack comparative position.

84, bought the mirror to consider the position of mirror front lamps, and if do not absence to install a transient mirror front lamps, mirrors the size of the cover for the mirror to be able to set alongside the line of the best light.

85, put bathing ashore the terrace to be a small cabinet, easy to put some debris, such as washing powder among the debris. Both beautiful and practical

86, must be staring at the upstairs upstairs to do down the dripping water .... otherwise, get the wall cabinet, the wall is a mess ....

87, do not blindly follow the online buy, I later base that some themselves to buy cheaper than the sale.

88, TV backdrop will set up a few more outlets, TV, DVD .... a put, you will find enough outlets.

89, change the water well in the future to be considered before loading in the wash basin in the bulk example, for example, the left or right pots pots, water and drainage that is situated in what place. Otherwise, changing for the better after the finding phase of the wash basin was not fit!

90, on the curtains, we had better put your stay a size goes, the employer can not be less that size. If less, then, how how the. Or watched him cut his napkin.

91, the decoration of the construction process:
(1) approach, wrecking down a wall.
(2) bathroom, kitchen floor to do 24 hours off water tests (required the developer to complete this task.)
(3) cutting trough, water, electricity transformation and acceptance.
(4) sealed underground water secret trough renovation project without closing the water leakage test started waterproofing.
(5) bathroom, kitchens wall disk.
(6) Carpentry approach, suspended domes, plaster moldings.
(7) archives Door, window cover. Making wooden cabinet frame.
(8) simultaneous production of wooden doors, plastic doors and even pressure.
(9) wooden panel paint brush dust (food vegetable oil).
(10) leveling the table laying marble windowsill.
(11) wood neat panel, pasted, fine line production and installation.
(12) wall primary treatment, grinding, leveling.
(13) belongings, the door seams paste stickers (defended side).
(14) ICI oil for at least three times the wall.
(15) furniture painting approach, eye patch and paint.
(16) dealing with corners, laying floor tiles, wood or composite wood flooring, waterproof marble bar, skirting.
(17) lighting, sanitary ware,GHD Blue Butterfly 2011, deal, door bolt installation.
(18) clean up, floor tiles make up joints, dismantling.
(19) decoration preliminary acceptance within the company.
(20) three formal acceptance of date, delivery owners.

92, flue gas valve back together, be sure to clean and ensure the valve can switch freely and to able to open to the maximum, otherwise it will affect the effect of smoke hood. To remain in the installation of two ceiling is not installed, so hood and try and correct installation of the ceiling and then installed.

93, so much in the living room and dining room ceiling can not do not do it.

94, good air conditioning in mandate to take the line position, the power closer to the air conditioning as much as possible, so install air conditioning power cord to see part of it, leaving a track of regret.

95, to individually weigh and disc entire the available house sizes, size chart ambition be covered 楼书 elements and then re-wire tagging, the last size will instantly influence the interior design and furniture purchases.

96, line a bad choice if small size of the black walnut is always enough air, then need to have choice, or to accommodate substantial or attached their own ideas, of course, be both the best

97, began looking for decorators. To personal experience is cared, if it were not for especially large size and proposed to simple decoration, it seems more cost-effective to find some of the guerrillas. After installation it is best to introduce people, you have read and coincide to the eyes, especially the feeling of the person in charge of the decoration is more important, responsibility and gratitude of how, some of the former is more fussy, because if not a stripped-down, in fact, those who live almost on the outside will do mix, but the quality is good or bad may depend on a sense of responsibility.

98, the main furniture such as sofas, wardrobes, dining tables, chairs, cabinets, etc. had better take a look for advance, if the running around on the tired, you can find a few good large-scale home shopping plaza shopping, the basic trend to see it, so the next thing you do is based on their lusted style filter out the right things slowly. Some people take good style, meantime others grasp of color standards, it does not matter, anyway, there is time to consider, if you wait until clearance decoration, furniture, help wanted steps to go in the final will reluctantly adopt the inevitable and not very much.

99, has been bullish on the furniture is best to size down, and then to display the future situation of the virtual room.

100, the needful documents to buy something good must be maintained, a move that may exist on the post-retirement, a replacement will definitely benefit. In particular, some important items of the store receipts, pamphlets, etc., because a lot of things have a warranty period, the testify lost would be more trouble.


101, during the construction projects are sure to increase or lessen the price they asked for and then jot it in black and white.

102, check whether the construction is necessary protective measures, such as entrance doors to use pearl cotton wrap, a good window and floor tiling also appropriate protection.

103, as much as possible to communicate with construction workers, to determine whether he understands your directions. Put ourselves in every respect the work of the main, adore him, and people feel the magnitude of family, and began to live to whether it is more responsible fall butme of it? Saying goes, is not phoned (But if you face a treacherous cunning bully, who, it would must retaliate, quarrel) in particular to some peripheral projects is the need for co-ordination of several trades, the workers will be responsible to each other and coordinate their relative duties, Otherwise, we pass the money back and forth, all pass the buck. Like my mason to help me solve some carpentry thing, and electrical and determined some masonry problems. Because each teacher's experience is different, as long as he is compliant to help you find a way.

104, do not do the best furniture fixed, for it no longer may be some alterations in the layout. If we do have to grasp the quality, or endless trouble.

105, be sure to change the water carefully, one dictate of money; Secondly, if you do not need from the floor to the ceiling laid down water pipes, water pipes in case of a problem to big trouble.

106, according to their actual needs reasonable arrangements wiring, so as not to waste (especially the cloth with a lot of lights and lighting if I were you practical, we must also try to avoid tandem use, waste electricity), but some places can not be Province, case in point, next to the bathroom mirror, hairdryer and shaver to often; well inside or below if the shoe has a socket is good, can roast shoe device, I now regret not quite this wire cloth.

107, the bathroom as wet and dry area, if area is small with a base like (special glass basin was nasty, lazy with remind); conditionally set a waterproof cabinet incorporating small debris is best, put everything certainly does not look good on the outside.

108, wood glossy white paint brush when the polyester better than the Nitro (which is to hear to experienced painters speak.)

109, the cabinet must be carefully chosen, likened to more than a few quality, we go to do a solid fixed, because this one is easily thousands of ocean, and narrated to the stove and sink and so on, so it is still not to pamper in corrupt cheap good. But best not to do in the cabinet table or inside the trash; there is, if funds are limited, basket, basket seasoning, rice bucket of what you can do all of these components in the cabinets sell the company in general is very expensive.

110, closet preferably more not less, preferably big not small, the women remember! Dangling from the longest space to be able to wear down.

111, such as glass or mirrors not treatment things the best buy in the vicinity, or first calculate of a good method of transport.

112, curtains, furniture, family appliances in the entire approach is best and then made to match the overall style tone. However, before washing can trail installed.

113, gas change management best tiling complete, or there may be damage to the wall. Best to let the gas company to draw a chart or on the wall as a symbol of the company to be required because of the cabinet body beginnings in the cabinet.
114, cabinet installatiin season is longer, anywhere from 4 to 5 hours, or more than 2 days, must be psychologically prepared. Installation can check whether the material is used in the kind of set you (the hinge hole can be seen through the cabinet material). Before installing the kitchen cabinets before cleaning it, because once the installed cabinets, no way those dead ends and then cleaning up.

115, furniture installation is best looked at in the next, especially as the wardrobe of the laminates are several holes on the choice, I was not looking at the results of the small distance between the laminates, hang clothes extend not open, even after the adjustment.

116, taking into account the formaldehyde pollution of the environment, such as spider plants can be placed in the green room, furniture doors open all the emission of odor, but also to buy something special spray to eliminate odors.

117, installation of combustible gas, reservation gas ignition.

118, Brush Wood of the time: the best Puwan other rooms painted tiles or wood flooring. If you must brush, the best have to clean the room. No floor tile or wood floor room, the room a lot of dust, then brush Wood, then brush off the dust lightly additional to the surface of wood products Wood, feels a tingling sensibility, notwithstanding this can be higher tag and then brush repeatedly sanding solution, but in the end it feels to feel the brush and the overall effect will be a deduction RBI. Puwan brick room after the brush, when the dust content in the air before the shop a lot less than the elementary Wood does not arise again after the dust brush addition on the surface of the wood products. All that being said, because a small renovation to kick the Wu family situation, I had decided to buy in Canada Wood hello seen it before the effect of brush, and feel very smooth, feels like my home-improvement Howley, like wooden doors. Only because of the above, the results of effects to play a lot of discounts, it has been named Wu apologize things. And I buy in the union hi the process of adding paint, some students appeared in this family. So to prompt students to take note of here. Wood I do not know whether the other circumstance, but according to the rule of same reason, so here to remind students to pay attention to it.

119, on the fill paint: painting pedagogue pay is waiting another batch of finished dry wall putty, putty is dry paint. After brushing paint loaded if no reason is necessary to switch the lamps and various electrical appliances. Ask somebody to install lighting and electrical switches to remind the teachers to pay attention to this and a clean install Sin before hand, so that when installed will not be a dirty wall. Will save a touch-up painting processes the. Of course, tarnished the walls, the decoration is to determine the paint department teams to pay up painting again, that is, the walls will get dirty clean (if it is paint companies, they also allow teachers to pay to make paint, If you pay attention to what a lot of paint division will be left in the part after brushing the wall paint, which is the remaining part of the paint used to make paint.) Just note, do not let install lighting division to pay soiled walls, paint can make teachers pay less for a voyage (or at least half a day), but also facilitate a lot of our own, and why not? Sometimes, with people easily, also has been easy. In general, a house painter will paint before brushing the Wood, Wood to do so is to avoid the process of dry brush would paint the walls of the wall clash. Of course, in actual operation, you can also Puwan after tiles (floor tile wall of the putty has been approved before the good) painted Wood, Wood, etc. after whitewashing paint dry, but to do so, of course, will affect the period. If the alarm of affecting the period of the case, but also the impact of the air to minimize dust, then point to a lot of industrious to clean the room, the health of the.

120, decoration team choice: As the first company chose the guerrillas or the normal, I think is not important, the opener is to give you the head of the construction team is responsible, the technical renovation of the workers, of course, the quality of the decoration and prices.
First, find the decoration companies not more than four, for the most partis this, if your time is very wealthy, it is another matter. And decoration companies to talk about this before, must be clear that you have to do renovation projects, you can call the company reported that all the decoration items, compare prices and comprehensive after taking into account the various ingredients and decide what the next items you want to outsource , which items to embroider the company to do.
the decoration of the people, the decoration of the attempt as cheap as possible, of course, inverse to the views of decoration company. Sometimes the decoration company to La Shengyi, will offer some of the weight of relatively low, this way, the project quality and the quality of materials is more laborious to vouch. Renovation so many, you want to term items are the lowest, it is unrealistic. And the renovation of the offer, you can not just look at mathematics, which also depends on the content of the materials used in this project, descriptions, brands and so on. You know, the decoration of each of the quotes are actually quite an art to.


121, the construction? As I am not eager to stay, it plans to look in occasional workers: your neighbors a good home builders are possible to become the thing of my looking for: a mason, a carpenter, a plumber, a painter. Designed to do step by step step by step, I trust, going slowly and deliberately.

122, to use every cent wisely: see at the decoration materials, he have to be looking exhausted, there are so many good things, it seems, like every unattached see, and economically competent to resist . A short phase of period to make all these things can be purchased in place, the economic oppression is so big. Most people at this time is often in disarray, the results of the last 1 also much over budget, the second is the U.S. price of the first things to buy tall quality, then buy something is mixed.
My view is:
one pre-determined price, after the plebiscite materials.
excess of the expected price of 10 percent-of material merchandise, do not waste time. Business is always nice too customers. I am act a careful timetable of materials needed in the future will be posted in the post for your reference.
Second, you could save on the province, the flower to flower.
the most expensive place is carpentry, kitchen cabinets.
most disposed to water quality problems is the transformation of the place, kitchen and toilet water.

123, the spend of furniture than to buy some furniture. 500-700 yuan per square meter of ordinary furniture.

124, covert project was not to save money the most important place: the circuit transformation of water, water treatment.
approach is to ask B & Q to do, B & Q now have individual decoration services: such as water reform, since the purchase of materials, water per meter 40 yuan, 20 yuan per meter circuit, with 6 months engagement. Details of B & Q on the first floor in the east of the individual services and pricing announced, we do reference

125, the most hassle free way is to use online resources, the accumulation, save, sorting integration, will surely be useful when.

126, in order to save time, amend efficiency, each has a acquisition on the decoration materials mart, a detailed and practical procurement schedule and budget is very important.
list at chamber category procurement blueprint is easier to implement: each took to the avenues to see things the same chamber, to facilitate comparison and comprehensive
together, threaten to have success.
one hall project
Second, the living room works
three, four restaurants engineering
, master bedroom project
five or six kid
housing projects, learn projects
VII, the main Health Project
eight, nine passenger
Health Project, the kitchen works
ten, eleven
balcony engineering, engineering
Yin Taiwan is now put my own plans like the table set out in the retinue post, for reference: file in the table as an instance. This list is used as a procurement plan
more convenient, the corresponding project before construction can be re-classified according to types of combination, into masonry, carpentry, electricity, water, paint and other re-tabulation. The right side of the table can also add If (emulsion paint three batches of three brush; shoe plate by Albert, brush polyurethane varnish) and so on.

127, home cinema rear spokesmen, the sound cables to be embedded in the living room below, this is very important!

128, add a sink on the balcony, decorated to embedded pipes. Balcony sink is very important, gardening, washing hands.

129, toilet, kitchen need background music, audio and audio wires embedded before the renovation.

130, both sides must stay on the balcony outlet, Chinese New Year lantern, good power.


1: the bathroom is divided into 2 areas of wet and dry on the wet area floor drain better
2: If you are burning natural gas water heater care to the bathroom to have ample airing to set
3 - 4: If you do not know if friends can ask a professional chef, accompanied by the now more than a lie.
11: hydropower is still looking for professionals to help themselves because the features in this environment also inform the design of their own lives who need to be altered in the transformation of migration, but if there are problems when the house until you have installed the
line problems and have to re-do the wall torn down was a very big head thing.
12: waterproof bathroom of their alternative should depend on the bathroom floor tile floor tile professionals are there to do this in the purchase of water treatment can repose ensured that when you do bad, but because the waterproof design problems in the alternative of size If you meet after the designers got the motif that he would not cut off the bricks to fill the ground so that you destroyed the original measures designed to waterproof tiles tiles of course, this is the early you can find, but not out live in your family is a few decades we need to ensure the long-term design, so you must pay attention to the bricks in the pavement without creature devastated
19 when the alignment is now bought ready-made cabinets are the most directly is because the family The water issues need to be near to establish the design, of course designers in addition to circuit design but also inform the designers set their own homes who are often under the kitchen cabinets so the scale to better determine your cooking at home more comfortable to use sheet metal cabinet recommended to choose such a large load to bear safe



tile sealant and not the same as the use of white cement, but the masons usually use the method fill fill white cement tile sealant, so that Time to go on sealant, sealant pointing to a little bit better and not dry the paste to the wall. Also, cabinet hinges, the pool water, switch and so use the good, the cabinet material, pool cell body, needles can be used in general, of course, if you will not care about the money.
large package if it were not for, I suggest to buy creating materials to the east as far as possible to their homes, actually the home, B & Q to buy such a place can be returned.
131, at the entrance to the light switch, we recommend using inductive type. Black day home, save the dark.


132, note 1 basis construction, water, electricity transformation
(a) before entering the construction troops on the water to minute test, before they are allowed to change management.) and can beat down the plaster layer, load-bearing walls for installation on the
(c) in the buried line of control If the original line to be changed, and can not use
(d) circuit to be buried in the dark wall of the best
(e) strong cordless
(f)



133, waterproof
(a) kitchen, health,
(b) 30 cm away from the wall to do it twice, more than 30 cm can do it again, mantle need the waterproof door pocket door.
(c) waterproof finish to be dry, the Redo waterproof layer. Most likely the leak is the


134, tile
(a) the employers is required in the selection of tile for tile quality finds its way: first, to see its color is uniform, non-mottled black spots and small holes the line; followed depends on whether the standards of its size, the amount of tiles with a tape measure the length and width, measure out the size of the factory size to be consistent with its trademark,GHD Straighteners NZ, the diagonal and then the amount of the tile, such as the crooked line, then the tiles is positive; then look at the flatness of the tiles, the most simple and effective method is to tile the same brand of two overlapping positive and negate, such as overlap significantly after the gap between two pieces of tile or you can turn the tiles uneven; last look There is no color tiles, the method is to take out a few samples of the same type of tile, in the light are compared, such as do not see the color difference can be ordered.
(b) After the tiles stick can not have a whole piece of brick hollowing (local hollowing whole piece of brick can not exceed 20 percent sign), if the needs of the entire film Brick hollowing rework normal circumstances, Post 100 per brick, brick wall tiles are allowed to have a hollowing, brick tiles are allowed to have two hollowing,GHD Hair Straightener, but must rework, rework the main material (already counted in the loss within) from them, such as Over this range, the main material responsible for the construction.
(c) Under normal circumstances, the level of tile degree of misdeed tolerance of 2 mm, the gap to be persistent with tiles, bricks and tiles should be flat on the turn (allowed misdeed of 0.5 mm), kitchen, health and brick wall in increase brick and tiles should be flat on the corner, the need to level degree (error to allow 1 mm) and vertical (allowing 2 mm error) to achieve, bathroom, balcony tile floor drain should be considered, you must first put away incline, if there is no special reasons may not have water.
(d) in the wall and floor tile Puwan necessary after the


135, anti-termite
(a) kick down the walls and the trough in the garbage after, a comprehensive anti-termite (termites sprayed the whole house that pills)
(b ) After the entry of all plates in need of anti-termite dispose (specifically made because wood termite classification)
(c) necessitated before wood floor shop to shop on the ground to do a wood floor termite
(d) termites spray to wet the drug is favored (you can clearly see the wet)


136, the calculator is also a research dollars, and now the computer has multiple functions to set the decimal point, making operations will have different standards when, so we need to bring a calculator yourself, and now mobile phones have computing capabilities, but the functionality is not good.


137, two better prepare themselves neutral glass, plastic (1 clear, 1 white), recommends to the General Electric Company, B & Q for sale, 49 a. Pretending to bath room, sink, cabinets, security doors when they need it. While the common factory installed package will come with glass, plastic, glass plastic, but most of them needy quality, easy to change color or mold the future.


138, if I were you a last resort, do not use toilet seat shifter. This stuff is very likely to reason clogging toilet bowl water.


139, Lvkou Ban pantry, two above the hood, open the holes we must await a good hood entirely up security after installed. An early and I go home, and after removed to install hood Shiyou, separately and put them all out of fashion by workers, seamless ceiling has become a ceiling joints.


140, if the purpose of uniform appearance, is also fitted kitchen and bathroom doors, and that presently after the installation on the door apparent with the ground glass joints where paste. I do not have time for processing, water workers are not thoughtful, a lot of water splashed on the ground infiltration to the door frame, the following part of it has been a little black (mold) of the.


141, must be tiled balcony! King balcony to angle around to shop, shop to life and railings to the balcony the same height. My view balcony to balcony wall angle and the life there is no shop, had prepared a bucket of wall paint, activate yourself on a regular basis ... ...


142, sealed in the wall of water reform must allow the decoration to provide detailed master water map.


143, if the paint color for the walls, in the power necessary to take into account the time for transformation of the line problem. Changed a lot of my family line, air-conditioning outlet bit all changed. But in order to save money, not for the entire line, but the wiring. This wiring must be installed where the whiteboard for future maintenance. Later, brushing the wall paint color, etc. only to find how these white glare, regret ah ~~~~~


144, which is the lowest level I made a blunder, I supposed that 1.5 m mattress width is 1.5 meters, forget the thickness of the mattress there. Very accurately in bedside cabinet to stay well behind the lamp socket on the wall. As a result, there is no way to stop the outlet used to be.


145, started before the skipper to make the decoration of the wall how to deal with the need to shovel out all the original powder. In particular, prepared to paint the wall works outsourced to the company's students. My family is narrow-minded out to paint companies, such as woodworking look after painting the walls gray only kas long asit is bad, it is best to shovel out the whole re-Pihui. However, wood has been done, to shovel out the ash is not good the original operation. Finally had to brush the surface of a layer of glue Pihui 108.


146, addition the line must be re-wiring. But the terminal from the nearest branch wiring. The addition is not allowed in the original wire connector wiring.


147, air-conditioning control switch only in the power supply side. Added on the line is not allowed.


148, change the location of tel and network cable, when the original cloth of the line can be drawn to continue to use. However, if the unfit construction there will be many hidden dangers. So the best room of the weak from the box to be replaced.


149, dimension circuit transformation workload is generally in accordance with the wiring in three different ways were measured.
(1) play slot pipe (at trough length measurement, if a tank with multiple basis canals, calculated according to half the number of tubes. The other half included in the overhead lines.)
(2) on the head of line (wearing tube not play slots), calculated according to the width of pipe.
(3) for wire, according to the digit even now the number of replaced (replaced the line to tell the construction crew do not dart).
(4) weak reform, along to the first means. The feud namely who should pay attention to the feeble line namely purchased. Owners will have less to purchase cable costs.


150, how the toilet firm to the floor, hit the screw with it? There is assembly at the bottom and pipeline, to buy what were sealed and the outside is better: the toilet was firm with expansion screws. Convergence at the base and the inside of the pipe with a special sealant toilet. Out of white plastic with white cement + water slurry deployment. When the toilet is generally purchased with a special sealant.



151, buy materials, we must first calculate your resemble method. To buy water when the material to do anyway, after thinking about a painting materials by sea draft in the end how many came out, so little confidence in no time the boss, the result was that buy water 5 meters, the actual use 27 copper published months, actually bought a 40, should the remaining 13, seven short of the actual remaining 6. Under reiterated questioning of the foreman back from the other site Details of their pre-calculated circuit material, the calculated results and after comparing the foreman of the requirements: from 30 m to 12 cable meters, network cable from 20 meters to 13 meters, other such as insulating tape, plug had excellent access was I correct ... ...


152, if there are old water pipes under the ground, in addition to switch hit, it tends to be damaged, do not hesitate to be the laying of new, do not save, to ensure safety .


153, bathroom walls that retraction of the mitt do not waste space, and posted a very good very pleasing tile. Of course, that tile alliance trouble saying


154, do not use tile received affirmative side of the line angle to 45 degrees splicing bricklayer before grinding pretty, of way, you do no select Tijuana employees inactive direction to do things.


155, aluminum pipe, when installed must be sealed cement workers in the supervision of the construction standards in accordance to the hot water pipe Reserve space for expansion. Short plastic tube not closed lusty, and loose some of good thing.


156, the bathroom floor if higher than the auditorium, the transition can be used to solve the door stone.


157, plus migrate the sewer pipe mouth, then the new and old sewer pipes should be checked before the entry of the old sewer butt is smooth, this time a lot of money to clear the bit to avoid future trouble.


158, Lvkou Ban did not need to buy high-price, very inexpensive Lvkou Ban has been distant better than the effect of PVC, the more money I can not see the effect of significantly different .


159, buy Lvkou Ban particular attention to the keel and not Lvkou Ban itself (Lvkou Ban goal is not easy to meddle too much), the keel often complete specter.


160, the color of brick is hard to find satisfactory, and I did not find, but the two kinds of color are not satisfied with a staggered mosaic sub can reach 45 degrees but I am very satisfied with the results. This is absolutely the bricklayer himself put along good proposals.



161, under the supervision of the ground water repellent to use is not in accordance with the requirements of my bricklayer but directly gushed on the ground, it can even do! It is not the best yourself, do not bother but assured.


162, the slope of the bathroom floor before tiling to consider the good, the slope is not in agreement with citizen criterion to achieve the effect of quick drainage, and if you use a deodorant or a svelte floor drain floor drain will be greatly increased drainage problems. Some people say that soak slope and pretty, I think it is nonsense. Instead larger slope water to rapidly escape a very clean and is very comfortable thing.


163, the LG door with platinum point fire board, the effect is good, but might consider if we made the decoration finished door. The door by hand is not refined, for reference only.


164, sink big market brand-name price is not cheap, brand-name quality outrageous bad.


165, the balcony door is best to use the same type of fire board. Balcony environment is harsher.


166, bathroom vanities and cabinets to do when they must consider the size of basin avoid good eligible in the future.


167, the glass is ponderous stuff, the best buy in the neighborhood, or first think of a good means of transport.


168, install the lock bolt head should pay attention to some wax, breaking to a December to late. If you do not cloud, then the door handle must be taken to lest mar to wall.


169, matte paint is high and light is beautiful, do not listen to the painter, and if it were not for brushed matte painter, said that its technology must be bad. Similarly, if a good painter, said polyester polyurethane is not lying to you


170, insulating tape and Teflon tape in the cache to buy different large supermarket was much better quality, and full heaviness, conversion down the price is not expensive.



171, if the re-decoration will be accustomed instead of talc putty finished, no big reason is that finished production easy to use putty. Especially behind the painter launched when their own experience diy - talc intonation putty sick of it.


172, installation and air leakage protection switch junction box of the project can not be provincial, but not on the outside to be on the interior, the original wage will want to save the old junction box outside the use, electrician recommended a new one on the interior, and now thathe suggested this valuable. On the interior door is not bad, it really easy to use!


173, large decorating company directly to the workers on site clearance work may be more appropriate package, and better technology, tools, more


174, and air leakage protection switch to use the best brands. I used the Want to buy the real thing is simple, direct call MGE investigation headquarters phone number and called to ask the local branch number.


175, the audience delicate pots pots than on stage, good-looking, good cleaning.


176, basin faucet with the audience to pay attention, taking into account the basin edge thickness, leading to the mouth longer.


177, the hole in front of the toilet installation is a big, large floor drain cover can fall off, if you have installed the toilet floor drain is not installed, do pay attention to floor drain cover, or the floor drain Ye Hao lid kept it up elsewhere.


178, buy silicone, then the absolute best all imports of GE, GE followed by Shanghai packaging. Of course, if very important place in the 7,8 factor that can also be used, such as aluminum window frames with internal Anjiu levels of silica waste to plug the whole. However, all use the bathroom GE silicone kitchen, amount for money!


179, triangular valves should not be neglected, and save much money, if the words of the triangle valve,GHD Diamond Flag 2011, triangle valve to be installed in advance of copper joints are not leaking, if necessary installed, then only the last copper fittings installed on the faucet to take over the child when it was installed to check whether the internal leakage, the total leakage to pressure some time to test it, and install inner and less safe if the lead.


180, even in the memo has been renovated to be done about those things, their own can do it, do not, but also with the idea, please decoration companies to communicate more with the designer, please construction team to communicate more with the workers, because the realization of your ideas, to depend on them.




181, fitting the biggest problem is communication!


182, little place, kitchen cabinet door type designed, BH. L-type should be designed.


183, general decoration, decoration companies, excluding the formal management fares, taxes, fees accounted for 75-80 percent sign materials, wages account for 20-25 percent sign.


184, go in the kitchen on the ground outside the pipe, that is, from home correction to a time bomb, who say where Shashi Hou himself in trouble.


185, if the divide tube wear, but in a tank of great? Effects can endure


186, ask what the restaurant and living room are separated among the most cost-effective archive Door, side package only 6 cm, or contaminated with white, altitude 2 m, was not large High crude.


187, strong and weak power transmit to each tube, to separate the best way, keep the distance of 10 cm or more, but it can be difficult, because most families in order to save costs and to open a slot. Weak audio line can see the same pipe.


188, inside furniture, paint and paste board can do a good job and opened the door and ventilation doors and windows at home, only to no pungent scent. In fact, you are using a good wood core board, do not handle with furniture inside.


189, the cabinet can be 15 cm plates and wood core embark, the behind of the five available folders, Wuli. Package gates and Tizi use nine per cent. Different matters with differ techniques.


190, PPR pipe not only for cold water pipes, but also for hot water pipes, and even clean drinking water pipeline. PPR pipe interface with hot-melt technology, are completely integrated into the tubes together, so once installed suppression test, no leakage. PPR pipe and will not scale. PPR pipe scale never known, never rust, never leakage, green high water material.


191, paint board is good, the advantages of either wood and composite.


192, do not print for a long time on the rainy artificial stone, unless you want to dry a printing surface; they should not be long-term wet cutting board on the table. Wet wood is periodically fade; rub the dye with a steel ball, like hand squeeze pimples.


193, can use an ordinary gas meter in the cabinet door closed it? Need to use the shutter-type door it? Check regularly open air on the line.


194, clear contracting the tx Please note, we must validate the renovation team give you a list of materials. Their estimates may be me, I too believe that they, and the results of wires and line to buy is almost doubled.


195, the size of definite planned sanitary ware, the best sketch in advance, calculate the size.


196, students pay attention to the door to buy products, if you want to pursue results assist the panel with the commerce package Door, then you may must be Henzai sword it!


197, Re: installation of water pipes are put before the leader and basin, sink have bought?
not, just make sure where is the basin faucet, bathtub faucet, washing machine what's on the line leading, leading 99 percentage sign and fell into the water are in line with worldwide norms, by the time workers are not careless, all right. If you own basin cabinet, basin bought in advance, or optimistic about the size. In front of the sink to determine the amount of good size units, installed in front of buy Haojiu Hang Taiwan, do not forget that the audience or on stage. Distance between hot and cold water pipes with cement tiles must be accurate before the closure of 15 cm, and must be parallel. If you have bought, it is best put something, such as sealed after the unload.


198, if an 8-core cable in the meantime take the phone and network, will not mediate with each other it? Not. 1,2,3,6 hit cable module, 4,5 hit the phone module, and the other two easily. My experience was right: 10M by 1236 100M in fact used to have the speed to 10/100M that we will not feel any different. If a 8pin line, then the signal will cause some program-controlled switches on the network signal interference in the home environment generally will not have any problem. But rest insistent that I can recommend such a route will leave separately to the margin, the network cable is very cheap that you say?


199, be sure to check the delivery carton installed properly.


200, fitted bath and shower faucet lessons connected to the faucet pipe is embedded in the wall, and I again told them to size to get precise, not to pretend not in due time. The results left a hot and cold water is 15 cm spacing, can be hot and chilly water pipes are not collateral, the result took a plumber just put on the compel feeding. Yesterday discovered that my fb leadership high temperature coating device really does get cracked. If we can first load leading to the first installed it. Leader should be bought first, then install hot and cold water pipes, tiling it. Oujia bought early actuator, is Oujia master to buy.
  Reply With Quote

Sponsored Links
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT. The time now is 05:28 AM.

 

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum