According to the voice , Fall , slope protection under construction collapsed a steel frame to form a 70 m long ,
mbt m walk, 40 meters of the deposits of high blocking traffic. Is now fully cleared,
herve leger dress cheap, at the current pace is expected to be about 5 pm today reopened .
According to the latest news, Tianquan 318 also has dangers , the relevant personnel are to inspect . We also pay close attention.
04 this morning when the flowers Yaan City in Yingjing County Bridge No. 2 Yingjing Beach shore abutment destroyed , causing 108 lines were completely interrupted, temporarily can not be restored within short time . At present, the transport sector have been organized human machinery removed. In addition,
jordan 23 shoe,
4月份北京商品住宅涨价23.4% 连续10月涨幅扩大, this morning,
gucci shoes,
retro air jordan 1 中国载人空间站工程启动 明年发射, 5:30 ,
asics gel womens,
mbt clearance 公安部24日将通报破获一起重大恐怖组织, provincial S306 line source Jinkouhe Han Kim and Wu Leshan transfer bridge, roadbed was washed away 12 meters , blocking traffic.