Quick Search


Tibetan singing bowl music,sound healing, remove negative energy.

528hz solfreggio music -  Attract Wealth and Abundance, Manifest Money and Increase Luck



 
Your forum announcement here!

  Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums > Other Methods of FREE Advertising > Guest Books Directory

Guest Books Directory Here is a great way to get some inbound links to your site, and message heard by people who also post and read these books. (Tip: Dont use your real email address on them)

 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
Old 04-08-2011, 05:31 PM   #1
wtixh944
 
Posts: n/a
Default Microsoft Office 2010 Professional Microsoft set t

Microsoft is acquiring able to open its Quincy,Microsoft Office 2007 Enterprise, Wash., datacenter in early 2011, and it is planning to also “turn on” two other new datacenters in the coming year.According to January 4 “MS Datacenters” blog post, the Quincy datacenter is built around some of the concepts Microsoft pioneered in its Dublin and Chicago facilities. But it also is adding some new infrastructural twists. It will make use of pre-assembled components (PACs) across the entire facility, incorporating modular electrical, mechanical, server and security “building blocks.” This design will better allow Microsoft to build out its datacenters as capacity needs grow,Microsoft Office 2010 Professional, said Kevin Timmons,Microsoft Office Enterprise 2007, General Manager of Datacenter Services, in the post.“Our modular design enables us to build a facility in significantly less time while reducing capital costs by an average of 50 to 60 percent over the lifetime of the project,” Timmons blogged.Phase 1 of the new Quincy datacenter will be located adjacent to next to the existing 500,000-square-foot facility Microsoft already operates in Quincy. The new building will look like a tractor shed, Timmons said, and will be “virtually transparent to ambient outdoor conditions,Microsoft Office Professional Plus 2010, “allowing us to essentially place our servers and storage outside in the cool air while still protecting it from the elements.”Microsoft is preparing to open new modular datacenters later in 2011 in Virginia and Iowa.Microsoft nearly pulled its datacenter out of Quincy a year ago, due to tax concerns, temporarily halting new construction there.One more (tangentially) related Quincy note: There;s a Microsoft technology codenamed “Quincy,Microsoft Office 2010 Professional,” which is a scheduler for distributed clusters. That “Quincy” is part of Microsoft;s Dryad family of technologies, which Microsoft in late 2010 made available to external testers in prepration for final delivery in the latter half of 2011.
  Reply With Quote
 


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT. The time now is 01:51 PM.

 

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum