Quick Search


Tibetan singing bowl music,sound healing, remove negative energy.

528hz solfreggio music -  Attract Wealth and Abundance, Manifest Money and Increase Luck



 
Your forum announcement here!

  Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums > Free Advertising Forums Directory > Internet Marketing Forums

Internet Marketing Forums This is a list of Internet Marketing Forums that have a FREE Advertising Section that you can post your ads in.

 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
Old 03-20-2011, 09:36 PM   #1
uvdwss4c
Sergeant First Class
 
Join Date: Mar 2011
Posts: 119
uvdwss4c is on a distinguished road
Default Water culvert cofferdam breach inundated nearly 20

nearly 200 acres of ponds over the water
rain for two days under the collapse of the cofferdam
yesterday morning, in the city of Nanjing, near Lake Gaochun solid dozen farmers, Morning 84,701,110 to reflect hotline, around 10 pm the day before yesterday, solid Lake culvert under construction cofferdam of a sudden burst, nearly 200 acres within the dam fish ponds flooded. But when reporters went to investigate, but what these farmers are reluctant to say, suspected to have been sealed products. In this regard, a person in charge of urban solid Gaochun given negative.



cofferdam in solid collapsed culvert Lake site, the workers told reporters here turned out to be a culvert, called Shijia Han, is the century, made the early 80s, appeared every season Shijia Han piping is very dangerous, early last month, the winter dry season water resources department, re-construction of the culvert, ready to build a van,MBT Kisumu, culverts, dug in the dam a gap of about 30 meters wide, and in the solid side of Lake City, erected a cofferdam out of the extended arc, only to 10 pm the day before yesterday, this sudden burst cofferdam.


for to reflect the town government over the matter.


interview, for the construction of the culvert unit who were on site one by one tight-lipped,Imara Sandals, reporters found that there is no public notice signs at the site. In which a reporter went to the farmers, was flooded to waist-deep, fish ponds and the crabs, fish ran. However, these farmers still no one willing to speak to reporters.
Zhaoqi Fu also introduced, after a preliminary investigation, the accident caused by two main reasons, first of all,MBT Chili, the project team to do cofferdam, the slope in place than without causing landslides. Second, the engineering team to do cofferdam, some of the piles did not play no real place to play is the main reason causing landslides. At the same time, there is a natural cause, the solid than in previous years Lake water level is higher now. Normally at this time, the solid city lake level only 8 meters, and this year reached 9.34 meters, high water is also a factor in causing landslides cofferdam.

collective aphasia farmers suspected to have been sealed complaint
yesterday around 10:30, the reporter came to Nanjing Gaochun solid town, the same households were inundated with dozens of farmers met to do the scene,MBT Voi, however, inundated with dozens of families to meet farmers, these farmers have a collective aphasia, and some farmers said the collapse of hundreds of acres of fish ponds flooded cofferdam compensation matters, not the media paid attention to; also Some farmers feel very embarrassed, stammered that if the media find something bad about the compensation, who found no chance and so on.


yesterday afternoon, this reporter went to solid town government, said the deputy mayor Zhao Qifu, Shijia Han is a solid paint Lake tributaries of a river bridge culvert, built in the early 80s of last century, due to long years, has been leaking, the town in order to solve this problem,MBT Salama, decided to tear down the old culvert reconstruction. The project requires payment of about 80 million, after bidding, the three bidders, the final bid by the Gaochun County Water Team. Originally, the progress is good, however, met with rain the past few days, coupled with solid-City water level increased, causing flooding occurred cofferdam piping. He explained that the piping diameter of nearly 2 meters under the flood embankment ponds quickly rushed. It is estimated that over the water area of ​​ponds, nearly 200 acres, was nearly destroyed acres of fish ponds.
When a reporter questioned whether the city Hudi dam do solid engineering, related to life and property of people around, why the construction site without any works publicity card, hydraulic engineering team has not qualified to do the projects, The deputy mayor in charge, said the construction site without any works publicity card, because it is not vertical. The team is responsible for the construction of the County Water qualification is definitely yes, but the construction unit of town government is not proof of qualification, the town has only one record, and this kept the record of the comrades of yesterday afternoon, go out, and now can not get. Eventually, the local government did not provide reporters with the project construction materials.
how landslides in the end? In this regard,Jordan 4 篮球先锋报:乐福欲进全明星唯求教练开恩, the scene of the person, the past two days,MBT Sapatu Sandals, Gaochun has been rain, but rainfall is relatively large, leading to greater pressure cofferdam, eventually leading to a collapse, not only the original construction site completely submerged,MBT Barabara, and the water also rushed into the ponds behind the dams, resulting in many fish ponds suffered a loss.

muddy field, workers wearing rubber boots at work and can see inside cofferdam construction site has been flooded, the back of the venue and built a dam, and connected on both sides of the leap Fair ,MBT Tembea, on-site construction workers said, and so after the cofferdam completely solid, but also to restore the inside of the water out of the construction.
of: Lu Bin / Source: Nanjing Morning Post


Zhaoqi Fu said after the incident, the town government emergency organization for risk, the mobilization of excavators, rock plugging. After 3 hours of repair, the basic rule out the danger. Currently, fish farmers in the town has sent survey the damage, the town government will first assess the losses to farmers and paying, the number of fish ponds were washed away in the end, how much loss they are verified, and in accordance with the standards prescribed by the State Compensation farmers, and then held the responsibility of the construction team.
uvdwss4c is offline   Reply With Quote
 


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT. The time now is 12:34 PM.

 

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum