Quick Search


Tibetan singing bowl music,sound healing, remove negative energy.

528hz solfreggio music -  Attract Wealth and Abundance, Manifest Money and Increase Luck



 
Your forum announcement here!

  Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums > Other Methods of FREE Advertising > Manual Traffic Exchanges

Manual Traffic Exchanges This is a list of Manual traffic exchanges that you can use to get your site viewed by thousands of people a week. Manual traffic exchanges are better known for quality over the quantity you find with auto surfs. But both are great for generating traffic.

Reply
 
Thread Tools Search this Thread Display Modes
Old 07-26-2011, 02:22 PM   #1
SW6n8d6q2yf
 
Posts: n/a
Default Plan the afterward 2 weeks ( 2.4-1.13 )

First, the work
(a) several key
1, citizen issues, reporting scientific and technological achievements, innovation fund; long-term project in an application;
progress: years ago, has been submitted materials and additional allow off immediately open appraisal;
recent plan: to be completed this stage: good convergence with the able authorities to implement the Group account, session arrangements, open appraisal have to complete the necessitated material [including: reporting PPT and conference materials, pre-completing the certificate of authenticity, the drafting of specialist opinions] to arrange a allowance.
the next phase to follow up: at the end of registration and assertion of results of technological and technological completions of the materials; applying issues; Innovation Fund application in 2009; build up the patent application (already got two patents received notice); research public narratives (with SW technology interchange of workers); preparations to talk with YT-WSC letter of intent to subserve or LF-WSC took YTW business.

2, resource pilot (focus: Back to signing the memorandum)
pilot ceremony has been completed, follow-up years ago may be acceptance, , then re-implement the specific situation.

3 ,**** vegetation project (focus: Regulation Authority / coupler acceptance will)
years will have passed the Planning Board business, the Commission must follow the rules or the joint approval will be the circumstance;
a red line map,Asics Rotation 77, these drafts, and labor tin be laid Institute study, commissioned by the operation may: begin to obtain pre-Municipal Development and Reform project approval, and then commissioned the consulting center of the provincial Development and Reform Commission);
introductions watch Yang Dong Chen, intent on cooperation, signed the structure contract.

4, DYW project (follow-up converge King, Wu L, communicate with the situation, to reinforce knots with the chief)
initially: the mode of operation (completed), the project site (two program options) scale: 50Ha;
has a prefatory site map, but to be implemented,Asics Olympos, focusing on communication and follow-up results of Wang and L, if the introduction of NAN HAI YUANG immediate progress of the project partners, signed a letter of intent to promote the establishment of the tripartite project Working Group; preparation of materials for approval 1st make sure planning and site culling, to carry out possibility study, and to a certain degree of convergence of the project enterprise set up programs for treatment go and personal follow-up.

5,Asics For Women->, WZ extract bio-diesel project (to consult cooperation between Guangzhou and Dr. Xiang intention)
met with Dr. Xiang,Asics Mexico 66 Lauta, above letter of intent; study Longgang project implementation;
likely, the afterward tread to talk about specific cooperation intention to sign letter of intent / agreement (address: equity structure, capital,Discount Asics Shoes, technology, business model); design and implementation of the route (project readiness substances, to do PPT);
specific implementation and progress of the control (check the fashionable technology appraisal - reporting issues ... ...)

6, and ZENG'R br> (ii) the need to follow up
1, .
agreed along the chairman and Zhu Zhu namely responsible for adjoining Institute Quartet meeting (for New Year's ;
parties signed a cooperation letter of intent / memorandum;
parties signed a cooperation agreement
... ...
2, CIMC-YICT cooperation (10.10 three parties have been reached, CIMC has given Liu JL program, follow-up of extra than YICT feedback, vacant heap surge in demand, rewarding opportunities arise YICT own investment program of cooperation has not, merely there may be turning, and I preserve contact);

3, XG 25,000 to (pre-declaration completed in 2009, for recent messages can be formally comprised in the next year huge plans; incentive program has been reported to chairman, to impulse) (persist to pay attention to the newspaper message)

4, nano-hospital follow-up and cosmetics project cooperation agreement (be-depth debates with every other, to know its true intent).

Keywords: results of appraisal, pilot [behind to sign the memorandum], integrated wharf [cooperation concert], CIMC-YICT [i], XG2.5 [Tan], BH [Planning Commission / United Approval will,Asics Running Shoes, contract, project]

(c) the need to disburse attention
document for harvesting groups and stakeholders to core business systems, research DYW & CSPC.

two other
1, look at the new CIVI & M6, discipline (do not concern about the manner);
2,14 day school, there are plans to gather relevant information strategy for writing papers.
  Reply With Quote

Sponsored Links
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT. The time now is 10:29 AM.

 

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum