Quick Search


Tibetan singing bowl music,sound healing, remove negative energy.

528hz solfreggio music -  Attract Wealth and Abundance, Manifest Money and Increase Luck



 
Your forum announcement here!

  Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums > Other Methods of FREE Advertising > FFA's and FFA Blasters Directory

FFA's and FFA Blasters Directory FFA's are being used by internet marketers everyday. They are great for adding one or two more sign-ups per week to your free to join programs, and they only take minutes to use.

Reply
 
Thread Tools Search this Thread Display Modes
Old 08-26-2011, 01:07 AM   #1
H3066vhxe
 
Posts: n/a
Default 200 elaboration tips (we always see by , quite ser

1, the partition will not be the first shoe, leaving a little space so that shoes can leak into the bottom ash, sink and gas stove altitude mounted light. Given the location of the bathroom floor drain must first think well, a good amount of size. Drain the best side in the brick, the brick in the middle position if so, how to slope either brick, floor drain is not the lowest point.

2, bathroom, air-conditioning outlets were not designed to switch. Especially the bathroom water heater, a couple of level switch with a plug appropriate. To get cracking electric, pull the plug dangerous

3, sun angle on tile part of the treatment, in the final analysis is to look at worker level. If the level of good workers, plasterers, tile tools and wear better, they should not hesitate to choose the practice of grinding 45-degree angle. In effect, at all times a good grinding, grinding 45-degree approach angle of the sun angle is the most beautiful! If the level is indeed not very good worker, then you still choose to use affirmative angle of it, because the mill's bad practice not as good as 45-degree angle with the angle of the sun's effects.

4, line up the pipes after the water pressure test is also very important. Test, we must all be present, and the test for at fewest 30 minutes, conditions permitting, the best one hour. 10 kg oppression, without any decrement before the final test.

5, when the steel doors steel doors must be considered a good size frame protruding wall to advise the installer, making the final frame and had achieved the wall tiles are smooth, so not only pretty, and good health to do.

6, carpenter and mason's Door package is to tie the tiling, including door pocket of time to consider the retinue ground (the ground side of the door either side) is also tiled cement mortar or other thing, because if you paste porcelain Door Nail good before, has packages to the ground, with cement in the future, if cement and Door tainted, moldy water will cause wood Door

7, under the bed and bed board must be breathable. Bed board is generally best to use cedar board

8, do the paint as much as paper tape

9, buy a lamp to note: generally try to use glass, stainless steel, copper or wood (shelf), and generally do not buy any other wrapping iron plated, ah, ah what kind of paint, easily fade.

10, consist in ... ceramic basin basin, cup basin downright Health

11, water reform plan to be their own good, ask them to open the straight-line Cao. Watching them draw their own line, the whole line open by painting Cao. Each have their own acceptance Caixing.

12, water must be good, be sure to test the water!

13, a lot of construction in the verbal agreement into the gap checkout slaughtered, must be written in black and white, increase or decrease in prices of items are sure to ask, write it!

14, ground floor, if installed, to re-do all the ground re-smooth cement floor.

15, the kitchen door, or the decoration of wood to make wooden hanging rail doors for good.

16, the living room as much as possible to install the power plug.

17, is still to be done outside the shower toilet sections. Not trouble the easy way to pull a shower curtain, the actual inconvenience, water everywhere.

18, do door and door frame of the wood material to choose carefully the material.

19, before installing the cabinet must be sure your home's water is OKAY.

20, kitchen floor tiles will not pick white.


21, paying particular attention to the ceiling smooth putty before wiping Dulux

22, the number of living room lighting should not be too light, simple is better, or like the lighting shop!

23, to buy the things you need to install those peddlers will be required to install, it does not include installation, after installation, it must adhere completely to pay money! !

24, decoration, your formerly collected business cards contractors carry

25, Lvkou Ban protective film is best removed before installation.

26, the shoe is best to use shutter, anti-odor. You can leave a shoe outlet side, to plug roast shoes.

27, where the cooking can be a small security lights.

28, it is convenient restaurant exhaust fan can also be safe, so when you eat hot pot or do not dirty grill house hall ceiling.

29, the door is best placed to lay a debris of the cabinet, can be placed above the shoe. The common things, such as umbrellas, bags, scissors, coins, and so eat of the drugs in there, so it is convenient.
30, there is no need to use your ceiling, as not too anxious about humidity and cooking fumes, moisture-proof gypsum scrubbing brush is recommended to use waterproof paint, a passenger guard my house to do so, very beautiful. If you must use Lvkou Ban ceiling, it is recommended:
1, not too expensive.
2, using the web color, especially the kitchen ceiling, white on the good, and white unless color and decoration style of match, it will easily inconsistent.
3, his grasping idea, do not trust selling the vision of smallpox, their eyes Barbara soil.
4, staring at himself in the scene, while income is important, do not let them slack, or leave the black seam, how to look how ugly.

31, third day of the main hole and persist to paste tiles,Billige Nike Shox, range hood and vent water heaters to pre-lay, and if so then perforated tiles affixed good, is not convenient. Therefore, the decoration must be selected before the hood, stoves and water heaters, etc., to determine the hole size.

32, notwithstanding catching into list the custom-made cabinets see nice, but not durable, comprehensive online views and experiences of some students, the use of concrete apt do to counter the structure of inner and external sides of paste porcelain, cruel countertops, wall cabinets and counters wood gate alternatively chosen apt do. Out of the closet to do so durable, moisture-proof. And the cost is small. Many neighbors said looked good, I did not thump.

33, well after the Door, plasterers plaster line to start the installation, wall Pihui project. My family had relatively flat wall, agreed 2-3 road on it. Pihui acknowledged when a gray lustered once, and then paint brush after brushing but also polished, and eventually twice with ICI paint brush, the whole wall look flat and flat, really good. Upon completion of the ceiling wall, carpenter started wardrobe. The wardrobe is 18cm Albert card Daixinban do outside paste veneer, although there is no furniture store to buy so good-looking, but durable, quality should be better than buying. I am not scared of standing receptacle board. Buy probably will not work. Backplane is relatively thick, thin to buy that.

34, when other students in the tiling must note the following:
① best he can in the field.
② some of the fewer absolute tile can be attached to the future of some employees to watch the place, such as cabinets, sinks, mirrors behind, but also pay consideration to tile, brick, etc. Do not waist was accompanied to the on location of operators, or What you can not see the future, but likewise wasting money.
③ wall tiles, floor tiles in the paste before the torrent damage must be ample time.
④ Be sure to drain plug with something good out of cement down to prevent clogging. My family out because the cement floor drain is blocked, it took 30 management office to find clear, get up a lot of small muck.
⑤ at the scene, the workers will not be too wasted tiles. Tiling my family when not at the scene, then go, wasted a lot of brick, very melancholy, all perspiration Mimi Yeah.

35, a wall of long, high. Such as a bathroom with 4 walls, each wall should measure out its long, high. And then discount a skylight and door area. Finally, calculate the floor area. After you put a good amount of size, you can also obtain to sell tile sub shop, they will help you re-match. Plus 5 percent-losses on the line.

36, the best is a two bedroom ceiling light control, and a door, a bed, a bed of winter retention up and then turn off the lights.

37, the socket must be considered a good location, height, interval. Even first activity location having steel cassette, put away after a cassette is found equitable by TV cabinets, microwave, desk block, the first two had to move the location of furniture, high, and finally found not only ergonomic height, but can not be bought a good eligible stainless iron cabinet thighs, only customized aluminum feet.

38, just around the corner in the hallway like the one installed, that there are shine effect.

39, when mounted lights did not consider the nestle of the table, the table now is not in the navel of light.

40, bathroom tiles do not use too much pigment, one easily dirty, and secondly, a long time too blunt!


41, outlet to more equipment, furniture to buy outside the ground to be considered safe to dirt, kind of room to look, in principle, to cling to.

42, Lvkou Ban did not need to buy high-priced, very cheap Lvkou Ban the effect has been far better than PVC, the more money I can not see significantly different results. Buy Lvkouban particular attention to the keel and not Lvkou itself (Lvkou goal is not easy to tamper too much), usually on the keel complete ghost.

43, brick color is difficult to find satisfactory, I did not find, but the two kinds of color are not satisfied with staggered mosaic sub 45-degree angle I was able to achieve satisfactory results. This is indeed the bricklayer himself put forward good suggestions.

44, playing in the balcony on the top cabinet on the back of the cabinet, then a layer of foam board insulation with water works well. Balcony door is best to use the same type of fire board. Balcony environment is bad.

45, if no suitable molding may wish to order, custom-made quality also seems better than the sample. More personalized and customized.

46, bathroom floor cabinets with stainless steel legs are mammoth profits, the back of the store to find some place to buy cheap price crazy.

47, install the door lock head to pay attention to some wax, wax on and then crashing too late. If you do not smoke, then also pay attention to the door handle to prevent wall damage.

48, Paco floor well, I like only to remind the employer to talk directly to the price and the salesperson to talk about than the price better.

49, matte paint is high and the light beautiful

50, if the re-decoration will use putty instead of talc products.

51, installation and air leakage protection switch junction box of the project can not be provincial, but not on the outside to be on the interior, the original will want to save wages outside the old junction box used, electrical proposition put In the indoor ones, and now he found this proposal very valuable.

52, and atmosphere leakage protection alternate to use the mark appoint. I use the Want to buy the real entity is uncomplicated, straight phone check MGE headquarters phone number, and then played to query the local branch number.

53, Under Counter Basin Above Counter Basin than delicate, good, good clean. Basin faucet with the audience to pay attention to, taking into account the thickness of the basin edge, leading to the mouth longer.

54, without any revision of the wall angle is also very beautiful, but to find a painter in the advance stage and the painter apparently put forward. Ding Jiaoxian angle helps to play a straight line.

55, online slots before the cement surface of the putty surface treatment is important, for no solid surface with a clean ball treatment is very appropriate.

56, make plaster suitable for a large hole on the wall, of course, if the hole is too large or need to use cement.

57, frosted glass, not stained with the back of ten million to protect the paint, is difficult to clean!

58, Caipen leading back of the hand switch must be used, that must be not easy to keep clean fingers, the hands are turned up when the oil is also difficult.

59, the price of elegance automatic racks too much water, and found some of the more well-known brand is not on the structural design but better than the brands, prices are much lower.

60, could be considered safe on the ground of the metal socket, the socket 100 is very expensive, but very convenient, usually flush with the ground, feet a foot on the socket can pop up. Suitable for large living room. Or security in the dining room table underneath, to insert pot (to prevent hanging back and ahead when moving wires)


61, storage room. TX has been said, but I did not do doors, looks very beautiful, and easy to put dirty clothes cupboard.

62, beginning mattress border (the so shrieked it). I am a professional enterprise to buy the cloth mattress, bed, and spent 350 yuan and a such a thing, end of the bed there is a pluck handle, bed embark will turn up, exposing the bottom of the storage space, Terrific Oh!

63, is not practical double-pole towel rack! Current and single-pole uses the same basic look inside layer will not be hanging pole and then drying towel

64, that is not practical cabinet inside the trash can, as on the outside. There do not install the door and the table plate of the trash binary, open the door when the summer will be very smelly. Trash or on the outside good.

65, the table next to the small cabinet, and can be placed on some stuff, very convenient.

66, on I think the mop bucket less claiming in terms of extravaganza, can amass one yourself out, covered with tiles and match the surrounding environment or the mosaic that is beautiful, and save money.

67, the bathroom can hook nail point of nail to hang something.

68, designed a bathroom cupboard to put clothes, no longer must worry about bathing forgot to clean clothes.

69, underwent a caustic practical washing machine with dryer, in addition to a year, only the yellow mold-day, and the evil gigantic. Thick clothing, towels or drying quit, let the sun more than a good client disinfection. Even been overdrawn, you need to save the point of silver.
70, even in the laundry room to do a laundromat pool, used to hand wash something. Originally thought to use less, so buy a very cheap Terri chairman. Did not think this is really convenient laundromat pool, became my most frequently used a home washing area. What rag ah, socks, ah, to towels, ah, all in which to wash, even the most hands there too.

71, fitted with lights is not really practical, not the decoration finished now opened. There are just SHOW guests to look at lighting, I simply forgot their own also installed a this thing. When the original is to open PARTY under phantasmal, now do not have much chance of opening spotlights.

72, most fitting experience is actually as simple as possible, less pollution, less money, truce of mind.

73, useful stuff:
①-designed warehouse apartment.
② North Terrace used to wash dirt sink. Differences between the bathroom sink and kitchen sink washing dishes and vegetables.
③ bathroom to wash your cilia you can pull out the leader. (Wash basin was never the TX exceptions).
④ easy to clean the floor and the right cleaning tools.
⑤ kitchen go table lamps.

74, to buy their own toilet have to be a good value of pitch, or go buy a return that is really ... ...

75, posted WeiChu tiles after a good amount of what did not dry before the best level, the lowest point is not to look at the leak, or other dry and then passing the buck and decoration team, a lot of dead cells.

76, ledge stone with the Great Wall of beads Angeles, is a 800X800 tiles. Manufacturers cut good milling,Nike Shox Sko Norge, Mason posted. Pattern did not look good also
radiation.

77, bathroom shower room must be large enough size, and use transparent glass, so there does not seem cramped shower.

78, should not use white cement tiles pointing hook. No month into a black seam, ugly death. The results they have bought their own hook pointing agent, that tired

79, the cabinet should be under the artificial stone after the board of the pad, the result is not found after installation, are now afraid to cut the flesh in the above, promised to give me almost two months have not installed installed (only to grinding a).
80, do not believe the spell of the designer. Of course, you can visit more than several decoration companies, from each design to extract the real useful things, the key is you want to simulate to look like home promotion.


81, if the floor drain installed the incipient developers have the kind of injury smell of the

82, attached bathroom floor tiles behind a good test the water, if water is relatively slow now rework. Our household's water is relatively slow, then relented a morsel, now it is always a little bath water, and made hundreds of our cardinal Guardian silver shower pate is idle, it forever surprising how to treat.

83, fitted wash basin and mirror to be considered good, put brush cup rack, towel rack relative position.

84, to consider when buying a mirror the mirror front lamps, if you do not want to install a temporary mirror front lamps, mirrors the size of the mirror to be able to cover for the best line of headlights kept.

85, put the washing on the balcony to be a small cupboard, easy to put some debris, such as washing abrasive within the debris. Both beautiful and practical

86, must be looking at doing upstairs upstairs dripping water .... otherwise, get a hanging cabinet, the wall is a muff ....

87, do not blindly follow the buy online, I later discovered that some of their own to buy cheaper than the bargain.

88, TV wall must set a few more outlets, TV, DVD .... a put, you will find enough channels.

89, change the water well in the future to be considered before the installation of a large example of wash basin, for instance, the left or right pots pots, water and drainage that is located where. Otherwise, changing for the better after the discovery period of the wash basin is fit!

90, on the curtains, we had better put your stay a size goes, the boss shows no less size. If less, then how come the. Or saw him cut his cloth.

91, the decoration of the construction process:
(1) approach, tearing down walls, walls.
(2) bathroom, kitchen floor to do 24 hours off water tests (required the developer to complete this task).
(3) slitting trough, water reform and approval.
(4) stamp groove secret underground water renovation project, closed water leak test started without waterproofing.
(5) bathroom, kitchen wall attached disk.
(6) Woodworking approximate, suspended domes, plaster moldings.
(7) packages Door, window cover. Making wooden cabinet frame.
(8) concurrent creation of wooden doors, door style and platen.
(9) wooden panel paint brush dust (edible vegetable oil).
(10) window leveling laying marble countertops.
(11) neat panel, pasted, fine line production and installation.
(12) wall of basic treatment, grinding, leveling.
(13) utensils, door seams paste adhesive (defended side).
(14) ICI at least three times the oil the wall.
(15) furniture painting approach, eye patch and paint.
(16) dealing with edges, arranging floor tiles, wood or composite wood flooring, waterproof marble bar, the baseboard.
(17) lighting, sanitary ware, handle, door lock installation.
(18) cleaning health, tiles fill joints, dismantling.
(19) decoration preliminary acceptance within the company.
(20) three formal acceptance of assignation, distribution owners.

92, the valve back together before the flue must be clean to assure the valve can switch freely and competent to open to the highest, otherwise it will affect the effect of smoke hood. Ceiling can be installed to remain two not installed, so the hood and attempt and correct installation of the ceiling and then installed.

93, so much in the living room and dining room ceiling can not do not do.

94, take the line in order to better air-conditioned spaces, the power as much as possible closer to the air, so air-conditioned to see a length of cable, leaving a track of rue.

95, the house in person to measure and log the assorted sizes available, can be Broche size chart size and then re-covered wire marked the final size will directly affect the decoration and furniture purchases.

96, the small size of line is not good if the referendum is not always dark walnut atmosphere, then the need for trade-offs, or to accommodate actual or dedicated their own motifs, of course, the best do both

97, began looking for decorators. In terms of private experience, if not especially massive household and plan to simple decoration, the guerrillas appear to find something more cost-effective. After installation it is best to introduce others, you have peruse and admit to the eyes, especially the feeling of the human in dictate of the decoration is even more important, responsibility and gratitude of how, some of the sometime is more critical, because if only a stripped-down, in fact, those who live almost cheating the will to do, but the quality is good or bad may rely on a sense of duty.

98, the main furniture such as sofas, closets, dining tables, chairs, cabinets, etc. in advance to see more of the best also, if the escaping approximately on exhausted, you can detect a few good large-scale home shopping plaza shopping, the basic trend to see it, so then you have to do is slowly along to their lusted style filter out the right things. Some folk take a good neatness, some people have exactly grab of color, it does not material, anyway, there is period to consider, if you await until removed decoration, furniture, help ambitioned to see the steps and then reluctantly accepted the inevitable end will not really like it.

99, already optimistic about the best furniture to size down, and then to the room's decoration of the virtual future.

100, buy someone required documents be sure to keep the move aboard the latter may exist back, a replacement is absolutely useful. In particular, some major items of the cache receipts, brochures, etc., because a lot of asset have a warranty phase, certify lost would be extra trouble.


101, the process of construction projects are sure to amplify or reduce the price they asked for and then jot it in black and white.

102, check for the necessary construction of protective measures, such as entrance doors to use jewelry cotton wrap, window and floor tiling good must be properly protected.

103, as much as possible to communicate with construction workers, to determine whether he understands your purposes. Put themselves in respect of every teacher's work, esteem, the importance of people feel at home, then began to live it more responsible to do so? There is an old saying not to ask (But if you are faced with treacherous cunning bully who, it would have to retaliate, argue) in particular to some of the edge of the project is the need for several types of co-ordination, responsible workers with each other and coordinate their relative duties, Otherwise, we pass the buck back and forth, all pass the buck. I like Mason to help me solve some of the carpentry of things, and electrical and solve some of Mason's problems. Because each teacher's experience is different, at all times he is willing to help you find a way.

104, do not do the best furniture nailed, because it no longer may be some changes in the layout. If we do we must grasp the quality, or endless troubles.

105, be sure to change the water carefully, one costs money; second, if necessary the ceiling from the floor must be laid down in water, if water problems big trouble.

106, according to their actual needs and reasonable preparations for wiring, so as not to waste (especially the napkin with a lot of lights and lighting if necessary practical, we must also try to avoid the catena to use, waste electricity), but some places can not be Province, case in point, next to the bathroom mirror, and often with a hairdryer and razor; well inside or below if the shoe has a socket is also good, shoe appliance can bake, I am now very apologetic that no cloth lines.

107, the bathroom as wet and dry area, if the area is small with a base like (special glass basin was dirty, lazy caution); conditionally set a waterproof cabinet incorporating a small debris is best, put anything naturally does not look good on the outside.

108, wood glossy white paint brush than when the nitro-polyester good (this is to listen to seasoned painters talk).

109, the cabinet must be elected carefully, to look by several of the quality, we go to do a solid muscular as this 1 are easily thousands of ocean, but also related to the stove and sink, etc., they still do not blindly greedy cheap good. But best not to do in the cabinet table or inside the trash can; if there is limited funding, basket, basket seasoning, rice pail of what you can do all of these accessories in the cabinets sell the company in general is very expensive.

110, wardrobe preferably than not less, rather large not small, women remember! Hanging space to be able to put up the clothes.

111, bad handling glass or mirrors in the vicinity of the best things to buy, or Be ready to transport methods.

112, curtains all the best in furniture, utensils and then customized approach to match the overall style intonation. However, before cleaning the track can be installed.

113, change the gas pipe is best done before tiling, or may damage the wall. Best to let the gas company to paint a graph or on the wall as an arrow, because the cabinet company to be necessary in the cabinet body openings.
114, cabinet installatiin time is longer, ranging from 4 to 5 hours, as many as 2 days, must be psychologically ready. Installation can be used to check whether the material is that you set (you can see via the hinge hole cabinet material). Installing kitchen cabinets before the first clean look, because once installed cabinets, no way those dead ends and then cleaned.

115, furniture installation is best looked at in the next, especially as the wardrobe of the laminates are several holes selected, I was not looking at the results too small a distance between the layers, hanging clothes extend not open, even after correction.

116, taking into account the formaldehyde pollution of the environment, such as spider plants can be placed in the green room, furniture in always the open doors the eruption of savour, but also buy a special spray to eliminate the smell of things to come.

117, installation of combustible gas, booking gas ignition.

118, brush wood of the time: the best Puwan other room painted tile or wood floors. If you must brush it, the best have the room cleaned. No floor tile or wood floor room, the room a lot of dust, then brush wood, then brush off the dust easily attached to the wood surface, wood products, have spiked sense does it feel, which although can be higher name of sandpaper and then brush it again to solve, but in the end it feels to feel the brush and the overall effect will be deducted RBI hit. Room Puwan tiles and then brush, then the air of dust content much less than the shop front, with hardly no brush again after the dust attached to the wood surface of wood products. This is so because when they run into a small decoration Wu case, I had decided to buy in Canada Wood had seen it like a brush effect, and feel very smooth, feels like my home-improvement Howley, like wooden doors. Only because of the above, the results of the effect to play a lot of discounts, it has been a matter of regret Xiao Wu. And plus I like the union buy the paint process, the students also seemed in this home. So here remind students to pay attention to it. I do not know whether other wood case, but according to the principle of same reason, so here remind students to pay attention to it.

119, on up painting: painting educator pay is so dry and then batch finished wall putty, putty dry after painting. After brushing the draw if no cause is necessary to install lighting and a variety of electrical switches. Ask something to install lighting and electrical switches to remind the teachers to pay attention to this and installed a clean Sin before hand, so that when installed will not be a dirty wall. Thus saving a touch-up painting processes the. Of course, soiled walls, the decoration is to make sure the paint department crew to pay up painting another, that is to get clean and nasty walls (if the paint companies, they also grant teachers to pay to make paint, If you pay attention to what a lot of paint division will be left in the part after brushing the wall paint, which is the remaining part of the paint used to make paint). Just note, do not let install lighting division to pay smeared walls, you can pay less to make a trip to the paint division (at least half a daytime), but also facilitate a lot of our own, then why not? Sometimes, with people easily, also has been easy. In general, paint the walls will be wood finish brushing before, this is to shirk the Wood in the process of dry brush will paint the walls of the wall impact. Of course, in substantial action, you can also Puwan after tile (floor tile wall putty prior permission has been good) painted wood, and other dry before whitewashing wood finish, but to do so, of course, will influence the duration. If the alarm of affecting the duration of the circumstance, but also in the air to minimize the effects of dust, then a lot of points to be hard-working about cleaning the room of the health of the.

120, the decoration team selection: The first alternative guerrillas or formal company, I think is not important, the key is to give you the head of the construction team is serious and responsible, the decoration of the capabilities of workers, of course, the quality of the decoration and prices.
First, find the decoration companies not more than four, for the most part, so, if your time is very rich, it is dissimilar matter. And decoration companies to talk about this before, must be clear that you must do renovation projects, you can call the company reported that all the decoration items, compare prices and comprehensive after taking into account the following factors to judge which items you want to outsource Which item of decoration companies do.
the decoration of the people, the decoration of the offer as low as possible, of course, inverse to the views of decoration company. Sometimes the decoration company to Mohr-McClune, will offer some of the weight is relatively low, this way, the quality of the projects and the quality of materials is more difficult to certify. Fitting so many, you want to single item is the lowest, it is unrealistic. And decoration of the offer, not only the number but also depends on the contents inside, the materials used in this project, descriptions, brands and so on. You know, the decoration of each offer, in fact, are of great stress.


121, the construction? Since I am in no hurry to move in, so plan to find accidental workers: the neighbors a good home please artisan, may be I look for the object: a mason, a carpenter, a plumber, a painter. Design step by step step by step, I believe it slowly and deliberately.

122, to use every cent wisely: look at the decoration materials, they must be dazzled look, there are so many good things, and it seems every one looks the same, the economy can resist . May be a short period of time necessary to purchase these things in place, the economy pressure is really big. Most people at this time is often in muss, the result too much over budget the last one, the second is to buy good quality stuff at the United States, then buy something is irregular.
My view is:
one pre-determined price, after the election materials.
excess of the anticipated price of 10 percent-of material goods, do not waste time. Business buyers always fine too. I am doing a detailed timetable of materials needed in the future blog post will be posted for your reference.
Second, province to province, the spent flowers.
the maximum expensive place is carpentry, pantry cabinets.
most prone to water quality problem areas are transformed, kitchen water.

123, the cost of furniture than to buy some furniture. 500-700 yuan per square meter general furniture.

124, covert project was not the most important place to save money: water circuit transformation, water treatment.
course to do is to ask B & Q, B & Q now have individual decoration services: such as water reform, since the purchase of materials, water per meter of $ 40 per measure perimeter is $ 20 for half a year warranty. B & Q on the premier floor in the east of the careful individual services and offer bulletin, we do reference

125,, the easiest way is to use online resources to collect, retain, achievement the integration, the future will be put to great use.

126, in order to save time, enhance efficiency, decoration materials on the market each have a crop, a detailed and practical procurement schedule and budget is important.
Program list by room category purchase is easier to implement: each took to the streets to see things the same room, to facilitate comparison and comprehensive
attach, probable to have success.
one hall project
Second, the living room project
Third, the canteen project
four master bedroom project
five children
six housing projects, study projects
seven main Health Project
eight, nine traveler Health Project
kitchen project
ten, balcony engineering
XI Yin Taiwan project
are listed in the plan to put my own post favor the emulating table, because reference: data in the chart as an sample.
This list is more convenient for procurement planning, pre-construction projects may be appropriate, by job re-classification of the merger, into masonry, carpentry, electricity, water, paint and other re-watch. The right side of the table can also be joined in the If (three batches of three wall paint brush; shoe with Albert plate, brush polyurethane varnish), etc.

127, home cinema rear speakers, the sound to be embedded wires in the living room below, this is very important!

128, add a sink on the balcony, decorated to embedded pipes. Balcony sink is very important, gardening, washing hands.

129, toilet, kitchen need backdrop melody, sound audio wires embedded before the renovation.

130, both sides must be left socket on the terrace, hanging lanterns, when the New Year, good power.


1: the bathroom is divided into wet and dry area 2 wet areas of the floor drain on the better
2: If you burn normal gas water heater attention to the bathroom to have ample ventilation settings
3 - 4: If you do not know, then you can ask a professional friend to accompany the master now lie more.
11: hydropower, or find professionals to help themselves because the functions in this respect he is to inform those who design their own needs to be transformed in the transformation of migration, but if there are problems when the house until you have installed the
line problems and must re-do the demolition of the wall is a very big head thing.
12: toilet water to depend on their choice to tile bathroom floor tile is a professional waterproofing has to do this at time of purchase, but you can rest assured water to do well because of design problems in the choice of size If you encounter after the designers got the idea he would not cut off the bricks to fill the ground so that you demolished the original design of good waterproofing, floor tiles, floor tiles are of course so early you can find out, but not your home is to live for decades we need a long-term guarantee so you must pay attention to the design of the bricks in the sidewalk without creature destroyed
19 when the combination is now bought ready-made cabinets are the most direct is because the family The water issues absence to be near to build the devise, of course designers in appending to water designed to inform the designer must determine their own homes who are constantly under the kitchen cabinet so to better decide the scale so that when you cook at home more comfortable with the cabinet plate recommended to choose such a large load to bear secure



white cement tile grouts and method is not the same, but the masons are usually filled with white cement tile grout filling usage, so era, gone sealant, sealant, and a little bit better to be pointing to the wall instead of doing the paste. Also, the cabinet hinge, pool water, so use a good switch, while the cabinet fabrics, pond compartment body, bolt can be used in general, of course, if you will not care almost the money.
If not a huge package, I recommend to purchase establishing substances for many as possible to homes in the East, was home, B & Q and other locations to buy tin be returned.
131, at the entrance to the light switch, it is recommended to use sensor-based. Black day to go home, save the dark.


132, shows a basic construction, water, electricity transformation
(a) the construction team on the water before entering the construction of a minute test, before they are allowed to change tubes.) and can knock down the plaster layer, load-bearing walls for installation on the
(c) in the buried line pipe Such as the need to change the original line, and can not use
(d) circuit to be buried in the dark wall of the best
(e) strong electric
(f)



133, waterproof
(a) kitchen, Wei
(b) 30 cm from the wall to do it double,Nike Shox NZ, more than 30 cm can do it again, wrap need water at the door pocket door.
(c) waterproof finish to be dry, a Redo waterproof membrane. Where leakage is most threaten to


134, tile
(a) in the selection of tile owners of tile required for quality finds its way: first look at its color is uniform, non-variegated black blots and holes the line; followed depends on whether the standard of its size, the amount of tiles with the tape measure the length and width, measure the size of the trademarks to its factory the same size, then the amount of its diagonal tile, such as diagonal line, the tile is positive; then depends on the flatness of the tile, the most simple and efficient method is to tile the same brand of two overlapping positive and negative, such as two stacked meaningful gap between the tiles or you can rotate the tiles uneven; last look There is no color tiles, and is out a few samples of the same type of tile, compared in the light, such as do not see color differences can be ordered.
(b) After the paste can not have a whole chip of brick tile hollowing (prejudiced hollowing the entire chip of brick can not surpass 20 percent), if the plenary piece of brick hollowing be rectified, under normal circumstances, posted 100 per brick, brick wall tiles are allowed to have a hollowing, to allow two brick tile is hollowing, but must rework, rework the main material (already counted in the loss of) from them, such as Over this range, the main material from the construction side is responsible.
(c) Normally, the level of tile degree of error of 2 mm is allowed, the breach be the same tiles, bricks and tiles should be flat on the corner (allowed error of 0.5 mm), kitchen, wall tiles in addition to health bricks and tiles should be flat on the corner, the need to level degrees (allow 1 mm tolerance) and vertical (allowing 2 mm error) to achieve, bathroom, balcony to the floor drain tile should be considered, you must first put away the slope, if there is no special reasons, there is water.
(d) in the wall and floor tile Puwan required after the


135, anti-termite
(a) and finish the wall after garbage accumulation trough, a comprehensive anti-termite (ie, whole-house spraying of termite drugs)
(b ) After entering all the plates in need of anti-termite treatment (specifically for anti-termite wood like to do)
(c) before the need to shop for wood flooring wood floor to shop floor to do a termite treatment
(d) termites spray to wet the pill is better (you can clearly see the wet)


136, the computer is also a design study, and now the computer has multiple functions to set the decimal point, making computing time will have different standards, so we need to send a calculator yourself, there are now calculated on a cell phone functions, but function is not necessarily good.


137, to arrange their own two good neutral glass, plastic (1 clear, 1 white), recommended the U.S. General Electric Company, B & Q for sale, 49 a. In the installed bath room, sink, cabinets, security doors when they need it. While the general plant installation package will come with glass, plastic, glass plastic, but most of them poor quality, the future is easy to change color or moldy.


138, if necessary a last resort, do not use lavatory seat shifter. This material is very threaten to cause clogging toilet bowl water.


139, kitchen Lvkou Ban, hood top two, a good hole must be completely installed so hood up after security. An up my family's early and later time and remove the hood to install, disassemble dismantling equipment, workers are busy in out of fashion, has become a seamless ceiling ceiling of the seam.


140, if in mandate to unify charm, kitchen and bathroom doors are installed, and that presently after installed in the door apparent with ground glass joints where paste. I do not have time for the processing, water workers are not cautious, a lot of water splashed on the floor bleeding to the door frame, the following part of it has little black (mold) of the.


141, must be tiled balcony! King balcony to angle around to shop, shop to live with the railing to the balcony with the high. My family view balcony to balcony wall angle and the life is not paved, but to prepare a bucket of appearance wall, they sometimes refresh ... ...


142, sealed in the wall before the water reform must allow the master to cater detailed decoration water chart.


143, as if ready to brush the wall color, the transformation in the power line when necessary to take into account for the problem. Changed a lot of my family line, air-conditioning outlet bit all changed. But in order to save money, not for the whole line, but wiring. This wiring must be installed where the whiteboard for future maintenance. Later, brushing the wall paint color, etc. only to find how these white glare, regret ah ~~~~~


144, which is the lowest class I made an misdeed, I suppose that the 1.5 m bed width is 1.5 meters, forget the thickness of the bed there. Very accurately in bedside lamps to reside well back of the wall socket. As a result, there is no socket to be blocking the way to use.


145, started before the captain to make analysis of the wall decoration how to deal with the need to spade out all the original powder. In particular, ready to paint the wall engineering companies outsourcing to students. My family is narrow-minded out to paint companies, such as carpentry finished painting the walls look gray to know the original is bad, it is best to spade out the whole re-Pihui. However, woodworking has been done,Nike Shox Dreams, to shovel the ash out of the original bad operation. Finally had to brush the surface of a layer of glue Pihui 108.


146, increase the line will certainly be re-wiring. But from the nearest terminus branch wiring. The increase is not allowed in the original wire connector on the wiring.


147, air-conditioning control switch only in the power supply side. Added line on the road is not allowed.


148, change the location of phone and network lines, they can out of the original fabric of the line to continue to use. However, if the unfit construction there will be many hidden perils. So it is best to box from the room for weak lines.


149, the transformation of the workload measurement circuit, generally in accordance with the wiring in three another ways were measured.
(1) play slot pipe (measured by the width of trunking, if a tank more basis canal, according to the number one half pipe the other half embodied in the overhead line).
(2) overhead line (wearing tube not play slots), calculated according to the length of pipe.
(3) for cable, according to how much even if the number of replaced (replaced the line to differentiate the construction team do not throw).
(4) languid transformation, according to the first method. The difference is who is to pay attention to weak-line purchase. Owners will must buy less wire prices.


150, firm the toilet to the floor, hit the screw with it? There is convergence at the pedestal and the pipe, to buy what were sealed and the outside is better: the toilet is fixed with the expansion screw. The interface between the base and the pipe at the inside with a special sealant toilet. + Out of white plastic with white cement slurry deployment. When the toilet is generally purchased with a special sealant.



151, buy the materials themselves must first calculate the approach amount. To buy water when the material to do the latter anyway, cerebral about painting with the sea draft in the end how much material came out, so what little confidence the boss, the result was found to buy water 5 meters, the actual use 27 copper head one, actually bought a 40, should the remaining 13, seven short of the actual remaining six. Under reiterated questioning from other sites back up foreman Detailed calculations of the pre-circuit their own material, the calculated results and after comparing the foreman of the requirements: from 30 m to 12 cable meters, network cable from 20 m to 13 m, other issues such as insulating tape, plug both large way was I correct ... ...


152, if the old water pipes under the ground, in addition to the drip when the switch is often damaged, do not hesitate to be laying a new, do not save, to ensure safety .


153, the kind of retraction on the bathroom walls, the mitten do not waste space, and posted a very good very nice tile. Of course, tile alignment that trouble to say


154, sun angle tile lines do not use the earnings side, 45-degree angle to grind bricklayer splicing was beautiful, of course, you do not select Tijuana workers lazy way to do things.


155, aluminum pipe, when installed must be sealed cement workers under the supervision of the construction standards to allow expansion space for hot water pipes. Short plastic tube not closed strong, and loose some of the good thing.


156, hall bathroom on the ground if the percentage is high, the conversion can be used to solve the door stone.


157, plus move the sewer pipe mouth, then in the new and old sewer pipes should be checked before the entrance of the old sewer butt is smooth, this time a lot of money to clear the bit to avoid future trouble.


158, Lvkou Ban did not need to buy high-priced, very cheap Lvkou Ban the effect has been distant better than PVC, the more money I can not see significantly different results .


159, buy Lvkou Ban particular attention to the keel and not Lvkou itself (Lvkou goal is not simple to meddle too much), commonly on the keel complete ghost.


160, brick color is difficult to find satisfactory, I did not find, but the two kinds of color are not satisfied with staggered mosaic sub 45-degree angle I was able to achieve satisfactory results. This is indeed the bricklayer himself put along good suggestions.



161, under the supervision of the ground water repellent to use my bricklayer but not directly in accordance with requirements of throwing on the ground, it can even do! It is not the best yourself, do not perturb but assured.


162, the incline of the bathroom floor before tiling to consider the good, the slope is not in agreement with national standard to achieve the effect of rapid drainage, and if you use a deodorant or a svelte floor drain floor drain will be greatly increased drainage problems. Some people say that steep slope and pretty, I muse it is nonsense. On the contrary larger slope water to speedily run a clean is a very reanimating thing.


163, platinum-point doors fire with the LG panel, the effect is good, but if we might consider fitting tailor-made finished door. Hand-made door is not fine, for reference only.


164, sink a large market brand-name price is not cheap, brand-name quality mad bad.


165, the balcony door is best to use the same type of fire board. Balcony environment is bad.


166, bathroom vanities to do when the first cabinet to consider the size of the basin so that the future good fit.


167, the glass is cumbersome stuff, the best buy in the vicinity, or Be ready to transport methods.


168, install the lock bolt head to pay attention to some wax, wax on and then crashing also late. If you do not smoke, then also pay attention to the door deal to prevent wall break.


169, matte paint is pretty high and light, do not listen to the painter, and if a bad brush matte painter said that its technology must be bad. Similarly, if a good painter, said polyester polyurethane is not fool your


170, with insulating tape and raw materials do not buy in the store, large supermarket quality was many better, and full heaviness, conversion down the amount is not expensive.



171, if the re-decoration will be used instead of talc putty finished, no big reason is that finished product easy to use putty. Fired the painter, especially after his own experience when diy - talc tone putty sick of it.


172, installation and air leakage protection switch coalition box of the project can not be provincial, but not on the outside to be on the inner, the original will want to save wages appearance the old coalition box use, recommendations on the interior to get a new electrician, he now found it very invaluable suggestions. On the internal door is not hideous, it really easy to use!


173, large interior design company directly to workers on site clearance work package may be more suitable,Nike Shox Nettbutikk, and better technology, tools, more


174, and air leakage protection switch to use the brand name. I use the Want to buy the real thing is simple, direct phone check MGE headquarters phone number, and then played to ask the local branch number.


175, the audience delicate pots pots than on stage, agreeable, good cleaning.


176, basin faucet with the audience to pay attention to, taking into account the thickness of the basin edge, leadership to the mouth longer.


177, the hole before installing the toilet is a big, large floor drain cover can fall off, if your floor drain has been installed and the toilet is not installed, do pay attention to the floor drain cover, or the floor drain cover it up somewhere custody 也好.


178, buy silicone, then the perfect best all imports of GE, GE followed by Shanghai packaging. Of course, if the kind of place in a very important element 7,8 can also be used, case in point, aluminum window frames with internal Anjiu levels of silica consume to plug the whole. But use the bathroom all the GE silicone kitchen, amount for money!


179, triangle valve should not be neglected, and save much money, if the valve, then triangle, triangle valve can be installed in advance of copper joints are not dripping, if I were you installed, only the last copper fittings installed on the faucet to take over the baby when it was installed to check whether the internal leakage, the absolute leakage due to pressure some time to test out the final installation of internal and leading it more secure.


180, even the diary has been renewed to do about those things, their own can do it, do not, but also with the idea, amuse decoration companies to communicate more with the designer, please construction team to communicate more with the workers, because the comprehension of your ideas, to rely on them.




181, fitting the biggest problem is communication!


182, is not the place, type of kitchen cabinet door designed, BH. Should be designed L-shaped.


183, general decoration, decoration companies, excluding the prim treatment fares, taxes, fares accounted for 75-80 percentage sign materials, wages account for 20-25 percent sign.


184, in the kitchen to go outside the ground water, since home improvement is to give a time bombard, who state clearly whether Shashi Hou for his trouble.


185, if the separate tube dress, but in a tank, the impact it? Effects can endure


186, ask what between the dining and living room separated by the most cost-effective package door pockets, side bag merely 6 cm or polluted with pearly, height 2 m is not significantly large High crude.


187, respectively, to strong and weak electrical transportation pipe, can be separated away the best, keep the distance 10 cm or more, but it can be difficult, because most families to save money and open a slot. Weak sound the same line can perforate the tube.


188, inside furniture, paint and paste board can do a good job and opened the door and ventilation doors and windows at home, only to non-pungent odor. In fact, you are using a good wood essence board,Nike Shox R3-R4 Combination, do not handle with furniture inside.


189, PCT board and the cabinet can be wood core board 15, the back of the five accessible folders, Wuli. Package doors and Tizi use nine per penny. Different processes with different materials.


190, PPR pipe not only for cold water pipes, also applies to hot water pipes, and even clean drinking water pipeline. PPR pipe interface with hot-melt technology, are completely integrated into the tube together, so once installed pressure test, no leakage. PPR pipe and will not scale. PPR pipe scale never known, not rust, never leaks, high water of green materials.


191, paint board is good, the advantages of both wood and composite.


192, do not print for a long time on the rainy synthetic stone, unless you want to dry a printing table; not take long rainy cutting board on the table. Wood wet periodically fade; rub the stain with a steel pellet, like hand squeeze pimples.


193, can use an ordinary gas meter cupboard door sealed in it? Need to use the shutter-type door it? Regularly check the air beginning on the line.


194, clear contracting the tx Please note that you must validate the renovation team to open a list of materials. There may be certain about their estimates, I too believe that they, and the results to buy wire and cable management almost doubled.


195, the size of definite intended sanitary ware, the best sketch in advance, reckon the size.


196, buy the production the students pay attention to the door, if you want to chase results matching panel with a business package Door, then you may have to be Henzai sword it!


197, Re: installation of water pipes before they take the leading and basin, sink have bought?
not, just determine where is the basin faucet, bathtub faucet, washing machine what's on the line leading, leading 99 percent sign and fell into the water are in line with international norms, at a time workers are not careless, all right. If you own basin cabinet, basin bought in advance, or optimistic about the size. Determine the amount of elements in front of the sink a good size, front loading station to buy Haojiu Xing, do not forget the audience or on stage. Distance between hot and chilly water pipes with cement tiles must be sealed before the 15 cm accuracy, and must be collateral. If you have bought, it is best put something, such as sealed after the unpack.


198, whether one 8-core cord in the meantime take the phone and web, will not interfere with each other it? Not. 1,2,3,6 kick the cord module, 4, 5 playing on the phone module, and the other two easily. Right in saying namely my experience: 10M 1236 100M to be accustomed with the truth that the speed to 10/100M that we will not feel anyone inconsistency if using a 8pin line, then some program-controlled switches whistle will cause the network whistle interference in the home surroundings generally will not have any problem. But recess insured that I can suggest such a separate route to the future, quit margin, cord is very low you say?


199, check the distribution box must be properly installed.


200, fitted bath and shower faucet lesson taps joined to the tube is embedded in the wall, I have repeatedly told them to get accurate measurements, do not install when the time is not on. The results left the hot and cold water spacing is 15 cm, can be hot and cold water pipes are not parallel, the results of the water feeding the electrical charge of the coerce was the placement. Yesterday I found that fb GROHE thermostatic mixer coating even be forced cracked. We can be installed if the leader, the first installed it. Should be the first leader to buy back, and then install hot and cold water, tiled bar. Oujia bought a very early lead, is Oujia master to buy.
  Reply With Quote
Old 08-26-2011, 01:39 AM   #2
obg72dhe8z
Commander In Chief
 
Join Date: Aug 2010
Posts: 1,870
obg72dhe8z is on a distinguished road
Default

,エアマックス2011
obg72dhe8z is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT. The time now is 06:41 AM.

 

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum