Quick Search


Tibetan singing bowl music,sound healing, remove negative energy.

528hz solfreggio music -  Attract Wealth and Abundance, Manifest Money and Increase Luck



 
Your forum announcement here!

  Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums > Other Methods of FREE Advertising > Auto Surf Traffic Exchanges

Auto Surf Traffic Exchanges This is a list of Auto Surf sites where you can get your site viewed by thousands of people a day. These are not Paid-to-Surf sites, those are listed in the classified's section. These are for traffic building only.

Reply
 
Thread Tools Search this Thread Display Modes
Old 08-05-2011, 02:33 AM   #1
ynmfghna1
 
Posts: n/a
Default herve leger dresses 36_4200

First, small hydropower experts Zhouqu undocumented launched denounced "to life" today "economic half-hour" will continue to focus on water dilemma. Illegal construction of hydropower stations, such cases are not uncommon, but recently we received a clue columns, large debris flow that occurred just a year Zhouqu many hydropower stations under construction, neither of these hydropower EIA approval, nor do the audit of geological disasters. Our correspondent also rushed to the Institute of Geology, China Earthquake Administration, asking the station to the experts of the geological structure may be Zhouqu what kind of impact. August 8, 2010, Gansu Zhouqu large debris flow occurred, the disaster caused 1471 deaths, 294 missing and 2,500 injured. Central and Gansu Province invested 5.02 billion for Zhouqu disaster reconstruction, restoration ecology. Institute of Geology, China Earthquake Administration, geological research scientists, geologists learned Xu Road, Zhouqu landslides cause 41 under construction, the total hydropower project has been built area of ??322.83 square kilometers of surface disturbance, cubic meters of spoil up to 3834.8 miles, and these projects spoil not only undermines the stability of the mountain river, huge rocks and easily form in the narrow river "natural dam" caused lake. Xu Road, geologists, successfully predicted the earthquake in Japan. Sun Wenpeng told reporters, southwest, northwest of the mountain is not a bag of soil, is a cliff, cut deep cliffs, is itself unstable, coupled with the geological rock up the hill is not the same, the angle is not the same, because a bubble of water, loose Wow, suddenly the rock down. Had eight two-year-old geologist to find a chance that last years Gansu Zhouqu large debris flows, is launched to accelerate hydropower project, hydropower project approval of the county has 68, and where Zhouqu the Bailongjiang River, hydropower projects have more than 1000, two geologists worried about this. Xu Road, said they did not oppose Shui Dianzhan general geological structure and the main opposition activity, terrain is very complex, this region may cause a great disaster. In his view, the abrupt changes in terrain and contrast, and weather conditions, including Bailongjiang River to the west, including the rich hydropower resources. But it is precisely because the crustal structure and geological structure is very unstable, hydropower development is also accompanied by high mud-rock flow triggered geological disasters. This view has been a research scientist with the Geological Sun Wenpeng support. Sun Wenpeng also said that it also build hydropower stations, water and electricity may know why mess like this. Sun Wenpeng told reporters at a hydroelectric become like this, he replied simply angry to life, is simply too risky. These experts worry that the old is exaggerated? Our correspondent also immediately rushed to the boat song, to learn about the geological structure of these hydropower stations to Zhouqu impact. As the largest river in the upper reaches of the Jialing River, about 600 km Bailongjiang by Ruoergai Sichuan, Gansu Diebu Zhouqu, Dangchang, Kang, County and other counties, the flow of twists and turns all the way to Sichuan from Sichuan Zhaohua County into the Jialing River. It is located in Sichuan and Gansu Diebu Ruoergai junction Bailongjiang, crystal clear river, like a green ribbon, flowing on the plateau. Diebu into the territory of Gansu, the mountain has become precarious, and sides Linmusensen, blotting out the sun. River flowing from the canyon, like a dragon-like head, but not the end. Reporters along the line, across the Diebu the city, the mighty river that suddenly slow down, in a kilometer away on the river, saw a dams, river flow into the side of the dam along the canals, and dams that Bailongjiang side of the river, because the water was cut off, almost dried up river bed covered with large and small stones. Moved on along the river, found that nearly 10 km of the river drying up completely. Rental business in the local running race capsule master told reporters, hydroelectric power plants of all is to allow the water hole to go up. Bailongjiang mostly dry with the. Bailongjiang stop listening to a reporter asked about the matter, race bag and take the initiative from the master wizard, he told reporters that the dam is a hydroelectric dams, the river is a tunnel through the mountains, flow into a downstream hydroelectric generators. Sure enough, ten kilometers away from the dam where the reporter saw the river pouring down from the tunnel to complete the power function, was again discharged into the Bailongjiang. But had not gone far, the reporter found a place in the 600 meters,belt hermes, there was a barrage, turbulent Bailongjiang, once again became a quiet reservoir, from the side of the canal flows into the tunnel. Again cut down the middle of the Bailongjiang, in addition to stone or river rock. Game bag tells us that this area of ??the station is almost end to end, it appears a dam, there will be up to several kilometers Bailongjiang to stop more than ten kilometers. Game Master told reporters Kabbah rural hydropower stations in this section has five, and are newly built. Water Water correspondent in Zhouqu that the current Bailongjiang River tributaries Shui Dianzhan over 1000. This hydropower installed capacity of small, built dams upstream and downstream power units built, the dam the water intercepted by artificial channel into the turbine, the use of gap power. Zhouqu the Kongjing Li told reporters Water Water Shui Dianzhan all Shuidong type, water station,hermes bag, through the sub-holes, two power stations is 12 km and more. When a reporter asked why so long time, Kongjing Li said in order to make the head a little higher, drop a little higher, the higher the head, the greater the power output. A hydroelectric power stations to cut down the middle for a while and Bailongjiang period. Although the time when the wet period, but in addition there are several hydroelectric put a small amount of water, the leak most of the other dams, the river drains are toward the station. Bailongjiang large river dried up riverbed only so bare. Highway 313 along the boundary line into the boat song, the reporter found, along with a dozen mudslides occurred before, foolish old class township Zhangjia Cheng told reporters the night before a heavy rain, triggered landslides and blocked roads. The villagers also told reporters here that a large landslides and debris flows down all of stone. When a reporter asked the hillside very strong case, how the stone is down? Zhang Jiacheng old man told reporters, when heavy rain to the stone and not so fixed. Although the car is over when the dust big, but not this road is a little dusty debris flows are not. Reporters found that in the upper reaches of the crystal clear Bailongjiang reach the Gansu Diebu Zhouqu, the program has become a muddy yellow. Bailongjiang upstream sides crowded, covered with virgin forest, here became a barren mountain, hanging along the roadside landslide areas and large stones, seems to touch, let the past vehicles and pedestrians can not do anything stay. The villagers said landslides blocked roads, smashed cars crossing the road, or even washed away land, here are a very common thing. However, in old peoples minds, there is little previous Zhouqu debris. Zhangjia Cheng told reporters, before all the original forest, the trees are very thick, are now gone, before the debris is very little, and now so much debris, such as now built Bazi is closely related, because if the forest looks a lot, would not have happened had so much debris. Said the old mans Bazi is near several hydropower stations. Zhang Jiacheng said today that the outbreak of several hills of debris, once contiguous forests, trees hold surplus, blotting out the sun, but from the 1980s onwards, local logging, cutting of the powerful, mountain forests are chopped down, and later closed forest, the vegetation restored some, but in recent years, the new station, to restore the vegetation and destroyed. The downside is built power plant severely damaged when a reporter asked what the damage to the building hydropower stations, the villagers said destruction of forests, deforestation can not be built because they do not, do not cut left not in the past, the tube can not pull over. During the interview, Zhang Jiacheng old man told reporters that seal off Yulin these years, they never give up the trees, but before these mountains covered with forests, trees are now very difficult to survive. Before the tree can survive, is because the soil Ye Hao . But now these places without water trees. Reporters puzzled and asked, guarding the river stands to reason this place is not a dry place, why the trees have been planted not live? The villagers say that is because people have Ravine water, we did not ditch a little water and then big. Mountain or hill, why did the mountains covered with virgin forest, the tree is now very difficult to survive it? Adviser to the Minister of Water Resources Wang Hao, Academician, told reporters this area because the soil is very thin Bailongjiang, the original vegetation protects the soil there, and now after these cut vegetation, and then rain on soil erosion, the so-called soil erosion. Then plant trees, limited soil are lost, and then further on it is not easy to restore the species. Nearly eight years old geologist Sun Wenpeng find, in the 1970s, when once lived in the Bailongjiang River, in his mind, now that multiple landslides, slopes everywhere where once was a beautiful , fish in groups of Yangtze River Delta. Sun Wenpeng told reporters before about rain, the fish are holding the pole bar. "The middle of the river water which crashed, you can pick up, you can use pole tie, so long (hand gestures) of the fish there, then very funny fellow, after all the rain to get inside the pole to the drains to find fish." Lock children also told reporters that the original head of the village rushed down the river are the clear, and now the rain is muddy water. Correspondents say the rain watching the muddy water is yellow, but also muddy the ah. Child lock, said it is because the first village along the river roads, repair power plant impact. There followed the sediment down. Child lock before the first mayor said there just to see the fish swim, have time you can use a hook up directly to the hook, but now there is no. Environmental protection bureau, told reporters: Zhouqu a beautiful, real mountains are green, the water is clear, the sky is blue, Bailongjiang, the original on the crystal clear water and some fish can see inside, but there are basic on extinction, and now repair station, repair station after the reservoir, a level, to the breeding season the fish to swim upstream, to be migratory. Migration of the channel is now broken. Tibetan village, when passing through Pakistan, reporters found that many villagers along the road in repair the house, which caused a reporters curiosity. Luliang Hua said the old man, repair the house because the house foundation subsidence, cracks can not live. Lu Lianghua old told reporters into his palm to be able to crack in four centimeters. Two years ago, when the station began to build up slowly cracks up. Chen Jun, told reporters the mayor right now is basically 80% of the entire foundation of the house is collapsed. The house is not being strong sense of security. Now a large capacity Shui Dianzhan continuing drop of water, side who have flooded the whole fruit. CHEN village the right to introduce, before a Pakistani village hidden gold mine, when the Caikong Republic, the reservoir water is flowing into the hole along the Nuggets village. Xueju Min told reporters before the old people to dig gold, and hydropower up the water column, sinking on their own. Former ground, now part of the surface sink, and only out of the hole, the hole in the Zhuangzi in the lot. The largest sink area with 27 cubic meters. The villagers say that the large capacity hydropower station, the reporter found that hydropower reservoirs, from the Palestinian village of possession of less than 3 meters. Lu Jin told reporters water level rose to almost 20 meters, the reservoir is almost 3 km. There are all kinds of land was flooded, bubble, and have collapsed, while all collapse down. Previously, when the reservoir does not collapse on both sides of the slope, the water below, the previous geological rather hard, and now water comes,herve legers, above all the loose soil, sand, sand is easy to flood damage. When a reporter asked, several villages appeared debris cracks, collapse the two sides of the situation, Lu Jin is almost attached to all the cracks along the riverbed. Reporters learned that the two villages now have more than 3900 people living in Pakistan and the Tibetan township has repeatedly come out in consultation station, hoping to reduce the volume of water, but the station did not agree, ultimately agreed to only 200,600 yuan per square prices ranging from compensation villagers to build a new house. Now the villagers have received their compensation, but the villagers have found trouble does not end, because the newly built house and cracked. Completion of this crack appeared about thirty-four days, cracked on the growing. Hydropower dams and Pakistani ground subsidence Tibetan village houses,nike dunks heels, wall cracks in the end what kind of relationship? We reflected to the geologist Sun Wenpeng. Geological experts Sunwen Peng told reporters that the dam a lift, the net change in groundwater, and why? Stopped here after the dam raised the water level, water would go visit both sides of the run, both sides of the run, is dry, the water table elevation, the areas on both sides of the evaluation that was to start, breaking the balance, what is the case, who also do not know, the hollowing out of the underground area, certainly a collapse. In the Sun Wenpeng view, this construction of hydropower stations disorder caused geological disasters, the reservoir close to the village, even if the Nuggets did not cave underground water table will rise,jordan high heels, leading to subsidence or collapse of the housing. Hydropower development of the current disorder caused rivers drying up, geoscientists Sun Wenpeng very anxious. Sun Wenpeng that damage is not one day get rid of a tree where a long ten years, twenty years after the destruction to be able to recover it, but also to restore it. The slump continues, and how to put it back up, the whole village was gone, lost tens of thousands of dollars to build a house somewhere else, next to impossible to build a house, there is no ecological conditions. Second, Zhouqu earthquake, the environmental protection department: We are unable to manage without a license station to see the dry river bed, large tracts of vegetation has been damaged, people at home on the wall cracks and collapse of the pit in the yard, my heart has always been correct with . These hydropower stations caused by the threat of ecological disasters and geological shocking, who then had approved the construction of it? Reporters learned that the hydropower construction project approval, the need to go through rigorous environmental assessment and safety evaluation, as a Palestinian village hidden underground mineral and leaving holes all over the place where the gold, power dams built in the village where a few meters away building have been the beginning of the EIA? If by the EIA, the EIA report that is how the requirements? If not passed, then why large capacity hydropower station has run from 2008? Reporter linked to the large capacity hydropower investors Gansu Electric Power Investment Co., Ltd., but companies that convenient interview. Subsequently, the reporter went to the local authorities for understanding. Reporters visited the approval authorities and hydropower, for Zhouqu this place in the end not to build hydropower stations ZhouQuXian earthquake Channel of Nie Limin, Zhang Xiaohong, deputy director of land bureau attitude clear: Bailongjiang River is not suitable for the dam. And geological experts to reporters that, Bailongjiang in a fault zone, from Diebu to Zhouqu to Wudu Bailongjiang fault zone is part. Deputy Secretary for Land and told reporters, where the mountain more broken in the whole country, but also earthquake landslide three high incidence of disasters. Xiaohong told reporters that last year caused large landslides landslide Zhouqu eighty-eight volume is 200 million tons, and like Saul Figure landslide,jordan heels 2011, landslide discharge these "giant", landslide of 13,000 tons, and in 1981 and 1991 years have undergone sliding block Bailongjiang, flooded town, until now still slowly sliding. In such places hydropower development will increase the occurrence of geological disasters. Deputy Secretary for Land and told reporters, were in power station construction, some drainage to the mountain to a certain extent. And described in detail to reporters this effect, he explained that, in the middle of the mountain will have to repair drainage excavation. If the excavation zone landslide slope angle, then an excavation on a vacant, vacant instability caused by the mountain, also produce some local landslides, collapse of such a situation. Nie Limin said the principle for the construction of the earthquake fault zone, the higher authorities are clearly defined, including the construction of hydropower projects, including the earthquake must be carried out safety assessment department and the local seismic station to be registered, then Bailongjiang the construction of these hydroelectric basin is through the safety assessment of how it? On this point, geologist, told reporters, according to the corresponding national policy, must engage in and do the appropriate seismic safety assessment procedures. Now they do not have to. And not all of the hydropower stations are to have had this procedure last year for this procedure is Maqu station, the other station did not complete the procedure. Nie Limin said that the current approval ZhouQuXian hydropower project has 68, only one to him through the safety evaluation and registration carried out here, where the rest to do more than 67 safety assessment, has been adopted, they do not know. As to the registration of which a Maqu station, and just built on the fault, he is by the safety evaluation of how it? When the reporter learned that the words in the earthquake belt construction is non-compliance after the geological experts to ask whether more than 60 Shui Dianzhan have had relevant procedures, geological experts give this answer, do not do this procedure, they asked Provincial Academy of Engineering run. Reporters learned that the hydropower projects in the project approval, also need to undergo a rigorous environmental impact assessment procedures, then ZhouQuXian 68 hydropower EIA case what? Zhouqu County Environmental Protection Bureau,white dresses, Qing-Min Zhang told us that states have the right level of environmental protection administration departments for approval, so this 68 station case in the end how the EIA, he was not very clear. Reporters then contacted the Environmental Protection Agency in Gannan Prefecture, hoping to understand the basin hydropower EIA case, however, until the broadcast, Gannan EPA did not provide any data. On the countys hot water project launched, Qing-Min Zhang, said he does not agree. Environmental protection bureau said that because there are water hole, the evaporation of a small, water vegetation on the ground will be less, and this way, the environment becomes increasingly arid, drought has caused the vegetation does not grow. For Bailongjiang more to build more hydropower stations, Qing-Min Zhang said he was very worried, from the eighties of deforestation, the last few years of mining,hermes belts gold, large-scale the dam, Zhouqu already fragile ecological environment, more and more frequent debris flow is natural to Zhouqu warning. Environmental protection bureau, said this in their memory of them, when there is a small debris flow, but very small; now is the direct destruction of villages, blocking roads is a regular thing. To understand the current situation Shui Dianzhan approved, reporters immediately found a station, ZhouQuXian Bo Xiang a new hydropower station, where dams and aqueducts of the tunnel which is under construction. Reporters asked the staff whether the tunnel has been playing, a Kongjing Li replied, no, we plan to hit 12.5 km is now played only 6 kilometers more. So this year started construction of the hydropower station, the EIA of how what? Shui Dianzhan official told us that they have not passed to the current environmental assessment, for this reason, the forestry sector unwilling to give them an area to do procedures, recently asked them to shut down. Kongjing Li told reporters, to go through formalities have to have a forest occupied by the EIA, the EIA procedure because Bo yuhe inside the EIA planning is not done. Because there are no environmental assessment done, so no forest land occupation procedures also do. EIA did not pass, without going through the forest area of ??procedures, already under construction, and that this Shuidian Zhan in the end have to monitor the department to carry out seismic safety evaluation of it? The Kongjing Li said the seismic safety evaluation of departments do not do. Third, where 20 million increase, the central reconstruction of 50 million, how settled this account? 68 hydropower stations, only one for safety evaluation and seismic record, this shocking fact, we can not let the people Zhouqu Nie Bahan. In fact,herve leger dresses, like the case of undocumented station flooded, not only in Zhouqu, on our part for this phenomenon in recent years been reported many times, come look. 2004 Reporters learned in Sichuan, one in Shimian only 34 km length of the small River, from upstream to downstream, hydropower a then a, the small River basin, covered with large and small hydropower station, look here looked, escape see three power plants are closely linked. Reporters found here, a total length of 34 kilometers has been completed and the small River hydropower stations under construction as high as 17, that is on the small River every two kilometers there is a station. This reporter has learned, there are a lot of these hydropower project are neither designed nor, much less the management and inspection procedures of the "four no" power plants, and statistics departments in Sichuan Province, Sichuan province in 2003 found "four no "station 128. Reporters noted that in order to grab duration, early generation, many hydropower projects are free to dump waste in the river from the city of Gansu,kids ken griffey shoes, Sichuan Baoxing town a dozen miles of the river, the reporter discovered the case of three waste dumping. At that time, flood, rainfall, flood control is the most critical moment, and these discarded in the tributaries and main stream in the construction waste, if the blocked river, encountered continuous heavy rain, the river will rise, the surrounding roads and villages will facing a serious disaster. Reporters interview found in Guizhou province, where a high density of small hydropower stations the same. Counties in Guizhou provincial real Xinmin River, the reporter saw, just a few kilometers of the river, it built seven small hydropower stations. Michizane County Water Conservancy Bureau chief told reporters that the third is that Xinmin station. Reporter: is this house is the third-class power plant. Michizane County Water Conservancy Bureau Chief: Yes. Reporter: The fourth station is where? Michizane County Water Conservancy Bureau Chief: The fourth in the Xinmin two power plants, this is the sixth-class power plant. Reporter: This is the sixth. Michizane County Water Conservancy Bureau Chief: Finally, that direction is to complete the seventh grade this year plant. In fact, duration of morning rush was not just the small and medium hydropower generation in recent years, several power giants have also joined the undocumented development, Happy Valley Circle water ranks. In 2004, after finishing the Three Gorges Development Corporation in no case of EIA procedures on the construction of Xiluodu Hydropower Station, eventually halted by the State Environmental Protection Administration; 2009, the Environmental Protection Department of Huaneng and Huadian Group also set out strict EIA ticket on the grounds that the two companies did not apply the same environmental impact assessment procedures in the case of Lu to pull on the construction of hydropower stations and Longkaikou hydropower. In 2009, this column reporters in the State Environmental Protection Department issued two orders to stop the interview the two hydropower stations in the Huadian Groups Lu to pull station construction site, reporters saw the cofferdam has been built, the Jinsha River here has been closure. Reporters asked, and now this is not a dam project, Yunnan Huadian Lu to pull security technology company director Zhang Xiangtao told reporters that this is the two cofferdams, the above is the upstream cofferdam, cofferdam downstream station now, as the power plant dam construction, it is first necessary to make the basic condition is the diversion of water from the hole to go. Reporters saw the Jinsha River water diversion from the man-made hole rushes out. Cross lush vegetation is now gone. Cofferdam, the worker is being constructed, is full of the roar of the machine. Huaneng Groups long opening in the station, the reporter saw the dam has been a considerable size. Main dam began watering the cement. Jinsha River from the diversion channel through the original river dam is used for closure. Reporters asked to Zhang Ping, Can the EIA report before the adoption of the main dam to dam construction projects and Zhang Ping said of the bad answer, because the closure must be carried out in the dry season, if not closure is necessary to push one year. No relevant procedures, the station will be able to openly why the mountains blasting,cheap herve leger dresses, dam closure? Local government departments did not find it? If found,hermes mens belt, why not stop it? Reporters continue the investigation. Environmental assessment, safety evaluation, forestry covering procedures are not handled by Bo Yu hydropower station, has actually started more than six months, but the interview, the reporter found, hydropower is not responsible for the formalities of the things that upset, said the FDA halted the things, China Merchants has agreed to come forward to help. When a reporter asked, now looking for Merchants, Merchants are able to help, Kongjing Li told reporters that China Merchants can, through Mr Wong, as long as they have one thing, we came to investment, water conservancy, environmental protection, some sectoral coordination through the County . Kongjing Li mentioned the Mr Wong, a local Merchants Secretary Wang Jiangong, the EIA has not yet approved, or no safety evaluation conducted in this case, the Secretary can give what this station help? Reporters asked, how to communicate the things ready, Merchants director Wang Jian-Gong told reporters that this is the exchange, first find the focus of both conflicts, the contradictions of real negotiations based on the final consensus. Reporters learned to Mr Wong, in the negotiations, the general investment business conflicts as China Merchants come to the people by negotiation, it can not be resolved, it asked the county government and county leaders to solve. Wang Jian-Gong said, investment, development of hydropower, the whole development plan in Gannan Prefecture. Reporters learned that the forest resource-rich Gannan region, was once the original forest cover, is the main source of income for local, but decades of logging, leading to depletion of forest resources, beginning in 2005, Gannan areas counties suggests that " forest water storage, water power, to electricity and promote workers to work Fuxian "development of ideas, the development of small hydropower investment. In Mr Wongs office, the only wall chart is posted in this station distribution map from the map view, more than Zhouqu, the Bailongjiang River, has been covered by dense station. Wang Jian-Gong told reporters, such as these with a little lightning symbol is hydropower. Reporters asked, the introduction of capital investment of nearly 67 million, built up if all these projects will greatly promote the economic development of Zhouqu. What kind of tax to achieve a number? Wang Jian-gong that probably counted nearly two million. Mr Wong told us that, at present, the county water and electricity investment is still in full swing. Mr Wong said, such as Zhouqu poor areas if the water wasted, non-development, poverty and backwardness Zhouqu will continue, if all of these hydropower development up, two billion to income, other industries can develop , on the whole the local economy driven. When a reporter asked to do so will not worthy, will not impact on the ecology, the Water Conservancy Bureau,hermes birkin orange, said the destruction of vegetation, causing soil erosion, but also that argument, but in general, then after this last, As for the negative effects if they are not accounted for the major, a little impact, but little is minimal. Zhouqu County Finance Bureau correspondent in that, in the absence of hydropower investment before 2005, the county revenue just over ten million, six years after the investment, 27 million have been completed during the first half of this year, the annual revenue is expected to reach 49.29 million. 40% came from hydropower sales tax. Zhouqu County Finance Bureau workers told reporters that in previous years 40% smaller than the proportion is now growing year by year. About 10% of the annual growth rate of the reporter found, hydropower development has brought to Zhouqu local financial revenue of about 20 million a year, but because of an eighty-eight large debris flow caused by the disaster, the central and provincial government need to invest in reconstruction funds up to 50 120 million. Finance Bureau, told reporters that 50 million 20 million, and now these expenditures are mainly urban and rural urban construction of residential housing there is also expenditure on public services, and that is infrastructure, there Bailongjiang channel regulation, there is the disaster management Theres economic renewal and the environment, that is, the ecological environment of the eight large expenses, mainly attributable to the urban and rural residential housing is up to this one, this one which accounts for more than 20 million 700 million investment, there is Bailongjiang channel is spending 300 million this the ecological environment accounted for $ 190 million. Reporters asked that the $ 190 million of the ecological environment is mainly used for what, the Financial Secretary said that ecological restoration and environmental remediation. The Financial Secretary said, the county did not invest the countys financial income of 40 million, which they simply can not be protected, so this part of the investment, or the central largely rely on the central and provincial finances. Reporters found that Zhouqu hydropower development seems to have entered a vicious circle, where the tax calculation, while the ecological damage caused by the disaster will be, once by the central government, provincial finance all pay. Chinese Academy of Engineering, Water Resources Minister Wang Hao, Academician consultant that is interested in immediate mode of development is no different harm than good. Adviser to the Minister of Water Resources Wang Hao, Academician, told reporters that are in areas where a small head, took the bulk of state subsidies to local, this is a very short-sighted practice of head butt command, is what happened, this is the place to close taxes, eye, close one eye, so many unqualified launched a large number of small hydropower, increase GDP, this caused serious ecological impact of this development should clearly say no way consistent with the scientific concept of development. Four half-hour observation: How manage and Local Government "to life" the water adventure? Come look at the scene in front of the program, more than 1,000 compatriots died a year ago, the state spent more than 50 billion reconstruction. And now to our correspondent shot, there are many places the river bed is still dry, still cracks rural housing, farmland still collapse, the vegetation is still destroyed, bitter two geological experts, local seismic station and the EPA against the void, great big bag Merchants embrace to help undocumented Shui Dianzhan launched, Finance Bureau misses is more than 20 million water revenue. This is a mess, it is an absurd account! For petty profits, not only a waste of national reconstruction and restoration ecology of huge amounts of money, which takes tens of thousands of people at risk Zhouqu! Need to reflect local Governments electricity and water adventure, why produce? How they can take control of this adventure? Water in the Central Work Conference, General Secretary Hu Jintao pointed out that, to speed up reform and development of water resources, priority should adhere to the principle of peoples livelihood, the people most concerned about efforts to solve the most direct and practical problems of water, promote water development to better serve to protect and improve peoples livelihood; to adhere to integrated principles, with emphasis on pesticides Hennessy, both disaster prevention and mitigation, taking into account the underlying causes of overall arrangements for the rational development of water resources,jordan high heels, optimal allocation,bags hermes, a comprehensive conservation, effective protection, scientific management; harmonious people and water to adhere to the principle of rational development, optimization configuration, a comprehensive conservation, effective protection and efficient use of water resources, reasonable living arrangements, production and ecological purposes. General Secretary Hu put forward to implement these principles, we need to have a set of institutional cooperation. If our evaluation system for officials or to GDP-oriented, career and promotion or in investment, financial income as an indicator, in some places, these principles may be difficult landing. (Source: China Network TV)
相关的主题文章:


hermes kelly pink 36_4034

air griffey 2 36_4223

nike dunk heels 36_3989

air griffeys 1 36_3989

hermes sale 36_4031
  Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT. The time now is 10:22 AM.

 

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum