Quick Search


Tibetan singing bowl music,sound healing, remove negative energy.

528hz solfreggio music -  Attract Wealth and Abundance, Manifest Money and Increase Luck



 
Your forum announcement here!

  Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums > Free Advertising Forums Directory > Message Boards Directory

Message Boards Directory These are similar to forums, but the posts are listed in chronological order and not by category. They also dont require any registration.

Reply
 
Thread Tools Search this Thread Display Modes
Old 07-24-2011, 11:04 AM   #1
D727j3fnvh
 
Posts: n/a
Default 200 elaboration tips ( marital, nomaritaled have a

1, the section will not be the first shoe, leaving a little space so that shoes can leak into the bottom ash, sink and gas furnace altitude mounted light. Given the position of the bathroom floor drain must first meditation well,Womens Gucci Pumps, a good amount of size. Drain the best side in the brick, the brick in the middle position if so, how to slant either brick, floor drain is not the lowest point.

2, bathroom, air-conditioning outlets were not designed to switch. Especially the bathroom water heater, a pair of level switch with a plug appropriate. To get busy electric, pull the plug precarious

3, sun angle on tile portion of the treatment, in the final analysis is to see at worker level. If the level of good workers, plasterers, tile tools and wear better, they ought not hesitate to select the train of grinding 45-degree angle. In effect, at the peak of a good grinding, grinding 45-degree approach angle of the sun angle is the most smart! If the level is naturally not very good worker, then you still choose to use affirmative angle of it, because the mill's bad practice not as good as 45-degree angle with the angle of the sun's effects.

4, line up the pipes after the water oppression test is also very important. Test, we must all be present, and the test for at fewest 30 minutes, conditions permitting, the best one hour. 10 kg pressure, without any reduction before the final test.

5, when the iron doors steel doors must be considered a good size frame protruding walls to inform the installer, making the final frame and had finished the wall tiles are smooth, so not only beautiful, and good health to do.

6, carpenter and mason's Door package is to knot the tiling, including door pocket of time to consider the following ground (the ground side of the door either side) is also tiled cement mortar or other thing, because if you paste porcelain Door Nail good before, has packages to the ground, with cement in the future, if cement and Door stained, moldy water will cause wood Door

7, below the mattress and bed board must be breathable. Bed board is generally best to use cedar board

8, do the paint as much as periodical tape

9, buy a lamp to note: generally try to use glass, stainless steel, copper or wood (shelf), and generally do not buy any other coating steel plated, ah, ah what kind of paint, easily fade.

10, It’s about time ceramic basin basin, glass basin downright Health

11, water reform plan to be their own good, ask them to open the straight-line Cao. Watching them draw their own line, the whole line open by painting Cao. Each have their own acceptance Caixing.

12, water must be good, be sure to test the water!

13, a lot of construction in the verbal accord into the gap checkout slaughtered, must be written in black and white, increase or decrease in prices of items are sure to ask, write it!

14, floor floor, if installed, to re-do all the ground re-smooth cement floor.

15, the kitchen door, or the decoration of wood to make wooden hanging rail doors for good.

16, the living room as much as possible to install the power plug.

17, is still to be done outside the shower toilet partitions. Not trouble the easy way to pull a shower curtain, the actual inconvenience, water everywhere.

18, do door and door frame of the wood material to choose carefully the material.

19, before installing the cabinet must be sure your home's water is OKAY.

20, kitchen floor tiles will not elect white.


21, paying particular attention to the ceiling smooth putty before wiping Dulux

22, the number of living room lighting should not be too light, simple is better, or like the lighting shop!

23, to buy the things you need to install those sellers will be necessary to install, it does not include installation, after installation, it must adhere completely to pay money! !

24, decoration, your formerly collected affair cards manufacturers carry

25, Lvkou Ban protective movie is best removed before installation.

26, the shoe is best to use curtain, anti-odor. You can leave a shoe outlet side, to plug bake shoes.

27, where the cooking can be a small security lights.

28, it is convenient cafeteria exhaust fan can also be safe, so when you eat hot pot or do not filthy roast house hall ceiling.

29, the gate is best placed to sort a debris of the cabinet, can be placed on the shoe. The general things, such as umbrellas, bags, scissors, coins, and so dine of the drugs in there, so it is convenient.
30, there is no need to use your ceiling, as not too worried about humidity and cooking fumes, moisture-proof gypsum scrubbing brush is recommended to use waterproof paint, a passenger guard my house to do so, very beautiful. If you must use Lvkou Ban ceiling, it is recommended:
1, not too expensive.
2, using the net color,Womens Gucci Flats, primarily the kitchen ceiling, white on the good, and white unless color and decoration manner of match, it will easily incongruous.
3, his grabbing mind, do not believe selling the vision of smallpox, their eyes Barbara taint.
4, staring at himself in the scene, meantime earnings is important, do not let them slack, or leave the black suture, how to look how ugly.

31, third day of the main hole and continue to paste tiles, range hood and vent water heaters to pre-lay, and if so then perforated tiles affixed good, is not convenient. Therefore, the decoration must be selected before the hood, stoves and water heaters, etc., to determine the hole size.

32, although taking into account the custom-made cabinets look good, but not durable, comprehensive online views and experiences of some students, the use of cement to do to counter the structure of interior and external sides of paste porcelain, relentless countertops, wall cabinets and counters wood door or chosen to do. Out of the cabinet to do so durable, moisture-proof. And the cost is small. Many neighbors said looked good, I did not beat.

33, well after the Door, plasterers plaster line to start the installation, wall Pihui project. My family had relatively smooth wall, agreed 2-3 road on it. Pihui granted when a gray lustered once, and then paint brush after brushing but too polished, and finally twice with ICI paint brush, the entire wall look flat and flat, actually good. Upon completion of the ceiling wall, carpenter started wardrobe. The wardrobe is 18cm Albert card Daixinban do appearance paste veneer, nevertheless there is no furniture store to buy so agreeable, but durable, quality should be better than buying. I am not terrified of standing receptacle board. Buy probably will not work. Backplane is relatively thick, svelte to buy that.

34, when other students in the tiling must note the following:
① best he can in the field.
② some of the less perfect tile can be additional to the future of some workers to see the location, such as cabinets, sinks, mirrors back, but also pay attention to tile, brick, etc. Do not waist was additional to the above position of workers, or What you can not see the future, but also wasting money.
③ wall tiles, floor tiles in the paste before the overrun damage must be ample period.
④ Be sure to drain plug with something good out of cement down to discourage clogging. My home out for the concrete layer drain is blocked, it took 30 treatment bureau to find remove, get up a lot of small mire.
⑤ at the scene, the workers will not be too wasted tiles. Tiling my family when not at the scene, then go, wasted a lot of brick, very sorrowful, all perspiration Mimi Yeah.

35, a wall of long, high. Such as a bathroom with four walls, each wall should measure out its long, high. And then deduct a window and door area. Finally, count the ground area. After you put a good amount of size, you can also get to sell tile sub shop, they will help you re-match. Plus 5 percent-losses on the line.

36, the best is a two bedroom dome light control, and a door, a bed, a bed of winter save up and then turn off the lights.

37, the socket must be considered a good location, height, interval. Even first play location having steel cassette, put away after a cassette is found just by television cabinets, microwave, desk block, the first two had to move the location of furniture, high, and finally found not only ergonomic height, but can not be bought a good fit stainless steel cabinet legs, only customized aluminum feet.

38, just around the edge in the hallway like the one installed, that there are bright effect.

39, when mounted lights did not consider the placement of the table, the table now is not in the navel of light.

40, bathroom tiles do not use too much pigment, one easily dirty, and secondly, a long time too blunt!


41, channel to more equipment, furniture to buy outside the ground to be considered safe to dirt, kind of room to look, in principle, to adhere to.

42, Lvkou Ban did not absence to purchase high-priced, very low Lvkou Ban the effect has been distant better than PVC, the extra money I can not discern significantly differ results. Buy Lvkouban particular attention to the keel and not Lvkou itself (Lvkou goal is not simple to tamper also much), routinely on the keel complete ghost.

43, brick color is difficult to find satisfactory, I did not find, but the two kinds of color are not satisfied with staggered mosaic sub 45-degree angle I was able to attain satisfactory results. This is indeed the bricklayer himself put forward good suggestions.

44, playing in the balcony on the top cabinet on the back of the cabinet, then a layer of foam board insulation with water works well. Balcony door is best to use the same type of blaze board. Balcony environment is bad.

45, if no appropriate molding may hope to order, custom-made quality also seems better than the sample. More personalized and customized.

46, bathroom floor cabinets with stainless steel thighs are colossal profits, the back of the store to find some place to buy cheap price mad.

47, install the door lock head to pay attention to some wax, wax on and then crashing too late. If you do not smoke, then also pay attention to the door handle to prevent wall damage.

48, Paco floor well, I like only to remind the employer to talk directly to the price and the salesperson to talk about than the price better.

49, matte paint is high and the light beautiful

50, if the re-decoration will use putty instead of talc products.

51, installation and air leakage protection switch coalition carton of the project can not be provincial, but not on the outside to be on the interior, the aboriginal will want to save wages outside the old junction box used, electrical proposal put In the indoor ones, and immediately he found this proposal very expensive.

52, and air leakage protection switch to use the brand appoint. I use the Want to buy the real thing is simple, direct phone check MGE headquarters phone number, and then played to ask the regional branch number.

53, Under Counter Basin Above Counter Basin than slight, fine, good clean. Basin faucet with the audience to pay attention to, taking into account the thickness of the basin edge, leading to the mouth longer.

54, without any modification of the wall angle is also very beautiful, but to find a painter in the advance stage and the painter apparently put amenable. Ding Jiaoxian angle helps to play a straight line.

55, online slots before the cement surface of the putty surface treatment is important, for no solid surface with a clean ball treatment is very appropriate.

56, make plaster suitable for a large hole on the wall, of course, if the hole is too large or need to use cement.

57, frosted glass, not dyed with the back of ten million to protect the paint, is tough to clean!

58, Caipen leading back of the hand switch must be used, that must be not easy to keep clean fingers, the hands are turned up when the oil is also difficult.

59, the price of luxury auto racks too much water, and found some of the more well-known brand is not on the structural design but better than the brands, prices are much lower.

60, could be considered safe on the ground of the metal socket, the socket 100 is very expensive, but very convenient, usually flush with the ground, feet a foot on the socket can popup up. Suitable for large living room. Or security in the dining room table beneath, to insert pot (to prevent hanging back and ahead when moving wires)


61, storage room. TX has been said, but I did not do doors, looks very beautiful, and easy to put dirty dress cupboard.

62, starting bed frame (the so called it). I am a vocational company to buy the linen bed, bed, and spent 350 yuan plus a such a thing, end of the bed there is a pull handle, bed board will turn up, exposing the base of the warehouse space, Terrific Oh!

63, is not practical double-pole towel rack! Current and single-pole uses the same elementary look inside wafer ambition not be hanging pole and then drying towel

64, that is not practical cabinet inside the trash can, as on the outside. There do not install the door and the table plate of the trash binary, open the door when the summer will be very smelly. Trash or on the outside good.

65, the table next to the small cabinet, and can be placed on some stuff, very convenient.

66, on I think the mop bucket less claiming in terms of extravaganza, can convene one yourself out, covered with tiles and match the circling environment or the mosaic that is beautiful, and save money.

67, the bathroom can fix fasten point of hook to hang something.

68, designed a bathroom cupboard to put clothes, no longer have to anxiety about bathing forgot to clean clothes.

69, suffered a caustic practical washing machine with dryer, in addition to a year, only the yellow mold-day, and the evil mammoth. Thick clothes, towels or drying leave, let the sun more than a good buyer disinfection. Even been overdrawn, you need to save the point of silver.
70, even in the laundry room to do a laundry pool, used to hand wash something. Originally thought to use less, so buy a very cheap Terri leader. Did not think this is really convenient laundry pool, became my most frequently used a home washing area. What rag ah, socks, ah, to towels, ah, all in which to wash, even the most hands there too.

71, fitted with lights is not really practical, not the decoration finished now opened. There are just SHOW guests to look at lighting, I simply forgot their own also installed a this thing. When the original is to open PARTY under mythological, now do not have much become of opening spotlights.

72, most fitting experience is actually as uncomplicated as feasible, fewer pollution, fewer money, peace of idea.

73, useful stuff:
①-designed storage room.
② North Terrace used to wash dirt sink. Differences between the bathroom sink and kitchen sink washing dishes and vegetables.
③ bathroom to clean your cilia you can pull out the leader. (Wash basin was not the TX exceptions).
④ easy to clean the floor and the right cleaning tools.
⑤ kitchen work table lamps.

74, to buy their own toilet must be a good amount of pitch, or go buy a return that is really ... ...

75,Womens Gucci Casual Trainers, posted WeiChu tiles after a good measure of what did not dry before the best level, the lowest point is not to look at the drip, or other dry and then passing the buck and decoration team, a lot of dead compartments.

76, ledge stone with the Great Wall of beads Angeles, is a 800X800 tiles. Manufacturers cut good milling, Mason posted. Pattern did not look good also
radiation.

77, bathroom shower room must be large enough size, and use transparent glass, so there does not seem cramped shower.

78, should not use white cement tiles pointing hook. No month into a black seam, ugly decease. The results they have bought their own hook pointing proxy, that exhausted

79, the cabinet should be under the artificial stone after the board of the pad, the result is not found after installation, are now afraid to cut the pork in the above, promised to give me almost two months have not installed installed (only to grinding a).
80, do not believe the spell of the designer. Of course, you can visit more than several decoration companies, from each design to extract the real useful things, the key is you want to pretend to look like home improvement.


81, if the floor drain installed the original developers have the kind of injure smell of the

82, attached bathroom floor tiles after a good test the water, if water is relatively slow immediately rework. Our household's water is relatively slow, then relented a bit, now it is always a little bath water, and made hundreds of our main Guardian silver shower head is laze, it always wondering how to treat.

83, fitted wash basin and mirror to be considered good, put brush glass rack, towel rack relating rank.

84, to consider when buying a mirror the mirror front lamps, if you do not want to install a temporary mirror front lamps, mirrors the size of the mirror to be competent to cover for the best line of headlights kept.

85, put the washing on the balcony to be a small cupboard, easy to put some debris, such as washing powder within the debris. Both beautiful and practical

86, must be looking at doing upstairs upstairs trickling water .... otherwise, get a hanging cabinet, the wall is a mess ....

87, do not blindly follow the buy online, I later discovered that some of their own to buy cheaper than the sale.

88, television wall must set a few more outlets, television, DVD .... a put, you will find enough outlets.

89, change the water well in the future to be considered before the installation of a large example of wash basin, for instance, the left or right pots pots, water and drainage that is situated where. Otherwise,Gucci Shoes Sale, changing for the better after the finding phase of the wash basin is fit!

90, on the shutters, we had better put your stay a size works, the boss shows no less size. If less, then how come the. Or saw him hack his cloth.

91, the decoration of the construction process:
(1) approach, tearing down walls, walls.
(2) bathroom, kitchen floor to do 24 hours off water tests (required the developer to complete this task).
(3) cutting trough, water reform and acceptance.
(4) seal groove secluded underground water renovation project, closed water leak test started without waterproofing.
(5) bathroom, kitchen wall attached disk.
(6) Woodworking approach, suspended ceilings, plaster moldings.
(7) packages Door, skylight cover. Making wooden cabinet frame.
(8) simultaneous production of wooden doors, door style and platen.
(9) wooden panel paint brush dust (food vegetable fuel).
(10) window leveling laying marble countertops.
(11) neat panel, pasted, fine line product and installation.
(12) wall of basic treatment, grinding, leveling.
(13) appliances, door seams paste adhesive (protected side).
(14) ICI at least three times the oil the wall.
(15) furniture painting approximate, eye patch and paint.
(16) dealing with corners, laying floor tiles, wood or composite wood flooring, waterproof marble bar, the baseboard.
(17) lighting, sanitary ware, handle, door latch installation.
(18) cleaning health, tiles fill joints, dismantling.
(19) decoration prefatory acceptance within the company.
(20) three formal acceptance of appointment, distribution owners.

92, the valve back together before the flue must be clean to ensure the valve can switch freely and able to open to the maximum, otherwise it will affect the effect of smoke hood. Ceiling can be installed to remain two not installed, so the hood and try and correct installation of the ceiling and then installed.

93, so much in the living room and dining room ceiling can not do not do.

94, take the line in order to better air-conditioned spaces, the power as much as possible closer to the air, so air-conditioned to see a length of cable, leaving a track of regret.

95, the house in person to measure and disc the various sizes available, can be Broche size chart size and then re-covered wire marked the final size will directly affect the decoration and furniture purchases.

96, the small size of line is not good if the co-optation is not all black walnut air, then the need for trade-offs, or to accommodate actual or dedicated their own motifs, of lesson, the best do both

97, began looking for decorators. In terms of personal experience, if it were not for particularly large family and plan to simple decoration, the guerrillas seem to find something more cost-effective. After installation it is best to introduce others, you have read and agree to the eyes, especially the consciousness of the human in charge of the decoration is even more important, liability and appreciation of how, some of the former is more fussy, because if I were you a stripped-down, in fact, those who live almost cheating the will to do, but the quality is good or bad may rely on a sense of responsibility.

98, the main furniture such as sofas, wardrobes, dining tables, chairs, cabinets, etc. in advance to see more of the best also, if the running around on tired, you can find a few good large-scale home shopping plaza shopping, the basic trend to see it, so then you have to do is slowly according to their lusted style percolate out the right things. Some people take a good style, some people have accurate grasp of color, it does not matter, anyway, there is time to consider, if you await until cleared decoration, furniture, help wanted to see the steps and then reluctantly adopted the unavoidable end will not really like it.

99, already optimistic about the best furniture to size down, and then to the room's decoration of the virtual future.

100, buy something necessary documents be sure to keep the move on the latter may exist back, a replacement is indeed serviceable. In particular, some important items of the store receipts, leaflets, etc., because a lot of things have a warranty period, certify lost would be more trouble.


101, the process of construction projects are sure to mushroom or reduce the cost they asked as and then write it in dark and pearly.

102, check for the necessary construction of protective measures, such as entrance doors to use jewelry cotton wrap, window and floor tiling good must be properly protected.

103, as much as possible to communicate with construction workers, to make sure whether he understands your purposes. Put themselves in respect of each teacher's work, respect, the magnitude of human feel at home, then began to live it more responsible to do so? There is an old saying not to ask (But if you are faced with treacherous cunning bully who, it would must revenge, dispute) of special note to some of the corner of the project is the need for several types of co-ordination, responsible workers with each other and coordinate their relative duties, Otherwise, we pass the buck back and forth, all pass the money. I like Mason to help me solve some of the carpentry of things, and electrical and solve some of Mason's problems. Because each teacher's experience is different, as long as he is willing to help you find a way.

104, do not do the best furniture firm, because it no longer may be some changes in the layout. If we do we must grasp the quality, or endless troubles.

105, be sure to change the water carefully, one costs money; second, if it were not for the ceiling from the floor must be laid down in water, if water problems big trouble.

106, according to their actual needs and reasonable arrangements for wiring, so as not to waste (especially the cloth with a lot of lights and lighting if it were not for practical, we must also attempt to dodge the sequence to use, garbage electricity), but some places can not be Province, for example, afterward to the bathroom mirror, and constantly with a hairdryer and razor; well inside or below if the shoe has a socket is also good, shoe appliance can singe, I am now very apologetic that no cloth lines.

107, the bathroom as wet and dry area, if the area is small with a pedestal like (special glass basin was dirty, idle caution); conditionally set a waterproof cabinet incorporating a small debris is best, put everything surely does not look good on the outside.

108, wood glossy white paint brush than when the nitro-polyester good (this is to listen to seasoned painters talk).

109, the cabinet must be chose carefully, to look at several of the quality, we go to do a solid strong as this one are easily thousands of sea, but also related to the stove and sink, etc., they still do not blindly greedy cheap good. But best not to do in the cabinet table or inside the litter can; if there is restricted funding, basket, basket seasoning, rice bucket of what you can do all of these accessories in the cabinets sell the company in general is very expensive.

110, wardrobe preferably than not less, rather large not small, women memorize! Hanging space to be able to put up the dress.

111, bad handling glass or mirrors in the vicinity of the best things to buy, or Be ready to transport methods.

112, curtains all the best in furniture, appliances and then customized approach to match the overall style tone. However, before cleaning the track can be installed.

113, alteration the gas pipe is best done ahead tiling, alternatively may damage the wall. Best to let the gas enterprise to draw a figure alternatively above the wall as one indicator, because the cabinet company to be required in the cupboard body beginnings.
114, cabinet installation time is longer, ranging from 4 to 5 hours, as numerous as 2 days, must be psychologically arranged. Installation can be used to check whether the material is that you set (you can see through the hinge aperture cabinet material). Installing kitchen cabinets before the first clean look, because once installed cabinets, no way those dead ends and then cleaned.

115, furniture installation is best looked at in the next, especially as the wardrobe of the laminates are several holes selected, I was not looking at the results too small a distance between the layers, hanging clothes stretch not open, even after correction.

116, taking into account the formaldehyde pollution of the environment, such as spider plants can be placed in the green room, furniture in all the open doors the emission of scent, but also buy a special spray to eliminate the smell of things to come.

117, installation of combustible gas, booking gas ignition.

118, brush wood of the time: the best Puwan other room painted tile or wood floors. If you must brush it, the best have the room cleaned. No floor tile or wood floor room, the room a lot of dust, then brush wood, then brush off the dust accessible attached to the wood surface, wood productions, have spiked sense does it feel, which although can be higher tag of sandpaper and then brush it afresh to solve, but in the end it feels to feel the brush and the overall effect will be deducted RBI hit. Room Puwan tiles and then brush, then the atmosphere of dust content absent from than the shop front, with virtually no brush another after the dust spliced to the wood surface of wood productions. This is so because when they sprint into a small decoration Wu circumstance, I had decided to buy in Canada Wood had seen it like a brush effect, and feel very smooth, feels like my home-improvement Howley, like wooden doors. Only because of the above, the results of the effect to play a lot of discounts, it has been a matter of apologize Xiao Wu. And and I like the union buy the paint process, the students also arose in this home. So here remind students to disburse attention to it. I do not know whether other wood case, but along to the conviction of same reason, so here caution students to pay attention to it.

119, on up painting: painting instructor pay is so dry and then batch finished wall putty, putty dry after painting. After brushing the paint if no reason is necessary to install lighting and a diversity of electrical switches. Ask something to install lighting and electrical switches to remind the teachers to pay attention to this and installed a clean Sin before hand, so that when installed will not be a dirty wall. Thus saving a touch-up painting processes the. Of course, soiled walls, the decoration is to make sure the paint department team to pay up painting again, that is to get clean and dirty walls (if the paint companies, they also allow teachers to pay to make paint, If you pay attention to what a lot of paint division will be left in the part after brushing the wall paint, which is the remaining part of the paint used to make paint). Just memorandum, do not let install lighting division to pay tarnished walls, you can pay less to make a tumble to the paint division (at least half a day), but also facilitate a lot of our own, then why not? Sometimes, with people easily, also has been easy. In general, paint the walls will be wood finish brushing before, this is to avoid the Wood in the process of dry brush will paint the walls of the wall impact. Of course, in actual operation, you can also Puwan after tile (floor tile wall putty prior approval has been good) painted wood, and other dry before whitewashing wood finish, but to do so, of course, will affect the period. If the terror of affecting the period of the case, but also in the air to reduce the effects of dust, then a lot of points to be hard-working about cleaning the room of the health of the.

120, the decoration team selection: The first choice guerrillas or formal company, I think is not important, the opener is to give you the head of the construction team is solemn and responsible, the decoration of the skills of workers, of course, the quality of the decoration and prices.
First, find the elaboration companies not more than four, for the most part,Cheap Gucci Trainers, so, if your time is very rich, it is another stuff. And decoration companies to talk approximately this before, must be clear that you have to do upkeep projects, you can phone the company reported that all the decoration items, compare prices and comprehensive afterward taking into account the retinue ingredients to resolve which items you absence to outsource Which item of decoration companies do.
the decoration of the people, the decoration of the offer as cheap as possible, of course, opposed to the outlooks of decoration company. Sometimes the decoration company to Mohr-McClune, will offer some of the weight is relatively cheap, this way, the quality of the projects and the quality of materials is more difficult to guarantee. Fitting so many, you want to single item is the lowest, it is unrealistic. And decoration of the offer, not only the number but also depends on the contents inside, the materials used in this project, descriptions, brands and so on. You know, the decoration of each offer, in fact, are of large accentuate.


121, the construction? Since I am in no hurry to move in, so plan to find fortuitous workers: the neighbors a good home please artisan, may be I look in the object: a mason, a woodworker, a plumber, a painter. Design step along step tread by step, I trust it slowly and deliberately.

122, to use every cent wisely: look at the decoration materials, they must be dazzled look, there are so many good things, and it seems every one looks the same, the economy can withstand . May be a short period of time required to purchase these things in place, the economic pressure is really big. Most people at this time is often in disorder, the result too much over budget the last one, the second is to buy good quality stuff at the United States, then buy something is irregular.
My view is:
one pre-determined price, after the election materials.
excess of the anticipated price of 10 percent-of material merchandise, do not waste time. Business consumers always nice too. I am doing a detailed schedule of materials needed in the future blog post will be posted for your reference.
Second, province to province, the spent flowers.
the most expensive place is carpentry, kitchen cabinets.
most prone to water quality problem places are transformed, kitchen water.

123, the spend of furniture than to buy some furniture. 500-700 yuan per square meter general furniture.

124, covert project was not the maximum essential area to retention money: water circle transformation, water management.
way to do is to ask B & Q, B & Q now have individual decoration services: such as water reform, since the buy of materials, water per meter of $ 40 per meter circuit is $ 20 for half a year engagement. B & Q on the first floor in the eastern of the detailed individual services and offer proclamation, we do reference

125,, the easiest way is to use online resources to collect, retain, finishing the integration, the future will be put to great use.

126, in order to save time, amend efficiency, decoration materials on the market each have a farm, a detailed and practical acquisition timetable and ration is important.
Program list by room category purchase is easier to implement: each took to the avenues to see things the same room, to assist approximation and comprehensive
attach, promising to have success.
one hall project
Second, the living room project
Third, the restaurant project
four master bedroom project
five children
six housing projects, study projects
seven main Health Project
8, nine passenger Health Project
kitchen project
ten, terrace engineering
XI Yin Taiwan project
are listed in the intend to put my own post favor the emulating chart, for reference: data in the table as an example.
This list is more convenient for procurement planning, pre-construction projects may be appropriate, by job re-classification of the combination, into masonry, carpentry, electricity, water, paint and other re-watch. The right side of the table can also be joined in the If (3 batches of 3 wall paint brush; shoe with Albert plate, brush polyurethane varnish), etc.

127, home cinema rear spokesmen, the sound to be embedded wires in the living room below, this is very important!

128, add a sink on the balcony, decorated to embedded pipes. Balcony sink is very important, gardening, washing hands.

129, toilet, kitchen need backdrop music, sound audio wires embedded before the renovation.

130, both sides must be left socket on the balcony, hanging lanterns, when the New Year, good power.


1: the bathroom is divided into wet and dry zone 2 wet areas of the floor drain on the better
2: If you burn normal gas water heater attention to the bathroom to have ample ventilation settings
3 - 4: If you do not know, then you can ask a professional friend to companion the master now prevaricate more.
11: hydropower, or find professionals to help themselves because the functions in this esteem he is to advise those who design their own needs to be transformed in the transformation of migration, merely if there are problems when the house until you have installed the
line problems and must re-do the demolition of the wall is a very huge pate thing.
12: toilet water to depend on their choice to tile bathroom floor tile is a professional waterproofing has to do this at time of purchase, but you can rest assured water to do well because of design problems in the choice of size If you encounter after the designers got the idea he would not cut off the bricks to fill the ground so that you destroyed the original design of good waterproofing, floor tiles, floor tiles are of course so early you can find out, but not your home is to live for decades we need a long-term guarantee so you must pay attention to the design of the bricks in the pavement without creature destroyed
19 when the medley is now bought ready-made cabinets are the most direct is because the family The water issues need to be near to establish the design, of course designers in addition to water designed to inform the designer must determine their own homes who are often under the kitchen cabinet so to better determine the scale so that when you cook at home more cozy with the cabinet panel recommended to choose such a large load to bear safe



white cement tile grouts and usage is not the same, but the masons are usually fraught with white cement tile grout filling method, so era, gone sealant, sealant, and a little bit better to be pointing to the wall instead of doing the paste. Also, the cabinet hinge, pool water, so use a good switch, while the cabinet fabrics, pool cell body, bolt can be used in general, of course, if you will not attention about the money.
If not a big package, I recommend to buy creating materials as much as possible to homes in the East, was home, B & Q and other places to buy can be returned.
131, at the entrance to the light switch, it is recommended to use sensor-based. Black daytime to go home, save the black.


132, shows a basic construction, water, electricity transformation
(a) the construction team on the water before entering the construction of a minute test, before they are allowed to change tubes.) and can knock down the plaster layer, load-bearing walls for installation on the
(c) in the buried line pipe Such as the need to change the original line, and can not use
(d) circuit to be buried in the dark wall of the best
(e) strong electric
(f)



133, waterproof
(a) kitchen, Wei
(b) 30 cm from the wall to do it twice, more than 30 cm can do it again, wrap need water at the door pocket door.
(c) waterproof finish to be dry, a Redo waterproof layer. Where leakage is most likely to


134, tile
(a) in the culling of tile owners of tile required for quality finds its way: first look at its color is uniform, non-variegated black blots and holes the line; followed depends on whether the standard of its size, the amount of tiles with the tape measure the length and width, measure the size of the trademarks to its factory the same size, then the amount of its diagonal tile, such as diagonal line, the tile is positive; then depends on the flatness of the tile, the most simple and telling method is to tile the same brand of two overlapping positive and negate, such as two stacked premonitory gap between the tiles or you can swivel the tiles uneven; last look There is no color tiles, and is out a few samples of the same type of tile, compared in the light, such as do not see color differences can be ordered.
(b) After the paste can not have a whole chip of brick tile hollowing (prejudiced hollowing the all piece of brick can not surpass 20 percent), if the plenary piece of brick hollowing be rectified, under regular circumstances, posted 100 per brick, brick wall tiles are allowed to have a hollowing, to allow two brick tile is hollowing, but must rework, rework the main material (already counted in the wastage of) from them, such as Over this range, the main material from the construction side is responsible.
(c) Normally, the level of tile degree of error of 2 mm is allowed, the gap be the same tiles, bricks and tiles should be flat on the corner (allowed error of 0.5 mm), kitchen, wall tiles in addition to health bricks and tiles should be flat on the corner, the need to level degrees (allow 1 mm tolerance) and perpendicular (allowing 2 mm error) to achieve, bathroom, balcony to the floor drain tile should be considered, you must first put away the slope, if there is no special reasons, there is water.
(d) in the wall and floor tile Puwan required after the


135, anti-termite
(a) and finish the wall after waste collection trough, a comprehensive anti-termite (ie, whole-house spraying of termite drugs)
(b ) After entering all the plates in need of anti-termite treatment (specifically for anti-termite wood like to do)
(c) before the need to shop for wood flooring wood floor to shop floor to do a termite treatment
(d) termites spray to wet the drug is better (you can clearly see the wet)


136, the computer is also a design study, and now the computer has multiple functions to set the decimal point, making computing time will have different standards, so we need to bring a calculator yourself, there are now calculated on a cell phone functions, but function is not necessarily good.


137, to prepare their own two good independent glass, plastic (1 clear, 1 white), recommended the U.S. General Electric Company, B & Q for sale, 49 a. In the installed bath room, sink, cabinets, security doors when they need it. While the general plant installation package will come with glass, plastic, glass plastic, but most of them poor quality, the future is easy to change color or moldy.


138, if only a last resort, do not use toilet seat shifter. This stuff is very likely to cause clogging toilet bowl water.


139, kitchen Lvkou Ban, hood top two, a good hole must be completely installed so hood up after security. An up my family's early and later time and remove the hood to install, disassemble dismantling equipment, workers are engaged in out of fashion, has chance a seamless ceiling ceiling of the seam.


140, if in mandate to unify prettiness, pantry and bathroom doors are installed, and that soon after installed in the door marked with ground cup joints where paste. I do not have time for the processing, water workers are not detailed, a lot of water splashed on the floor bleeding to the door skeleton, the following part of it has little black (mold) of the.


141, must be tiled balcony! King balcony to angle approximately to shop, shop to live with the railing to the balcony with the high. My family view balcony to balcony wall angle and the life is not paved, but to prepare a bucket of appearance wall, they periodically refresh ... ...


142, sealed in the wall before the water reform must permit the main to invest detailed decoration water map.


143, as if ready to brush the wall color, the transformation in the power line when necessary to take into account for the problem. Changed a lot of my family line, air-conditioning outlet bit all changed. But in order to save money, not for the whole line, but wiring. This wiring must be installed where the whiteboard for future maintenance. Later, brushing the wall paint color, etc. only to find how these white glare, regret ah ~~~~~


144, which is the lowest class I made an peccadillo, I presume namely the 1.5 m bed width is 1.5 meters, forget the thickness of the bed there. Very accurately in bedside bulbs to stay well behind of the wall socket. As a result, there is not socket to be blocking the access to use.


145, started before the skipper to make analysis of the wall decoration how to deal with the need to shovel out all the original powder. In particular, ready to paint the wall engineering companies outsourcing to students. My family is contracted out to paint companies, such as carpentry finished painting the walls look gray to know the original is bad, it is best to shovel out the whole re-Pihui. However, woodworking has been done, to shovel the ash out of the original bad operation. Finally had to brush the surface of a layer of glue Pihui 108.


146, increase the line will certainly be re-wiring. But from the nearest terminal branch wiring. The increase is not allowed in the original wire connector on the wiring.


147, air-conditioning control switch only in the power afford side. Added line on the road is not allowed.


148, change the location of phone and network lines, they can out of the original fabric of the line to continue to use. However, if the improper construction there will be many hidden dangers. So it is best to box from the room for weak lines.


149, the transformation of the workload measurement circuit, generally in accordance with the wiring in three different ways were fathomed.
(1) play slot pipe (measured by the length of trunking, if a tank more basis waterway, according to the number one half pipe the other half included in the overhead line).
(2) overhead line (wearing tube not play slots), calculated according to the length of pipe.
(3) for cord, according to how much even now the number of replaced (replaced the line to tell the construction team do not throw).
(4) weak transformation, according to the first method. The difference is who is to pay attention to weak-line purchase. Owners will have to buy less wire prices.


150, fixed the lavatory to the floor, hit the screw with it? There is convergence at the bottom and the pipe, to buy what were sealed and the outside is better: the restroom is nailed with the expansion screw. The interface between the base and the pipe at the inside with a special sealant toilet. + Out of white plastic with white cement slurry deployment. When the toilet is generally purchased with a special sealant.



151, buy the materials themselves must first calculate the resemble amount. To buy water when the material to do the latter anyhow, meditative about painting with the sea blueprint in the end how much material came out, so what little believe the boss, the result was found to buy water 5 meters, the actual use 27 copper published one, actually bought a 40, should the remaining 13, 7 short of the actual remaining six. Under repeated answering from other sites back up boss Detailed calculations of the pre-circuit their own material, the calculated results and after comparing the foreman of the requirements: from 30 m to 12 cable meters, network cable from 20 m to 13 m, other issues such as insulating tape, plug both large access was I correct ... ...


152, if the old water pipes under the ground, in counting to the drop when the switch is often damaged, do not hesitate to be arranging a new, do not save, to ensure safety .


153, the kind of retraction on the bathroom walls, the glove do not waste space, and posted a very good very nice tile. Of course, tile articulation that trouble to say


154, sun angle tile lines do not use the income side, 45-degree angle to grind bricklayer splicing was beautiful, of course, you do not choose Tijuana workers lazy way to do things.


155, aluminum pipe, when installed must be sealed cement workers under the supervision of the construction standards to allow expansion space for hot water pipes. Short plastic tube not closed strong, and lax some of the good thing.


156, auditorium bathroom on the ground if the percentage is tall, the conversion can be accustomed to solve the door stone.


157, plus move the sewer pipe mouth, then in the new and old sewer pipes should be checked before the entrance of the old sewer butt is smooth, this time a lot of money to clear the bit to avoid future trouble.


158, Lvkou Ban did not need to buy high-priced, very cheap Lvkou Ban the effect has been far better than PVC, the more money I can not see significantly different results .


159, buy Lvkou Ban particular attention to the keel and not Lvkou itself (Lvkou goal is not easy to tamper too much), usually on the keel complete ghost.


160, brick color is difficult to find satisfactory, I did not find, but the two kinds of color are not satisfied with staggered mosaic sub 45-degree angle I was able to achieve satisfactory results. This is indeed the bricklayer himself put forward good suggestions.



161, under the supervision of the ground water hateful to use my bricklayer but not directly in accordance with requirements of throwing on the ground, it can even do! It is not the best yourself, do not perturb but insistent.


162, the slope of the bathroom floor before tiling to consider the good, the incline is not in accordance with national standard to achieve the effect of fast drainage, and if you use a deodorant or a thin floor drain floor drain will be greatly additional drainage problems. Some people say that steep slope and beautiful, I think it is ridiculousness. On the contrary larger slope water to quickly run a clean is a very reanimating thing.


163, platinum-point doors fire with the LG panel, the effect is good, but if we might consider fitting tailor-made finished door. Hand-made door is not fine, for reference only.


164, sink a large market brand-name price is not cheap, brand-name quality crazy bad.


165, the balcony door is best to use the same type of fire board. Balcony environment is bad.


166, bathroom vanities to do when the first cabinet to consider the size of the basin so that the future good eligible.


167, the glass is cumbersome stuff, the best buy in the neighborhood, or Be ready to transport methods.


168, install the lock bolt head to pay attention to some wax, wax on and then crashing too late. If you do not smoke, then also pay attention to the door handle to prevent wall damage.


169, matte paint is pretty high and light, do not listen to the painter, and if a bad brush matte painter said that its technology must be bad. Similarly, if a good painter, said polyester polyurethane is not cheat your


170, with insulating tape and raw materials do not buy in the store, large supermarket quality was many better, and full weight, conversion down the price is not priceless.



171,Mens Gucci Sneakers, if the re-decoration will be used instead of talc putty finished, no big reason is that ended product easy to use putty. Fired the painter, especially after his own experience when diy - talc tone putty sick of it.


172, installation and air leakage protection switch junction box of the project can not be provincial, but not on the outside to be on the interior, the original will want to save wages outside the old junction box use, recommendations on the interior to get a new electrician, he now found it very valuable suggestions. On the interior door is not hideous, it really easy to use!


173, massive internal chart company directly to laborers on site clearance work package may be more appropriate, and better technology, tools, more


174, and air leakage protection switch to use the brand name. I use the Want to buy the real thing is simple, direct phone check MGE headquarters phone number, and then played to ask the local branch number.


175, the audience delicate pots pots than on stage, good-looking, good cleaning.


176, basin faucet with the audience to pay attention to, taking into account the thickness of the basin edge, leading to the mouth longer.


177, the hole before installing the toilet is a big, large floor drain cover can fall off, if your floor drain has been installed and the toilet is not installed, do pay attention to the floor drain cover, or the floor drain cover it up somewhere custody 也好.


178, buy silicone, then the perfect best all imports of GE, GE followed by Shanghai packaging. Of course, if the kind of place in a very important unit 7,8 can also be used, for example, aluminum window frames with internal Anjiu levels of silica waste to plug the whole. But use the bathroom all the GE silicone kitchen, worth for money!


179, triangle valve should not be disregarded, and save much money, if the valve, then triangle, triangle valve can be installed in advance of copper joints are not leaking, if it were not for installed, only the last copper fittings installed on the faucet to take over the baby when it was installed to check whether the internal leakage, the total leakage deserving to pressure some time to test out the final installation of internal and leading it more safe.


180, even the memo has been renewed to do about those things, their own can do it, do not, but also with the idea, please decoration companies to communicate more with the designer, please construction team to communicate more with the workers, because the realization of your ideas, to rely on them.




181, fitting the biggest problem is communication!


182, is not the place, type of kitchen cabinet door designed, BH. Should be designed L-shaped.


183, general decoration, decoration companies, excluding the prim management fees, taxes, fares accounted for 75-80 percent sign materials, wages account for 20-25 percent sign.


184, in the kitchen to go outside the ground water, since home promotion is to give a time bomb, who state clearly whether Shashi Hou for his difficulty.


185, if the separate tube wear, but in a tank, the shock it? Effects can endure


186, ask what between the dining and alive chamber separated by the most cost-effective package door pockets, side bag only 6 cm or contaminated with white, height 2 m is not significantly large High raw.


187, respectively, to strong and feeble electrical transportation pipe, can be separated away the best, keep the distance 10 cm or more, but it can be difficult, because most families to save money and open a slot. Weak sound the same line can perforate the tube.


188, inside furniture, paint and paste board can do a good job and opened the door and ventilation doors and windows at home, only to non-pungent odor. In fact, you are using a good wood core board, do not deal with furniture inside.


189, PCT board and the cabinet can be lumber essence embark 15, the back of the 5 accessible folders, Wuli. Package doors and Tizi use 9 per penny. Different processes with different materials.


190, PPR pipe not only for cold water pipes, also applies to hot water pipes, and even clean drinking water pipeline. PPR pipe interface with hot-melt technology, are completely integrated into the tube together, so once installed pressure test, no leakage. PPR pipe and will not scale. PPR pipe scale never known, never oxidize, never leaks, high water of green materials.


191, paint board is good, the conveniences of either wood and composite.


192, do not print for a long time on the rainy false stone, unless you want to dry a printing table; not take long watery cutting board on the table. Wood wet sometimes discolor; rub the stain with a steel pellet, like hand squeeze pimples.


193, can use an mediocre gas meter cupboard door sealed in it? Need to use the shutter-type door it? Regularly check the airing opening on the line.


194, clear contracting the tx Please note that you must verify the renovation team to open a list of materials. There may be certain about their estimates, I too believe that they, and the results to buy wire and cable management almost doubled.


195, the size of decisive planned sanitary ware, the best sketch in advance, count the size.


196, buy the product the students pay attention to the door, if you want to chase results matching panel with a business package Door, then you may must be Henzai sword it!


197, Re: installation of water pipes before they take the leadership and basin, sink have bought?
not, just make sure where is the basin faucet, bathtub faucet, washing machine what's on the line leading, leading 99 percent sign and fell into the water are in line with worldwide norms, by the time workers are not careless, all right. If you own basin cabinet, basin bought in advance, or optimistic about the size. Determine the amount of elements in front of the sink a good size, front loading station to buy Haojiu Xing, do not forget the audience or on stage. Distance between hot and cold water pipes with cement tiles must be sealed before the 15 cm accuracy, and must be parallel. If you have bought, it is best put something, such as sealed after the unpack.


198, if using an 8-core cable in the meantime take the phone and web, will not mediate with every other it? Not. 1,2,3,6 hit the cable module, 4, 5 playing on the phone module, and the other two easily. Right in saying that my experience: 10M 1236 100M to be used with the fact that the speed to 10/100M that we will not feel any distinction if using a 8pin line, then some program-controlled switches whistle will cause the web marking interference in the home context generally will not have any problem. But rest assured that I can suggest such a separate route to the future, leave margin, cable is very cheap you say?


199, check the delivery box must be properly installed.


200, fitted bath and shower faucet course taps joined to the tube is embedded in the wall, I have repeatedly told them to get exactly measurements, do not install while the time is not on. The results left the peppery and chilly water spacing is 15 cm, can be hot and chilly water pipes are not collateral, the results of the water feeding the electrical charge of the coerce was the nestle. Yesterday I base that fb GROHE thermostatic mixer wrapping even be forced cracked. We can be installed if the chairman, the first installed it. Should be the 1st governor to buy back, and then setup hot and cold water, tiled bar. Oujia bought a very early guide, is Oujia master to buy.
  Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT. The time now is 11:52 AM.

 

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum