Quick Search


Tibetan singing bowl music,sound healing, remove negative energy.

528hz solfreggio music -  Attract Wealth and Abundance, Manifest Money and Increase Luck



 
Your forum announcement here!

  Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums > Free Advertising Forums Directory > General Free Advertising Directories

General Free Advertising Directories This is a list of general free advertising directories.

Reply
 
Thread Tools Search this Thread Display Modes
Old 05-26-2011, 01:54 AM   #1
ertr7505o
 
Posts: n/a
Default 200 elaboration tips ( marital , nomaritaled have

1, the partition will not be the first shoe, leaving a little space so that the shoes can leak into the bottom ash, sink and gas stove top mounted lights. Given the location of the bathroom floor drain must first think well, a good amount of size. To drain the best side in the brick, if the bricks in the middle of it, no matter how kind of tilted blocks, floor drain will not be the lowest point.

2, lavatory, wind conditioning, not channel chart switches. Especially the lavatory water heater to a couple of level alternate with a plug appropriate. To off to electric, pluck the plug risky

3, on the brick part of the treatment of sun angle, the final thinking is to look at the workers level. If the level of good workers, plasterers, and better tools for grinding ceramic tile, they should not hesitate to choose the practice of grinding a 45 degree angle. In effect, at a time a good grinding, grinding angle of 45 degrees in the positive approach is the most beautiful! If the level of the workers do much, then you still choose to be positive angle, because the bad grinding angle of 45 degrees angle of approach is not as yang effect of story.

4, line up the pipes after the water pressure test is also very important. Test, we must be present, and the test for at least 30 minutes or more, conditions permit, rather an hour. 10 kg of pressure, without any rebate before the final test.

5, when the steel doors steel door must be considered a good size wall frame protruding inform the installer, making the final frame and affixed to the wall tiles are flat finish, so not only beautiful, and good health to do.

6, carpenters and masons of the package Door tiling is to knot in, including door pocket of the time, to consider the emulating ground (the ground side of the door both side) is also affixed to ceramic tiles or other cement mortar thing, because if you stick tiles Mentao well before the hook has been package to the ground, with cement when the future, if the cement and Door stained, moldy water will cause wood Door

7, under the bed and the mattress board must be breathable. Bed board is best for general use cedar board

8, do the paint as much as periodical tape

9, buy a lamp to note: General tried to use glass, stainless steel, copper or wood (shelf), and generally do not buy any other coatings plated steel above, ah, ah nobody like paint, easy to fade.

10, washbasin as ceramic pots, glass pots downright Health

11, water and electricity to its own transformation plan, and ask them to open Cao straight line. Watching them draw their own line, the entire line open by painting Cao. Each have their own acceptance Caixing.

12, water must be good, be sure to test the water!

13, many of the construction of a verbal accord into the gap checkout massacred, must be written in black and white, a change in the project are sure to ask what the price, write it!

14, ground floor, if installed, to re-do all the ground re-smooth layer of cement.

15, the kitchen door, or to make a wooden decoration hanging rail wood doors for good.

16, the living room as much as possible to install the power plug.

17, is still to be done outside the bathroom shower partition. A shower curtain can not pull the easy way erroneous, real inconvenient, water everywhere.

18, do door and frame materials to choose fine grained materials.

19, before installing the cabinets must be sure your home water is OKAY.

20, kitchen floor tiles will not pick white.


21, ceiling, pay special attention to flat putty before wiping Dulux

22, the number of living room lighting should not be too light, easy is better, or like the lighting mart!

23, to buy things that need to be installed as the installation requirements of jobbers, it does not include installation, it must cling to only pay the full paragraph after the installation! !

24, the renovation period, before you gather from affair card contractors carry

25, Lvkou Ban the protective membrane is best cleared before installation.

26, shoe is best to use curtain doors, deodorant. Edges can leave a shoe outlet, to plug drying shoes.

27, cutting and a small safe place to light.

28, it is convenient restaurant exhaust flare can also be safe, so when you eat hot pot or do not dirty grill houses the Office of the ceiling.

29, the door is best to prepare a place debris in the cabinet, can be placed on altitude of shoe. The general things, such as umbrellas, bags, scissors, change, dine the medicine, and so on there, so it is convenient.
30, there is no need to use your ceiling, if I were you too anxious almost moisture and cooking fumes, moisture-proof gypsum scrubbing brush is suggested to use waterproof paint, my health to do a visitor, very smart. If you must use Lvkou Ban smallpox, it is recommended:
1, not too expensive.
2, using the web color, especially in the kitchen ceiling, white on the good, the color white unless and decoration style match, it will easily incongruous.
3, download their own ideas, do not believe selling the vision of smallpox, their vision was warmhearted taint.
4, staring by himself in the scene, closing side namely very essential, do not let them slack, or depart a dark suture, how apt look how ugly.

31, the third day and proceeded to stick largely perforated tiles, range hood, and water heaters to pre vent lay, and if so then perforated tiles stick better, not easier. Therefore, before the renovation must be chose in the range hoods, stoves and water heaters, to determine the size of punch.

32, nevertheless taking into account the custom-made cabinets look good, but not durable,GHD IV Mini Straighteners, comprehensive views of some of my classmates online and experience, to counter the framework of using cement to do, inside and outside the sides stick tiles, marble countertop shop, wall cabinet and cabinet wood door or chosen to do. Out of the cabinet to do so durable, moisture-proof. And spent different few. Read a good many of his neighbors say, I did not thump.

33, well after the door pocket, plasterers plaster line to start the installation, wall Pihui works. Comparison of the wall of my house was originally formed, accepted 2-3 road on it. Pihui acknowledged when a gray polished once, and then brush the handbook, sanding anew, after brushing, and finally twice with ICI paint brush, the entire wall looks smooth and smooth, really good. Upon achievement of the ceiling wall, a carpenter started wardrobe. Albert wardrobe is 18cm's license Daixinban do paste veneer outside, although there is no furniture store to buy so good-looking, but durable, quality should be better than to buy. I'm not afraid of standing receptacle board. I am afraid that is insufficient to buy. Backplane is relatively thick, buying is skinny.

34, other students in the tiling must pay attention to the following points:
① best he can in the scene.
② some less than perfect tile can attached in the future some workers do not watch the location, such as cabinets, sinks, mirrors backward, but also pay attention to tile, brick, etc. Do not waist is more than the workers spliced to the position, otherwise You can not see anything in the future, but also wasting money.
③ wall tiles, floor tiles in the paste before the flood damage must be enough time.
④ sure to floor drain plug with something good out of cement down to prevent clogging. My family just because off the cement floor drain is blocked, and spent 30 looking for the management office to clear, wake a lot of small mire.
⑤ people at the scene, the workers will not be too wasted tiles. Tiling my family when not at the scene, then go, wasted a lot of bricks, it is the heartache, all the blood and sweat Mimi Yeah.

35, a wall of long, high. Such as a bathroom with four walls, each wall should meter out of its long, high. And then deduct one of the windows and doors of the area. Finally, a numerical ground area. After the size of the measure you can also get a sub shop selling tiles, they will help you re-match. Loss of 5 percent-plus on the line.

36, the best is a two bedroom ceiling light control, and a door, a bed, lying on the bed save the winter and then it turn off the light.

37, the socket must be thought a agreeable position, elevation, interval. Even premier met playing steel cassette position, the latter is found to equitable be put away the journal television cupboard, microwave ovens, desks block, had to push the situation of the 1st 2 tall furniture, and eventually base not only ergonomic height, but also can not purchase a good appropriate stainless steel cupboard legs, can only be made of aluminum foot.

38, just around the edge in the hallway of the tube with a good, sunny and have that effect.

39, did not take into account when loading the table bulb nestle, it lights not in the middle of the table.

40, bathroom tiles do not use too much pigment, one easily dirty, and second, a long time, too dim!


41, outlet to more equipment, furniture to buy outside the ground to sand security to consider, like to see more housing, in principle, should adhere to.

42, Lvkou Ban did not need to buy high-price, very cheap Lvkou Ban has been far better than the effect of PVC, the more money I can not see significantly different results. Buy Lvkou Ban particular attention to the keel and not Lvkou Ban itself (Lvkou Ban goal is not easy to meddle too much), the keel often complete specter.

43, the color of brick is hard to find satisfactory, and I did not find, whatsoever, not satisfied with the color of the two sub-cross mosaic is a 45-degree angle to achieve the results I am very satisfied. This is indeed the bricklayer himself put forward good suggestions.

44, on the balcony on the top sideboard, then hit the back of the cabinet with a layer of waterproof insulation foam board works well. Balcony door is best to use the same type of fire board. Balcony environment is harsher.

45, if no suitable molding may wish to custom, custom quality seems better than the sample also. More personalized and customized.

46, bathroom cabinets with stainless steel legs are colossal profits to find some local stores to buy back price of crazy cheap.

47, install the latch lock pate should pay attention to some wax, crashing to a December to late. If you do not smoke, then the door handle must be taken to avoid damage to wall.

48, Paco the floor well, I like to caution that the only directly to the boss about the price and the seller speak about than the price better.

49, matte painting is beautiful than the high light

50, if the re-decoration will use putty instead of talc products.

51, installation and air leakage protection switch junction box of the project can not be provincial, but not on the outside to be on the interior, the original wage will want to save the old junction box outside use, electrical propositions put new ones in the room, and as long ashe suggested this valuable.

52, and air leakage protection switch to use the best brands. I secondhand the Want to buy the real thing is simple, straight call MGE investigation headquarters phone number and called to inquire the local branch number.

53, the audience delicate pots pots than on stage, good-looking, good cleaning. Basin mixer with the audience to pay attention, taking into account the basin edge thickness, leading to longer mouth.

54, without anybody revision of the wall angle is also very beautiful, but to advance the stage of looking for the painter and the painter clearly put ahead. angle Ding Jiaoxian do help to activity the straight line.

55, online slots before the cement surface, surface treatment approved putty is very important, for no solid surface with a clean ball treatment is very appropriate.

56, make plaster suitable for a large hole on the wall, of course, if the hole is too big or need to use cement.

57, frosted glass on the back do not coated with paint to defend the hard to clean!

58, Caipen chairman can be sure to switch back of the hand, that must be not easy to keep clean fingers, hand corner up when the oil is also difficult.

59, the price of luxury auto racks too much water, and found a number of relatively nameless mark in the structural design on the front line rather than the brand, the price is much lower.

60, could be considered safe on the ground of the metal socket, this socket 100 is very valuable, but very convenient, commonly flush with the ground, the foot can plug a foot to pop up. Suitable for large living room. Or on a dining room table, below, is used to insert hot jug (to prevent hanging back and forth when moving wires)


61, storage room. TX has been said, but I did not do doors, looks very beautiful and easy to put polluted clothes in the cupboard.

62, starting bed skeleton (which is so called up.) I am a professional company to buy the cloth-bed bed, and spent 350 yuan additional such a thing, end of the bed there is a pull deal, the bed board will be turned up, exposing the bottom of the cache space, what a large Oh!

63, is not practical double bar towel rack! Like the present and uses a single rod, hanging wand base layer will not look forside and then drying towels

64, inside the cupboard that the trash is insufficient practical, than on the outside. There do not install the door panel of the trash bin and table, open the door when the summer will be very smelly. Trash or on the outside good.

65, the table next to the small cabinet, and can be placed on some stuff, very convenient.

66, to I think the mop bucket less demanding in terms of performance, one can assemble themselves out of covered and the surrounding environment that is consistent with tile or mosaic appearance, and money.

67, the bathroom can point nail nail to hang something in the hook.

68, designed a bathroom cupboard put clothes, no longer have to anxiety about bathing forgot to clean clothes.

69, washing machines with drying is not solemn and practical, in addition to one annual, only the yellow mold-day, and the malign giant. Thick clothes, towels or drying leave, let the sun buyer disinfection to be good. Even amplified, you need to save the point of silver.
70, even in the laundry room to do a laundry tub, used to hand rinse something. Originally thought to use less, so buy a very cheap Terri leader. Did not muse this is really convenient laundry bucket, became my most frequently used a washing area. What rag ah, ah socks, and towels, ah, all washed in it, and even most hands there too.

71, fitted with lights really not practical, the decoration done up to now not opened. There are just SHOW guests to look at lighting, I simply forgot their own also installed a this thing. When the original is to open PARTY under mythological, and now do not have much accident of prologue spot.

72, the biggest lesson studied is that in fact the simpler the better fitting, less pollution, less money, truce of idea.

73, useful stuff:
① designed storage room.
② North Terrace sink used to wash the dirt. Differences between the washbasin and toilet and washing vegetables for the kitchen sink.
③ bathroom can be pulled out of the leadership shampoo. (TX shampoo basin was never an exception.)
④ easy to clean the floors and the appropriate cleaning tools.
⑤ work lights the kitchen table.

74, buy a toilet must be a good amount of their own pitch, or go buy a return that is really ... ...

75, Bath and Kitchen floor tiles stick better after a good amount of what the sometime did not do the level of the lowest point is not looking at the floor drain, or other teams did and decoration after passing, a lot of die compartments.

76, window beads Angeles with the Great Wall of stone tiles is a 800X800. Manufacturers cut and edging, Mason posted. Pattern did not look good also
radiation.

77, bathroom shower room must be large enough size, and use perspicuous cup,GHD Deluxe Midnight 2011, shower in it will not appear so cramped.

78, should not use white cement tiles pointing hook. Did not become a black month gap, ugly decease. The results they have bought their own hook pointing surrogate, that tired

79, the cabinet should be pad under the artificial stone after the board, with the result that there is no installation, it can not cut the meat in the above, agreed to give me almost two months have not installed installed (only to slick once).
80, do not confuse the letter designer. Of course, you can visit several decoration companies and more, from the design in each extract something really useful, the key is what you want to dress up like home correction.


81, if the floor drain has been installed by the original developers that hinder foul of the

82, bathroom tiles affixed to the ground after a good test the water, if water is relatively slow to rework swiftly. Our household's water is relatively slow, then relented a bit, it was always a little bath water, and made hundreds of our main Guardian have sleepy money in the shower head, and surprise how the total now relief.

83, fitted wash basin and mirror to be considered good, put brush glass shelf, towel rack relating position.

84, bought the mirror to consider the position of mirror front lamps, and if do not want to install a short-lived mirror front lamps, mirrors the size of the cover for the mirror to be able to set aside the line of the best light.

85, put washing on the balcony to be a small cabinet, easy to put some debris, such as washing powder within the debris. Both beautiful and practical

86, must be staring at the upstairs upstairs to do down the trickling water .... otherwise, get the wall cabinet, the wall is a muddle ....

87, do not blindly follow the online buy, I later found that some themselves to buy cheaper than the bargain.

88, TV backdrop will set up a few more outlets, TV, DVD .... a put, you will find enough outlets.

89, change the water well in the future to be considered before loading in the wash basin in the majority sample, for instance, the left or right pots pots, water and drainage that is located in what place. Otherwise, changing for the better after the finding period of the wash basin was not fit!

90, on the curtains, we had better put your linger a size goes, the foreman can not be less that size. If less, then, how how the. Or watched him cut his napkin.

91, the decoration of the construction process:
(1) approach, wrecking down a wall.
(2) bathroom, kitchen floor to do 24 hours off water tests (required the developer to complete this mission.)
(3) cutting trough, water, electricity transformation and acceptance.
(4) sealed underground water invisible trough renovation project without closing the water leakage test started waterproofing.
(5) bathroom, kitchens wall disk.
(6) Carpentry approach, suspended ceilings, plaster moldings.
(7) packages Door, skylight cover. Making wooden cabinet frame.
(8) concurrent production of wooden doors, plastic doors and even pressure.
(9) wooden panel paint brush dust (food vegetable fuel).
(10) leveling the table arranging cruel windowsill.
(11) wood neat panel, pasted, fine line production and installation.
(12) wall primary treatment, grinding, leveling.
(13) belongings, the door seams paste stickers (protected side).
(14) ICI oil for at fewest three times the wall.
(15) furniture painting approach, eye patch and paint.
(16) dealing with corners, laying floor tiles, wood or composite wood flooring, waterproof marble bar, skirting.
(17) lighting, sanitary ware, handle, door lock installation.
(18) neat up, floor tiles make up joints, dismantling.
(19) decoration preparatory approval among the company.
(20) three formal acceptance of assignation, distribution owners.

92, flue gas valve back together, be sure to clean and assure the valve can switch freely and to able to open to the highest, otherwise it will affect the efficacy of cloud hood. To remain in the installation of two ceiling is not installed, so hood and attempt and correct installation of the ceiling and then installed.

93, so much in the living room and dining room ceiling can not do not do it.

94, good air conditioning in order to take the line position, the power closer to the air conditioning as much as possible, so install air conditioning power ligature to see part of it, leaving a trace of regret.

95, to personally measure and log all the available house sizes, size map will be covered 楼书 elements and then re-wire tagging, the final size will directly affect the interior design and furniture purchases.

96, line a bad choice if small size of the black walnut is always enough air, then need to have choice, or to accommodate actual or attached their own ideas, of course, be both the best

97, began looking for decorators. To private experience is concerned, if not particularly large size and planned to simple decoration, it seems more cost-effective to find some of the guerrillas. After installation it is best to introduce people, you have peruse and admit to the eyes, especially the consciousness of the human in charge of the decoration is more important, liability and gratitude of how, some of the former is more critical, because if necessary a stripped-down, in fact, those who live almost on the outside will do mix, but the quality is good or bad may depend on a sense of responsibility.

98, the main furniture such as sofas, wardrobes, dining tables, chairs, cabinets, etc. had better take a look for advance, if the sprinting around on the tired, you can find a few good large-scale home shopping plaza shopping, the basic trend to see it, so the next thing you do is based on their desired style percolate out the right things slowly. Some people take good manner, while others grasp of color standards, it does not material, anyhow, there is time to consider, if you wait until clearance decoration, furniture, help wanted steps to go in the last will reluctantly accept the unavoidable and not very much.

99, has been bullish on the furniture is best to size down, and then to exhibit the future situation of the virtual room.

100, the needful documents to buy something good must be maintained, a move that may exist on the post-retirement, a replacement will definitely behalf. In particular, some important items of the store receipts, leaflets, etc., because a lot of things have a warranty period, the certify lost would be more trouble.


101, during the construction projects are sure to increase or dwindle the price they asked for and then write it in black and white.

102, check whether the construction is necessary protective measures, such as entrance doors to use pearl cotton wrap, a good window and floor tiling also appropriate protection.

103, as much as feasible to communicate with construction employees, to resolve whether he understands your intentions. Put ourselves in every esteem the work of the main, adore him, and people feel the magnitude of household, and began to live to if it is more responsible fjust aboutme of it? Saying works, is not cried (But if you face a treacherous cunning tease, who, it would have to retaliate, dispute) in particular to some peripheral projects is the need for co-ordination of several trades, the laborers will be responsible to each other and coordinate their relative duties, Otherwise, we pass the buck back and ahead, always pass the buck. Like my mason to help me solve some carpentry thing, and electrical and decided some masonry problems. Because each teacher's experience is alter, as long as he is compliant to help you detect a course.

104, do not do the best furniture fixed, because it no longer may be some alterations in the layout. If we do must grip the quality, or endless distress.

105, be sure to change the water carefully, one charge of money; Secondly, if you do not need from the floor to the ceiling laid down water pipes, water pipes in case of a problem to big trouble.

106, according to their actual needs reasonable preparations wiring, so as not to waste (especially the cloth with a lot of lights and lighting if only practical, we must also try to avoid tandem use, waste electricity), but some places can not be Province, for example, next to the bathroom mirror, hairdryer and shaver to often; well inside or below if the shoe has a socket is good, can singe shoe device, I now regret not quite this wire cloth.

107, the bathroom as wet and dry area, if area is small with a base like (special glass basin was dirty, lazy with remind); conditionally set a waterproof cabinet incorporating small debris is best, put everything certainly does not look good on the outside.

108, wood glossy white paint brush when the polyester better than the Nitro (which is to listen to experienced painters talk.)

109, the cabinet must be carefully chosen, likened to more than a few quality, we go to do a solid firm, because this one is easily thousands of sea, and narrated to the stove and sink and so on, so it is still not to indulge in corrupt cheap good. But best not to do in the cabinet table or inside the litter; there is, if asset are restricted, basket, basket seasoning, rice bucket of what you can do all of these components in the cabinets sell the company in general is very expensive.

110, wardrobe rather more not fewer, rather big not small, the women remember! Dangling from the longest space to be able to wear down.

111, such as glass or mirrors not handling things the best buy in the neighborhood, or first think of a good means of transport.

112, curtains, furniture, family appliances in the whole approach is best and then made to match the overall style tone. However, before cleaning can trail installed.

113, gas change management best tiling complete, or there may be harm to the wall. Best to let the gas company to draw a blueprint or on the wall as a character of the company to be necessary because of the cabinet body openings in the cabinet.
114, cabinet installatiin season is longer, anywhere from 4 to 5 hours, or more than 2 days, must be psychologically ready. Installation can check whether the material is used in the kind of set you (the hinge hole can be seen through the cabinet material). Before installing the kitchen cabinets before cleaning it, because once the installed cabinets, no way those dead ends and then cleaning up.

115, furniture installation is best looked at in the afterward, principally as the wardrobe of the laminates are several holes on the alternative, I was not looking at the results of the small distance between the laminates, hang clothes stretch not open, even after the correction.

116, taking into account the formaldehyde pollution of the environment, such as spider factories can be placed in the green room, furniture doors open all the eruption of odor, but also to buy something special spray to eradicate odors.

117, installation of combustible gas, reservation gas ignition.

118, Brush Wood of the time: the best Puwan other rooms painted tiles or wood flooring. If you must brush, the best have to clean the room. No floor tile or wood floor room, the room a lot of dust, then brush Wood, then brush off the dust easily attached to the surface of wood products Wood, feels a tingling feeling, although this can be higher label and then brush again sanding solution, but in the end it feels to feel the brush and the overall effect will be a deduction RBI. Puwan brick room after the brush, when the dust content in the air before the shop a lot less than the basic Wood does not arise again after the dust brush appendix on the surface of the wood products. All that being said, because a small renovation to hit the Wu family situation, I had decided to buy in Canada Wood hello seen it before the effect of brush, and feel very smooth, feels like my home-improvement Howley, like wooden doors. Only because of the above, the results of effects to play a lot of discounts, it has been named Wu regret things. And I buy in the union hello the process of adding paint, some students appeared in this family. So to remind students to take note of here. Wood I do not know whether the other case, but according to the principle of same reason, so here to remind students to pay attention to it.

119, on the fill paint: painting instructor pay is waiting another batch of finished dry wall putty, putty is dry paint. After brushing paint loaded if no reason is necessary to switch the lamps and various electrical appliances. Ask something to install lighting and electrical switches to remind the teachers to pay attention to this and a clean install Sin before hand, so that when installed will not be a dirty wall. Will save a touch-up painting processes the. Of course, tarnished the walls, the decoration is to make sure the paint division teams to pay up painting again, that is, the walls will get dirty clean (if it is paint companies, they also allow teachers to pay to make paint, If you pay attention to what a lot of paint division will be left in the part after brushing the wall paint, which is the remaining part of the paint used to make paint.) Just note, do not let install lighting division to pay soiled walls, paint can make teachers pay less for a trip (or at least half a day), but also facilitate a lot of our own, and why not? Sometimes, with people easily, also has been easy. In general, a house painter will paint before brushing the Wood, Wood to do so is to avoid the process of dry brush would paint the walls of the wall clash. Of course, in substantial operation, you can also Puwan after tiles (floor tile wall of the putty has been approved before the good) painted Wood, Wood, etc. after whitewashing paint dry, but to do so, of course, will affect the duration. If the terror of affecting the duration of the case, but also the impact of the air to lessen dust, then point to a lot of hard-working to clean the room, the health of the.

120, decoration team choice: As the first company selected the guerrillas or the regular, I think is not important, the key is to give you the head of the construction team is responsible, the technical renovation of the workers, of course, the quality of the decoration and prices.
First, find the decoration companies not more than four, for the most partis this, if your time is very rich, it is another matter. And decoration companies to talk about this before, must be clear that you have to do renovation projects, you can call the company reported that all the decoration items, compare prices and comprehensive after taking into account the various factors and determine what the next items you want to outsource , which items to decorate the company to do.
the decoration of the people, the decoration of the attempt as low as possible, of course, inverse to the views of decoration company. Sometimes the decoration company to La Shengyi, will offer some of the heaviness of relatively cheap, this way, the project quality and the quality of materials is more difficult to vouch. Renovation so many, you want to term items are the lowest, it is unrealistic. And the renovation of the offer, you can not just look at mathematics, which also depends on the content of the materials used in this project, descriptions, brands and so on. You know, the decoration of each of the quotes are really quite an craft to.


121, the construction? As I am not eager to stay, it plans to look for accidental workers: your neighbors a good home builders are likely to become the thing of my looking for: a mason, a woodworker, a plumber, a painter. Designed to do step by step step by step, I believe, working slowly and deliberately.

122, to use every cent wisely: look at the decoration materials, he must be looking weary, there are so many good things, it seems, favor every unattached look, and economically skillful to resist . A short period of period to make all these things can be bought in place, the economic pressure is so big. Most people at this time is constantly in disorder, the results of the last 1 too much over ration, the second is the U.S. amount of the first asset to buy high quality, then buy something is mixed.
My view is:
one pre-determined price, after the election materials.
excess of the expected price of 10 percent-of material goods, do not waste time. Business is all nice too consumers. I am act a careful timetable of materials needed in the future will be posted in the post for your reference.
Second, you could save on the province, the flower to flower.
the most expensive place is carpentry, kitchen cabinets.
maximum prone to water quality problems is the transformation of the place, kitchen and restroom water.

123, the cost of furniture than to buy some furniture. 500-700 yuan per square meter of mediocre furniture.

124, covert project was not to save money the most important place: the circuit transformation of water, water management.
approach is to ask B & Q to do, B & Q now have individual decoration services: such as water reform, since the purchase of materials, water per meter 40 yuan, 20 yuan per meter circuit, with 6 months insurance. Details of B & Q on the first floor in the east of the individual services and pricing announced, we do reference

125, the most hassle free way is to use online resources, the accumulation, retention, arranging integration, will certainly be useful when.

126, in order to save time, enhance efficiency, each has a acquire on the decoration materials market, a detailed and practical acquisition schedule and budget is very important.
list by room category procurement plan is easier to implement: each took to the streets to see things the same room, to assist approximation and comprehensive
attach, promising to have success.
one hall project
Second, the living apartment goes
three, four restaurants engineering
, master bedroom project
five or six children
housing projects, study projects
VII, the main Health Project
eight, nine passenger
Health Project, the kitchen works
ten, eleven
terrace engineering, engineering
Yin Taiwan is now put my own plans like the table set out in the following post, for reference: file in the table as an instance. This list is used as a procurement plan
more convenient, the corresponding project ahead construction can be re-classified along to types of merger, into masonry, carpentry, electricity, water, paint and other re-tabulation. The right side of the chart can likewise add If (cream paint 3 batches of three brush; shoe panel at Albert, brush polyurethane varnish) and so ashore.

127, family cinema rear spokesmen, the sound cables to be embedded in the living room under, this is very important!

128, add a sink on the balcony, decorated to embedded pipes. Balcony sink is very important, gardening, washing hands.

129, toilet, kitchen need backdrop melody, audio and audio wires embedded before the renovation.

130, both sides must stay on the balcony outlet, Chinese New Year lantern, good power.


1: the bathroom is divided into 2 areas of wet and dry on the wet district ground drain better
2: If you are flaming normal gas water heater attention to the bathroom to have adequate ventilation to set
3 - 4: If you do not know if friends can ask a professional chef, accompanied by the now more than a prevaricate.
11: hydropower is still looking for professionals to aid themselves for the functions in this environment also accuse the design of their own lives who absence to be became in the transformation of migration, merely whether there are problems while the house until you have installed the
line problems and must re-do the wall torn down was a very big head thing.
12: waterproof bathroom of their choice should depend on the bathroom floor tile floor tile professionals are there to do this in the purchase of water treatment can rest assured that when you do bad, but because the waterproof design problems in the choice of size If you encounter after the designers got the idea that he would not cut off the bricks to fill the ground so that you devastated the original measures designed to waterproof tiles tiles of course, this is the early you can find, but not out live in your home is a few decades we need to ensure the long-term design, so you must pay attention to the bricks in the sidewalk without creature demolished
19 when the medley is now bought ready-made cabinets are the most directly is because the family The water issues need to be close to create the design, of course designers in addition to circle design but also inform the designers set their own homes who are often below the kitchen cabinets so the scale to better determine your cooking at home more cozy to use sheet metal cabinet recommended to prefer such a large load to bear safe



tile sealant and not the same as the use of white cement, but the masons usually use the usage fill fill white cement tile sealant, so that Time to go on sealant, sealant pointing to a little bit better and not dry the paste to the wall. Also, cabinet hinges, the pool water, switch and so use the good, the cabinet material, pond cell body, pins can be used in general, of course, if you will not attention about the money.
large package if necessary, I suggest to buy building materials to the east as far as possible to their homes, actually the home, B & Q to buy such a place can be returned.
131, at the entrance to the light switch, we recommend using inductive type. Black day home, save the dark.


132, note 1 basis construction, water, electricity transformation
(a) before entering the construction teams on the water to minute test, before they are allowed to change management.) and can knock down the plaster layer, load-bearing walls for installation on the
(c) in the buried line of control If the original line to be changed, and can not use
(d) circuit to be buried in the dark wall of the best
(e) strong electric
(f)



133, waterproof
(a) kitchen, health,
(b) 30 cm away from the wall to do it twice, more than 30 cm can do it again, mantle need the waterproof door pocket door.
(c) waterproof finish to be dry, the Redo waterproof layer. Most likely the leak is the


134, tile
(a) the owners is required in the selection of tile for tile quality finds its way: first, to see its color is uniform, non-mottled black spots and small holes the line; followed depends on whether the standards of its size, the amount of tiles with a tape measure the length and breadth, measure out the size of the factory size to be consistent with its trademark, the crooked and then the amount of the tile, such as the crooked line, then the tiles is positive; then look at the flatness of the tiles, the most simple and telling method is to tile the same brand of two overlapping positive and negate, such as overlap significantly after the gap between two pieces of tile or you can rotate the tiles irregular; last look There is no color tiles, the method is to take out a few examples of the same type of tile,GHD Classic Straighteners, in the light are compared, such as do not see the color inconsistency can be ordered.
(b) After the tiles stick can not have a whole chip of brick hollowing (local hollowing whole piece of brick can not surpass 20 percent sign), if the needs of the whole film Brick hollowing rework regular circumstances, Post 100 per brick, brick wall tiles are allowed to have a hollowing, brick tiles are allowed to have two hollowing, but must rework, rework the main material (yet counted in the wastage within) from them, such as Over this range, the main material responsible for the construction.
(c) Under normal circumstances, the level of tile degree of mistake tolerance of 2 mm, the breach to be invariable with tiles, bricks and tiles should be flat on the corner (allowed error of 0.5 mm), kitchen, health and brick wall in addition brick and tiles should be flat on the corner, the need to level degree (error to allow 1 mm) and perpendicular (allowing 2 mm error) to effect, bathroom, balcony tile floor drain should be considered, you must first put away slope, if there is no special reasons may not have water.
(d) in the walls and floor tile Puwan required later the


135, anti-termite
(a) punt down the walls and the trough in the garbage after, a comprehensive anti-termite (termites sprayed the whole house that drugs)
(b ) After the entrance of all plates in need of anti-termite treatment (specifically made for wood termite category)
(c) required before wood floor shop to shop on the ground to do a wood floor termite
(d) termites spray to wet the drug is accepted (you can clearly see the wet)


136, the computer is also a research dollars, and immediately the calculator has multiple functions to set the decimal point, making actions will have different criteria when, so we need to send a computer yourself, and now mobile phones have computing capabilities, but the functionality is not good.


137, two better prepare themselves independent glass, plastic (1 clear, 1 white), recommends to the General Electric Company, B & Q for bargain, 49 a. Pretending to bath room, sink, cabinets,GHD Blue Straighteners, security doors when they need it. While the general factory installed package will come with glass, plastic, glass plastic, but most of them penniless quality, easy to change color or mold the future.


138, if it were not for a last resort, do not use toilet seat shifter. This matter is very likely to cause clogging toilet bowl water.


139, Lvkou Ban kitchen, two upon the hood, open the apertures we have to await a good hood completely up security after installed. An early and I go home, and after removed to install hood Shiyou, apart and put them all out of fashion by workers,GHD Green Straighteners, seamless ceiling has transform a ceiling joints.


140, if the purpose of uniform outward, is also fitted kitchen and bathroom doors, and that soon after the installation on the door marked with the ground glass joints where paste. I do not have time for processing, water workers are not cautious, a lot of water splashed on the ground infiltration to the door frame, the following portion of it has been a little black (mold) of the.


141, must be tiled balcony! King balcony to angle approximately to shop, shop to life and railings to the balcony the same height. My view balcony to balcony wall angle and the life there is no shop, had arranged a tub of wall paint, reanimate yourself on a normal basis ... ...


142, sealed in the wall of water reform must permit the decoration to cater detailed master water chart.


143, if the paint color for the walls, in the power necessary to take into account the time for transformation of the line problem. Changed a lot of my family line, air-conditioning outlet bit all changed. But in order to save money, not for the entire line, but the wiring. This wiring must be installed where the whiteboard for future livelihood. Later, brushing the wall paint color, etc. only to find how these white glare, rue ah ~~~~~


144, which is the lowest level I made a mistake, I assumed that 1.5 m bed width is 1.5 meters, forget the thickness of the bed there. Very accurately in bedside cabinet to stay well behind the lamp socket on the wall. As a result, there is no way to block the outlet used to be.


145, started before the captain to make the decoration of the wall how to deal with the need to shovel out all the original powder. In particular, prepared to paint the wall works outsourced to the company's students. My family is contracted out to paint companies, such as woodworking look after painting the walls gray only know thatit is bad, it is best to shovel out the whole re-Pihui. However, wood has been done, to shovel out the ash is not good the original operation. Finally had to brush the surface of a layer of glue Pihui 108.


146, increase the line must be re-wiring. But the final from the nearest branch wiring. The increase is not allowed in the original wire connector wiring.


147, air-conditioning control switch only in the power supply side. Added on the line is not allowed.


148, change the location of tel and network cable, when the original linen of the line can be drawn to continue to use. However, if the unfit construction there will be many hidden dangers. So the best room of the weak from the box to be replaced.


149, measurement circuit transformation workload is generally in accordance with the wiring in three different ways were measured.
(1) play slot pipe (at trough length calculation, if a tank with multiple basis canals, calculated according to half the number of tubes. The other half included in the overhead lines.)
(2) overhead line (dressing tube not play slots), calculated according to the width of pipe.
(3) for cable, according to the number even now the number of replaced (replaced the line to narrate the construction team do not dart).
(4) weak reform, according to the first method. The difference is who should pay attention to the weak line is purchased. Owners will have less to buy wire prices.


150, how the toilet fixed to the floor, hit the screw with it? There is assembly at the base and pipeline, to buy what were sealed and the outside is better: the toilet was fixed with expansion screws. Convergence at the base and the inside of the pipe with a special sealant toilet. Out of white plastic with white cement + water slurry deployment. When the toilet is generally purchased with a special sealant.



151, buy materials, we must first calculate your approach usage. To buy water when the material to do anyway, after preoccupied about a painting materials by sea chart in the end how many came out, so little confidence in a little while the boss, the outcome was that buy water 5 meters, the actual use 27 copper head months, actually bought a 40, should the remaining 13, 7 short of the actual remaining 6. Under reiterated questioning of the foreman back from the other site Details of their pre-calculated circuit material, the calculated results and after comparing the foreman of the requirements: from 30 m to 12 cable meters, network cable from 20 meters to 13 meters, other such as insulating tape, plug had great way was I correct ... ...


152, if there are old water pipes under the ground, in addition to switch hit, it tends to be damaged, do not hesitate to be the laying of new, do not save, to ensure safety .


153, bathroom wall that retraction of the glove do not waste space, and posted a very good very pleasing tile. Of course, that tile alliance trouble saying


154, do not use tile received affirmative side of the line angle to 45 degrees splicing bricklayer before grinding beautiful, of course, you do not choose Tijuana workers slothful way to do things.


155, aluminum pipe, when installed must be sealed cement workers in the supervision of the construction standards in accordance to the hot water pipe Reserve space for expansion. Short plastic tube not closed strong, and loose some of good thing.


156, the bathroom floor if higher than the auditorium, the conversion can be used to solve the door stone.


157, plus move the sewer pipe mouth, then the new and old sewer pipes should be retarded before the entry of the old sewer butt is smooth, this time a lot of money to clear the morsel to lest hereafter trouble.


158, Lvkou Ban did not need to buy high-price, very cheap Lvkou Ban has been far better than the effect of PVC, the more money I can not see the effect of significantly different .


159, buy Lvkou Ban particular attention to the keel and not Lvkou Ban itself (Lvkou Ban goal is not easy to tamper too much), the keel often complete ghost.


160, the color of brick is hard to find satisfactory, and I did not find, but the two kinds of color are not satisfied with a staggered mosaic sub can approach 45 degrees but I am very satisfied with the results. This is indeed the bricklayer himself put forward good suggestions.



161, under the supervision of the ground water offensive to use is not in accordance with the requirements of my bricklayer but directly gushed on the ground, it can even do! It is not the best yourself, do not perturb but insistent.


162, the slope of the bathroom floor before tiling to consider the good, the slope is not in accordance with national standard to achieve the effect of fast drainage, and if you use a deodorant or a thin floor drain floor drain will be greatly increased drainage problems. Some people say that steep slope and pretty, I think it is nonsense. Instead larger slope water to speedily run a very clean and is very comfortable thing.


163, the LG door with platinum point fire board, the effect is good, but might consider if we made the decoration finished door. The door by hand is not refined, for reference only.


164, sink big market brand-name price is not low, brand-name quality lunatic bad.


165, the balcony door is best to use the same type of fire board. Balcony environment is harsher.


166, bathroom vanities and cabinets to do when they must consider the size of basin lest good fit in the future.


167, the glass is heavy stuff, the best buy in the vicinity, or first think of a good means of transport.


168, install the lock bolt head should pay attention to some wax, crashing to a December to late. If you do not smoke, then the door handle must be taken to avoid damage to wall.


169, matte paint is high and light is beautiful, do not listen to the painter, and if I were you brushed matte painter, said that its technology must be bad. Similarly, if a good painter, said polyester polyurethane is not lying to you


170, insulating tape and Teflon tape in the store to buy another large supermarket was much better quality, and full weight, conversion down the price is not expensive.



171, if the re-decoration will be used instead of talc putty achieved, no big reason is that finished product easy to use putty. Especially after the painter fired when their own experience diy - talc intonation putty sick of it.


172, installation and air leakage conservation switch junction box of the project can not be provincial, but not on the outside to be on the internal, the native remuneration will want to retention the old junction carton outside the use, electrician recommended a current one on the interior, and now thathe suggested this invaluable. On the interior door is not bad, it truly easy to use!


173, large decorating corporation instantly to the workers on site clearance work may be more appropriate archive, and better technology,GHD Leopard Grain, tools, more


174, and air leakage protection switch to use the best brands. I used the Want to buy the real thing is simple, direct call MGE investigation headquarters phone number and called to ask the local branch number.


175, the audience slight pots pots than on stage, good-looking, good cleaning.


176, basin faucet with the spectators to pay attention, catching into account the basin brim thickness, guiding to the mouth longer.


177, the hole in front of the toilet installation is a big, large floor drain cover can fall off, if you have installed the toilet floor drain is not installed, do pay attention to floor drain cover, or the floor drain Ye Hao lid kept it up somewhere.


178, buy silicone, then the utter best all imports of GE, GE followed by Shanghai packaging. Of course, if very important place in the 7,8 unit that can also be used, such as aluminum window frames with internal Anjiu levels of silica waste to plug the whole. However, all use the bathroom GE silicone kitchen, merit for money!


179, triangular valves should not be omitted, and save much money, if the words of the triangle valve, triangle valve to be installed in advance of copper joints are not leaking, if I were you installed, then only the last copper fittings installed on the faucet to take over the child when it was installed to check whether the inner leakage, the total leakage to pressure some time to test it, and install internal and less safe if the lead.


180, even in the memo has been renovated to be done about those things, their own can do it, do not, but also with the idea, amuse decoration companies to communicate more with the designer, amuse construction team to communicate more with the workers, because the comprehension of your ideas, to depend on them.




181, fitting the biggest problem is communication!


182, little place, kitchen cabinet door type designed, BH. L-type should be designed.


183, general decoration, decoration companies, excluding the formal management fees, tariffs, fares accounted for 75-80 percent sign materials, wages account for 20-25 percent sign.


184, go in the kitchen on the ground outside the pipe, that is, from home improvement to a time mine, who say where Shashi Hou himself in trouble.


185, if the separate tube wear, but in a tank of great? Effects can endure


186, ask what the canteen and living room are separated between the most cost-effective package Door, side package only 6 cm, or polluted with pearly, height 2 m, was not large High crude.


187, mighty and feeble power convey to each tube, to divide the best way, keep the distance of 10 cm or more, but it can be difficult, because most families in order to save prices and to open a slot. Weak audio line can see the same pipe.


188, inside furniture, paint and paste board can do a good job and opened the door and ventilation doors and windows at home, only to no pungent odor. In fact, you are using a good wood core board, do not deal with furniture inside.


189, the cabinet can be 15 cm plates and lumber essence embark, the back of the five available folders, Wuli. Package doors and Tizi use nine per cent. Different materials with different techniques.


190, PPR pipe not only for cold water pipes, but also for hot water pipes, and even clean drinking water pipeline. PPR pipe interface with hot-melt technology, are completely integrated into the tubes together, so once installed oppression test, no leakage. PPR pipe and will not scale. PPR pipe scale not known, never rust, never leakage, green high water material.


191, paint board is good, the avails of both wood and composite.


192, do not publish for a long time on the wet false stone, unless you want to dry a printing surface; they should not be long-term wet cutting board on the table. Wet wood is periodically fade; rub the stain with a steel ball, like hand squeeze pimples.


193, can use an ordinary gas meter in the cabinet door closed it? Need to use the shutter-type door it? Check regularly open air on the line.


194, clear contracting the tx Please memorandum, we must validate the renovation team give you a list of substances. Their estimates may be me, I also deem that they, and the results of wires and line to buy is nearly doubled.


195, the size of definite maneuvered sanitary ware, the best sketch in advance, count the size.


196, students pay attention to the door to buy products, if you want to pursue results support the panel with the business package Door, then you may must be Henzai sword it!


197, Re: installation of water pipes are put before the leader and basin, sink have bought?
not, just determine where is the basin faucet, bathtub faucet, washing machine what's on the line leading, leading 99 percent sign and fell into the water are in line with international norms, at the peak of workers are not reckless, all right. If you own basin cabinet, basin bought in advance, or optimistic about the size. In front of the sink to determine the amount of good size units, installed in front of buy Haojiu Hang Taiwan, do not forget that the audience or on stage. Distance between hot and cold water pipes with cement tiles must be accurate before the closure of 15 cm, and must be parallel. If you have bought, it is best put something, such as sealed after the discharge.


198, if an 8-core cable at the same time take the phone and web, will not interfere with each other it? Not. 1,2,3,6 kick cable module, 4,5 kick the phone module, and the other two accessible. My experience was right: 10M by 1236 100M in truth used to have the speed to 10/100M that we will not feel any different. If a 8pin line, then the whistle will cause some program-controlled switches on the network marker interference in the home environment generally will not have any problem. But rest guaranteed that I can recommend such a route will leave apart to the margin, the network cable is very cheap that you say?


199, be sure to check the delivery box installed properly.


200, fitted bath and shower faucet lessons connected to the faucet pipe is embedded in the wall, and I again told them to size to get exact, not to pretend not in due time. The results left a hot and cold water is 15 cm spacing, can be hot and cold water pipes are not collateral, the result took a plumber just put on the force feeding. Yesterday discovered that my fb leading high temperature coating device actually does get cracked. If we can first load leading to the first installed it. Leader should be bought first, then install hot and cold water pipes, tiling it. Oujia bought early leader, is Oujia master to buy.
  Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT. The time now is 07:20 AM.

 

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum