,
brand jeans
PAT transmission security in consensus with the recent reconstruction and restoration of the class of the general fancy, 214 State Road, has begun construction of double trail started to rule more and more at the complex inter-channel Nangqian County Road segment facilities construction and reconstruction namely accelerating the pace of rural road repair and road segment, Passenger Station facilities simultaneously. At the same time, simultaneously begin construction this year to Yushu Old Republic II, likewise a road, established in 3 years; and then 2 years to alter the existing 214 line, and strive to Xining to Yushu 5 years to effect high-speed highway. (Stars)
face the complicated mission of transport,
Strong surge of cold air will affect the temperature drop in most areas of China 6-8 ℃, the transport sector in our province attaches excellent magnitude to co-ordinate arrangements, shreds composition of fine ordered by the arrangement, scientific and reasonable organization, hard work, do not disturb vehicle in the not long linger conveyances at the same time, strive to 3 years to complete the main mission of restoration and reconstruction of disaster areas in five years, Yushu to Xining to achieve high-speed highway.
to fully grab State Road 214, and 308 provincial highway pass key security, the Provincial Communications Department has yet started the road amplifying and the concentration and control disease. Currently, the approach taken by the dynamic design and construction group management approximate, to speed up the progress of PAT, 214 as the Yellow River Bridge and State Road Huashixia Maduo the war readiness of the bridge steel bridge erected at the end of May to complete the whole project completed in July 15. PAT in the 3-year period to assure the construction team will not be dismantled,
cheap kids jordans, to do with the wrong with the repair, with repair with the pass. To ensure the orderly reconstruction of merchandise transport, the Office of Transport Security has also developed implementation plan, the new estimate has been admitted freight, along the road authority and governance over all personnel in place, focusing on the transportation of materials, focus on transportation from the start.
Yushu after the earthquake, the province transportation division quickly fired the crisis intend, to pass and guardian looting relief Yushu is situated in the heart of the Three Rivers Conservation Area, there is no regional contractors of building materials, do not pass the railroad,
Zijin Mining accidents due to water leakage fined 9.56 million yuan, a massive number of reconstruction materials to be by road transport. It is estimated that 3 years post-disaster reconstruction Yushu material transport absences of more than 23 million tons, building construction ambition approach 32 thousand tons a day alternatively so. In increase,
ed hardy jeans for women, the cardinal access into the disaster areas currently only State Road 214 and Highway 308, two roads over 1400 km, of which 900 kilometers is situated in the permafrost region, long service life, low-grade roads, carrying capability is feeble, the access a lot of dangerous bridge Wei Han is still in the Coupled with conservation of the long road, by the air,
paul smith outlet,
vibram 5 fingers bikila Zhengzhou Shiyuan explosion water ma, needy context, and short construction phase,
tods loafers, will make the transport sector is facing unprecedented pressure.
Yushu reconstruction