Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums

Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums (http://www.freeadvertisingzone.com/index.php)
-   Free Link Exchange (http://www.freeadvertisingzone.com/forumdisplay.php?f=65)
-   -   Close Shanghai Line 7 through Line 1 Shield tunnel (http://www.freeadvertisingzone.com/showthread.php?t=1214048)

ally47953 05-17-2011 12:34 PM

Close Shanghai Line 7 through Line 1 Shield tunnel
 
Restaurant was traced as E light Village Road

car crossed a lot of trail from the truck in the village , very fast , and I heard the car is assembled out of scrap cars ... [more ]
on gym lockers 6100 dollars missing

The fitness center locker key with the sensor , the young man feel very fresh, the lockers as a safe ... [more ]

the new network on January 18 Zhejiang Power Shield Line 7 to Recently, Shanghai is China rail builders are again cross- shield construction and technological breakthroughs . Rail cross- Line 7 Changshu Road Station to Station Zhaojiabang work well shield between line 1 and the rail tunnel cross from less than 15 meters, the two 6.34 m diameter shield machine will just start the tunnel from the bottom through line 1
Shield through two successful , the technical quality of the project are testing ( Yonghe / photo )
】 【 into the Photo Channel ->
the new network on January 18 Zhejiang Power Line 7 Shield Agencies to Recently, Shanghai is China rail builders are again cross- shield construction and technological breakthroughs .

tracks cross Route 7 Changshu Road Station to Station Zhaojiabang work well shield between line 1 and the rail tunnel to pay less than 15 meters away , two 6.34 m diameter,christian louboutin flats, the shield will just start Tunnel from the bottom through line 1 , separated by only 1.5 meters. Construction headquarters directed the construction of Line 1 of shield tunnel of no larger than 5 mm. To this end, shield speed control in less than 5 mm per minute , was dubbed the Construction of more than 30 days , technicians rely on


All times are GMT. The time now is 01:46 PM.

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum